California Suburban Retail Shell: 2 Issues Found
Anonymized retail shell set; quick-turn QA on a small coordinated package.
Enterprise & volume pricing
Key findings
Drawing Index Audit: 3 missing, 0 mismatched, 3 minor mismatches out of 6 indexed pages
General
6 indexed pages | 0 match | 3 minor mismatch | 0 mismatch | 3 missing Minor Mismatch (3): A0.00: Expected: COVER SHEET (A0.00) | Actual: COVER SHEET (A0.0)(p1) | Reason: Same cover sheet on page 1; only a minor sheet-number formatting difference (A0.00 vs A0.0). A1.00: Expected: SITE PLAN (A1.00) | Actual: SITE PLAN...
General Note K states daily removal for combustible debris, rubbish, and waste material instead of the code-required...
Architectural
General Note K states that combustible debris, rubbish, and waste material shall be removed from the building daily. Section 3305.2.2 requires removal from buildings at the end of each shift of work. The verified issue is the mismatch between the note's stated daily removal frequency and the code's end-of-shift requirement.
Issue categories
More example findings
Drawing Index Audit: 3 missing, 0 mismatched, 3 minor mismatches out of 6 indexed pagesGeneralCritical
Summary: 6 indexed pages | 0 match | 3 minor mismatch | 0 mismatch | 3 missing Minor Mismatch (3): A0.00: Expected: COVER SHEET (A0.00) | Actual: COVER SHEET (A0.0)(p1) | Reason: Same cover sheet on page 1; only a minor sheet-number formatting difference (A0.00 vs A0.0). A1.00: Expected: SITE PLAN (A1.00) | Actual: SITE PLAN...
Why it matters:
Suggested next step:
RFI draft: 📄 A0.0 Schedule Text: DRAWING INDEX — page 1
General Note K states daily removal for combustible debris, rubbish, and waste material instead of the code-required...ArchitecturalHigh
Summary: General Note K states that combustible debris, rubbish, and waste material shall be removed from the building daily. Section 3305.2.2 requires removal from buildings at the end of each shift of work. The verified issue is the mismatch between the note's stated daily removal frequency and the code's end-of-shift requirement.
Why it matters: Because Note K uses 'daily' rather than the code phrase 'at the end of each shift of work,' the drawing instruction should be revised to explicitly match Section 3305.2.2.
Suggested next step: Please revise General Note K to require combustible debris, rubbish, and waste material to be removed from the building at the end of each shift of work, or otherwise clarify how the note complies with Section 3305.2.2.
RFI draft: Please revise General Note K to require combustible debris, rubbish, and waste material to be removed from the building at the end of each shift of work, or otherwise clarify how the note complies with Section 3305.2.2.
This case study uses anonymized project data. Details are generalized for confidentiality. Findings illustrate the type of issues InspectMind surfaces before permit or construction.
Related case studies
Similar AI plan review results by project type and discipline. Browse all case studies
Want this on your next set?
Start with the first $100 covered. See cited issues in hours, no call required.
- Median 87 issues per project
- 5+ issues or full refund
- Results in hours
5+ issues or full refund · No demo required