Bold Court ADU: 21 Issues Including Property Conflicts
APN inconsistencies, easement encroachment, and California Building Code violations, surfaced before permit submission.
First $100 covered. Enterprise and volume pricing
- Issues found
- 21
- Code referenced
- 2022 CBC
- Critical issues
- 3
The project
A prefabricated ADU (Accessory Dwelling Unit) project in California using manufacturer-provided plans adapted for a specific site. InspectMind reviewed the combined drawing set and identified fundamental conflicts in property identification, easement encroachment, dimensional discrepancies between manufacturer specs and site plans, and California Building Code violations, issues that would have caused permit rejection and costly redesign.
- Project type
- ADU · California · Prefab
Codes referenced: 2022 CA Building Code · California Plumbing Code · CBC Section 915 · CBC Section 1134A
Sample findings
- Critical
Property APN Conflict
Project Data shows APN 684-16-022, but Site Plan labels the development lot as APN 684-16-023, a fundamental contradiction in identifying the project site.
- Critical
Building Encroaches into Recorded Easement
Building setback at 9.6' places structure 10.4 feet inside a recorded 20' Light and Air Easement, will be rejected at plan check.
- Critical
2-Foot Length Discrepancy
Site plans show 44'-0" ADU length, but manufacturer plans sum to 42'-2" and title blocks reference "14X42" model, affects foundations and setbacks.
- High
26" Bridge Blocks for 24" O.C. Spacing
Note specifies 26" bridge blocks for 24" O.C. truss spacing, physically impossible since blocks are longer than the bay spacing.
- High
Missing Egress at 18" Stem Wall
Exterior doors sit atop 18" stem wall with no landings, stairs, or ramps shown, occupants cannot safely exit the building.
- High
Missing CO Detection
Fuel-burning water heater and furnace present, but only smoke detectors shown, no CO detection as required by CBC Section 915.1.1.
Issue categories
- Site & Property Identification
- APN conflicts, property boundaries, easement encroachments
- Code Compliance
- Egress, accessibility, door widths, CO detection
- Dimensional Conflicts
- Plan vs. manufacturer specs, impossible framing dimensions
- Plumbing & MEP
- Drain sizing, fitting conflicts, cleanout adequacy
Value delivered
- 21 issues surfaced before permit submission
- Critical property/easement conflicts identified
- California Building Code violations flagged
- Manufacturer vs. site plan discrepancies caught
“The APN conflict and easement encroachment would have killed this project at plan check. Finding these issues before submittal saved us months of redesign.”
Related case studies
Similar AI plan review results by project type and discipline.
- ResidentialResidential Fireplace Renovation: 28 Issues Including Critical Fire Safety & Document Coordination Violations28 issues · Architectural, Mechanical
- ResidentialResidential Guest House: 16 Issues Found16 issues · Structural, Architectural
- ResidentialSingle-Family Residence: 13 Issues Found14 issues · Architectural, Civil
- Tenant ImprovementMulti-Unit Development: 814 Issues Across 8 Disciplines814 issues · Fire Protection, Structural
- CommercialRetail Store Build-Out: 205 Issues Found in Commercial Construction205 issues · Fire Protection, Structural
- ResidentialResidential Horizontal Addition: 57 Issues Found57 issues · Architectural, Civil