Back to Case Studies
K-12 EducationCalifornia

2,102 Issues Caught Before DSA Review in a K-12 Whole Site Modernization

Cross-discipline code violations, accessibility gaps, and MEP coordination conflicts flagged early to prevent costly redesign and plan-check delays.

2,102
Issues Found
10+
Disciplines
DSA
Review Path

The Project

A multi-building K-12 campus modernization with classroom upgrades, sitework, accessibility improvements, and MEP system replacements. The project required alignment across architectural, structural, civil, electrical, mechanical, plumbing, fire protection, and life-safety scopes under DSA oversight.

2022 CBCCBC 11BTitle 24NFPA 13DSA IR 16-8

Sample Findings

Accessibility (CBC 11B)

Missing accessible routes between buildings, ramp slope conflicts, and toilet room clearances that violated turning radius requirements.

Life Safety & Egress

Exit signage gaps, inconsistent occupant load calculations, and corridor fire-rating details that conflicted between plans and specs.

Structural/Seismic

Seismic bracing omissions at new canopies and equipment platforms, plus detailing conflicts between structural sheets and architectural sections.

MEP Coordination

HVAC equipment clearances and duct routing conflicts with ceiling heights and lighting layouts across multiple buildings.

Value Delivered

2,102 issues prioritized before DSA review
Reduced risk of plan-check cycles and redesign
Cross-discipline conflicts resolved pre-permit
Clear audit trail for code citations and fixes

"This review surfaced conflicts that would have triggered multiple DSA comment rounds. We fixed them once, before submittal."

— Project Team

Catch Issues Before They Reach Plan Check

Upload your drawings and get a prioritized issue list—before permitting.

5+ issues or full refund
Results in hours
Demo optional

One issue found pays for the whole check