473 Issues Found in a Coastal Restaurant Permit Set
Egress, life safety, structural, and MEP conflicts—caught before plan review.
The Project
An anonymized coastal restaurant renovation with a full permit set and referenced codes (IBC 2021, IEBC 2021, IFC 2018, IMC 2018, IPC 2018, IECC 2018). InspectMind cross-checked Architectural, Structural, Mechanical, Electrical, Plumbing, Fire Protection, and Civil—flagging critical compliance and coordination issues prior to submission.
Sample Findings
Floor Plan Mismatch Across Disciplines
Electrical “First Floor” plan shows service/utility rooms while the architectural first floor shows dining/retail—indicating a level mismatch.
Missing Exit Signs and Stair Illumination
Lighting plans omitted exit sign symbols and stairway fixtures in required egress paths.
Insufficient Exits for Assembly Occupancy
Level 2 assembly areas show only one exit stair despite an occupant load exceeding 50.
Wind-Borne Debris Region Conflicts
Wind speed criteria indicated a debris region, but glazing specs called for non-laminated glass.
Grease Waste System Missing Interceptor
Grease waste piping shown without a required interceptor, creating a code violation and inspection risk.
Why It Matters
"We caught multiple permit blockers in a single review—egress, signage, and wind-zone glazing conflicts. Fixing them early saved weeks."
— Project Team (Anonymized)
Want a fast plan review before permit?
Upload your drawings, specs, and codes. Get a prioritized issue list in hours.
One issue found pays for the whole check
