A prefabricated ADU (Accessory Dwelling Unit) project in California using manufacturer-provided plans adapted for a specific site. InspectMind reviewed the combined drawing set and identified fundamental conflicts in property identification, easement encroachment, dimensional discrepancies between manufacturer specs and site plans, and California Building Code violations— issues that would have caused permit rejection and costly redesign.

2022 CA Building CodeCalifornia Plumbing CodeCBC Section 915CBC Section 1134A

Sample Findings

CriticalProperty APN Conflict

Project Data shows APN 684-16-022, but Site Plan labels the development lot as APN 684-16-023—a fundamental contradiction in identifying the project site.

CriticalBuilding Encroaches into Recorded Easement

Building setback at 9.6' places structure 10.4 feet inside a recorded 20' Light and Air Easement—will be rejected at plan check.

Critical2-Foot Length Discrepancy

Site plans show 44'-0" ADU length, but manufacturer plans sum to 42'-2" and title blocks reference "14X42" model—affects foundations and setbacks.

High26" Bridge Blocks for 24" O.C. Spacing

Note specifies 26" bridge blocks for 24" O.C. truss spacing—physically impossible since blocks are longer than the bay spacing.

HighMissing Egress at 18" Stem Wall

Exterior doors sit atop 18" stem wall with no landings, stairs, or ramps shown—occupants cannot safely exit the building.

HighMissing CO Detection

Fuel-burning water heater and furnace present, but only smoke detectors shown—no CO detection as required by CBC Section 915.1.1.

Issue Categories

Site & Property Identification

APN conflicts, property boundaries, easement encroachments

Code Compliance

Egress, accessibility, door widths, CO detection

Dimensional Conflicts

Plan vs. manufacturer specs, impossible framing dimensions

Plumbing & MEP

Drain sizing, fitting conflicts, cleanout adequacy

Value Delivered

21 issues surfaced before permit submission
Critical property/easement conflicts identified
California Building Code violations flagged
Manufacturer vs. site plan discrepancies caught

"The APN conflict and easement encroachment would have killed this project at plan check. Finding these issues before submittal saved us months of redesign."

— Project Team

Want This on Your Next Set?

Fast turnaround. Prioritized issue list with code references.

5+ issues or full refund
Results in hours
Demo optional

One issue found pays for the whole check