Review activity includes 1,700+ completed checks and 187,000+ potential findings retained. Savings below are modeled assumptions, not measured customer outcomes.
12 critical · 46 high · 29 medium (illustrative mix)
A confirmed issue that prevents downstream work can justify a review. Actual value depends on which findings require action and what the team corrects. This model does not predict or guarantee your savings.
Issue count: ~43 potential findings per 100 recorded pages in completed checks with page counts. Document types and review scopes vary.
Severity split: 14% critical / 53% high / 33% medium is the illustrative mix used in this model. It is not a measured accuracy or confirmed-defect rate.
Savings model: We estimate what fraction of issues at each severity would have caused a costly downstream problem (RFI, change order, rework) if not caught during design review. The assumed escape rates are 40% for critical, 20% for high, and 10% for medium. These are modeling assumptions, not observed outcomes.
Cost per escaped issue: Critical $10K to $50K (scales with project value, rework on a $50M project costs more than on a $1M project), high $2K to $8K (RFI and delay), medium $1.5K (minor rework). These are scenario inputs, not customer-verified savings.
Trusted by 600+ companies, with 187K+ potential issues across 1,700+ completed checks