Back to Case Studies
HospitalityRestaurantCoastalAnonymized

473 Issues Found in a Coastal Restaurant Permit Set

Egress, life safety, structural, and MEP conflicts—caught before plan review.

473
Issues Flagged
193
Critical Issues
7
Disciplines

The Project

An anonymized coastal restaurant renovation with a full permit set and referenced codes (IBC 2021, IEBC 2021, IFC 2018, IMC 2018, IPC 2018, IECC 2018). InspectMind cross-checked Architectural, Structural, Mechanical, Electrical, Plumbing, Fire Protection, and Civil—flagging critical compliance and coordination issues prior to submission.

Sample Findings

Floor Plan Mismatch Across Disciplines

Electrical “First Floor” plan shows service/utility rooms while the architectural first floor shows dining/retail—indicating a level mismatch.

Missing Exit Signs and Stair Illumination

Lighting plans omitted exit sign symbols and stairway fixtures in required egress paths.

Insufficient Exits for Assembly Occupancy

Level 2 assembly areas show only one exit stair despite an occupant load exceeding 50.

Wind-Borne Debris Region Conflicts

Wind speed criteria indicated a debris region, but glazing specs called for non-laminated glass.

Grease Waste System Missing Interceptor

Grease waste piping shown without a required interceptor, creating a code violation and inspection risk.

Why It Matters

Prevented permit rejection and redesign loops
Reduced life-safety and egress risk
Surfaced coastal wind and envelope compliance gaps
Clarified scope across A/E/MEP documents

"We caught multiple permit blockers in a single review—egress, signage, and wind-zone glazing conflicts. Fixing them early saved weeks."

— Project Team (Anonymized)

Want a fast plan review before permit?

Upload your drawings, specs, and codes. Get a prioritized issue list in hours.

5+ issues or full refund
Results in hours
Demo optional

One issue found pays for the whole check