Multi-Floor Commercial TI: 259 Issues Across 6 Disciplines

AI-powered plan review of a three-floor commercial tenant improvement uncovered 259 issues—including 35 critical findings related to fire protection conflicts, seismic bracing prohibitions, and accessibility violations—before permit submission.

259
Total Issues
35
Critical
128
High
95
Medium
1
Low

Issues by Discipline

254
Architectural
47
Structural
27
Fire Protection
8
Plumbing
7
Electrical

Critical Findings

Fire-Rated Wall Infill Conflicts

General note specifies single-layer gypsum for all infills, but legend shows 2-hour fire-resistive walls requiring double layers. Single layer only provides 1-hour rating.

CBC 714

Egress Hardware Incompatibility

Hardware set specifies mortise lock on door with existing rim panic device. These are mechanically incompatible—requiring two motions to exit instead of one.

CBC 1010.2.1

Seismic Bracing Prohibition in High Seismic Zone

Note prohibits diagonal bracing for soffits in feature ceiling areas, but project is in Seismic Zone D/E/F where bracing is required.

CBC 808.1

Non-Existent Anchor Product Specified

Detail calls for 1/4" Hilti Kwik Bolt TZ, but this product doesn't exist in 1/4" diameter—minimum available is 3/8".

ICC-ES ESR-4266

Accessible Turning Space Obstructed

Required 60" wheelchair turning diameter overlaps the water closet fixture, making the turning maneuver physically impossible.

ICC A117.1 Section 304

Expired Building Code Referenced

Drawings reference 2019 CBC for seismic parameters, which has been superseded by 2022 CBC with significant methodological changes.

CBC 1613A.2.2

What We Reviewed

Drawing Set

  • Architectural floor plans (3 floors)
  • Reflected ceiling plans
  • Interior elevations & restroom details
  • Door schedule & hardware sets
  • Partition types & framing details
  • Finish plans & specifications

Code References

  • 2022 California Building Code
  • 2024 International Building Code
  • CBC Chapter 11B (Accessibility)
  • CBC Chapter 7 (Fire Protection)
  • ICC-ES ESR-4266 (Anchor Systems)
  • Structural loads (Seismic Design)

Key Takeaways

Fire Protection Gaps

27 fire protection issues including fire-rated assembly conflicts, missing firestop specs, and non-rated glazing in 90-minute doors.

Structural Conflicts

47 structural issues including seismic bracing prohibitions, undersized studs, and invalid anchor specifications.

Accessibility Violations

Multiple CBC 11B violations including obstructed turning spaces, excessive reach ranges, and missing knee clearances.

Disclaimer: This case study represents real findings from an AI-assisted plan review. All customer-identifying information has been removed. Issue counts and categories reflect the actual project scope.