InspectMind AI logo InspectMind

Plan Review: 137 Issues Found

An anonymized plan review uncovered coordination and code issues across disciplines, before permit.

First $100 covered. Enterprise and volume pricing

Potential findings
137
Disciplines
3
Codes referenced
7
Critical or high examples shown
15

About this review

InspectMind ran an AI plan review on this project set and returned 137 potential findings across Architectural, General, Structural. The selected examples below show the document conflict, why it matters, and a suggested next step.

Disciplines
Architectural, General, Structural
Potential findings
137
Examples shown
15

Key findings

  1. Drawing Index Audit: 45 missing, 1 mismatched out of 71 sheets

    General

    Critical

    71 index entries | 25 perfect matches | 1 mismatched | 45 missing Mismatched (1): G002: Expected: PROJECT INFORMATION (G002) | Actual: PROJECT INFORMATION (G001)(p2) Missing (45), listed in drawing index but not found in the document: Architectural: - A001 DEMOLISHED SITE PLAN - A160 OVERALL 6TH FLOOR PLAN - A503 ENLARGED ELEVATOR #1 PLANS & SECTION - A507 ENLA...

  2. Non-Compliant 'Reduced Class B' Lap Splice Specified for Seismic Boundary Elements

    General · ACI 318 as amended in Section 1905 of this code.

    Critical

    The drawings specify a 'REDUCED CLASS B(7)' lap splice in the 'LAP SPLICE OF LONGITUDINAL GR60 REBAR (IN)' schedule, providing splice lengths that are equal to a Class A lap splice (1.0 Ld) rather than standard Class B lengths (1.3 Ld). Note 7 explicitly directs the use of this 'REDUCED CLASS B LAP SPLICE' at columns and shear wall boundary members. This violates building code requirements, as ...

  3. Top-Mount Joist Hanger Specified to be Installed Upside Down

    General

    Critical

    Detail 7 specifies a "TOP MOUNT TYPE HANGER" to be installed "UPSIDE DOWN," with the "CONTINUOUS BEAM SUPPORTED BY HANGER FLANGE." Top-mount hanger flanges are specifically designed to hook over and bear entirely on top of a supporting member to transfer load via direct bearing. Inverting the hanger and using its thin-gauge steel top flanges as an unsupported bearing seat for a gravity-loaded b...

  4. Exposed Combustible Framing in Elevator Hoistway Enclosure

    Architectural

    Critical

    The 'ELEVATOR GUIDE RAIL SUPPORT DETAIL' shows a steel connection plate attached directly to bare wood framing ('2-2x RIMBOARD OR 2-1 3/4"x LSL RIMBOARD') on the 'ELEVATOR SIDE'. The detail explicitly notes that the connection is to 'WOOD FRAMING' and the plate must 'MATCH FRAMING DEPTH'. This configuration exposes combustible structural wood framing directly to the elevator hoistway without an...

  5. Misaligned Location of Secondary Stair (Stair #2)

    Architectural

    Critical

    The Architectural plan locates the secondary stair (STAIR #2 430) along the mid-eastern wall. However, the Structural framing plan designates the northeast corner for the stair (D/B STAIR BY OTHERS) and frames the mid-eastern area with solid floor joists (FJ-1).

  6. Contradicting Exterior Wall Thickness at Eastern Property Line (Grid R)

    Structural

    Critical

    The structural foundation plan (S2.01) specifies the eastern perimeter wall along Grid R (adjacent to Stair #2) as a concrete shear wall (SW10A) with a thickness of 1'-6" (18 inches). In contrast, the architectural slab plan (A111) explicitly dimensions this same exterior wall segment as a 10 7/8" concrete wall.

  7. Stair #1 Grid Coordinate Misalignment

    Architectural

    Critical

    The Overall 1st Floor Plan (A110) locates Stair #1 to the east of vertical Grid E, with Grid E passing along the western edge of the adjacent elevator core. In direct contradiction, the Enlarged Stair 1 Plan (A500) shows vertical Grid E running directly through the center of Stair #1. Furthermore, A500 locates the stair between horizontal grids 7 and 8, which do not appear in this area on the o...

  8. Floor Level Discrepancy Between Shear Wall and Tiedown Schedules

    General

    Critical

    The Stacking Shear Wall Schedule on S2.04 indicates that wood shear walls extend down to the "2ND TO 3RD" level. However, the Tiedown Run Schedule on S1.52 only provides forces down to the "3rd FLOOR" and then immediately calls for the "CONCRETE OR CMU SUBSTRATE" anchor connection below it, omitting the 2nd floor entirely.

  9. Stair 2 4th Floor door head clearance violates minimum requirement

    General

    Critical

    The general sheet notes explicitly state to "MAINTAIN 6'-8" HEAD CLEARANCE AT ALL STAIRS". However, the Stair 2 enlarged section dimensions the head clearance specifically at the 4th-floor doorway as "5'-4 3/8" CLR", which contradicts this requirement.

  10. Boundary Element Transverse Reinforcement Extension is Undersized per ACI 318

    General · ACI 318 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE"

    Critical

    Detail 3 shows boundary ties extending only '1'-0"' into the foundation. The project specification requires all concrete construction to conform to the latest ACI 318 and designates the structure as Seismic Design Category D with R = 5 (Special Concrete Shear Wall). Standard practice and ACI 318 Section 18.10.2.3 require transverse reinforcement of special boundary elements to extend into the s...

Issue categories

Architectural
Egress, accessibility, room layouts, building code compliance, and finish specifications
Structural
Structural connections, load paths, foundation design, and structural code compliance
General
Drawing index, coordination, and general plan review findings

Review details and suggested questions

Drawing Index Audit: 45 missing, 1 mismatched out of 71 sheets

General

Critical

Summary: 71 index entries | 25 perfect matches | 1 mismatched | 45 missing Mismatched (1): G002: Expected: PROJECT INFORMATION (G002) | Actual: PROJECT INFORMATION (G001)(p2) Missing (45), listed in drawing index but not found in the document: Architectural: - A001 DEMOLISHED SITE PLAN - A160 OVERALL 6TH FLOOR PLAN - A503 ENLARGED ELEVATOR #1 PLANS & SECTION - A507 ENLA...

Why it matters: Addressing this before construction prevents rework and supports code compliance.

Suggested next step: Review drawings and specifications to resolve before construction.

RFI draft: Please clarify: Drawing Index Audit: 45 missing, 1 mismatched out of 71 sheets

Non-Compliant 'Reduced Class B' Lap Splice Specified for Seismic Boundary Elements

General · ACI 318 as amended in Section 1905 of this code.

Critical

Summary: The drawings specify a 'REDUCED CLASS B(7)' lap splice in the 'LAP SPLICE OF LONGITUDINAL GR60 REBAR (IN)' schedule, providing splice lengths that are equal to a Class A lap splice (1.0 Ld) rather than standard Class B lengths (1.3 Ld). Note 7 explicitly directs the use of this 'REDUCED CLASS B LAP SPLICE' at columns and shear wall boundary members. This violates building code requirements, as ...

Why it matters: Applying a reduced, non-compliant lap splice length in critical seismic force-resisting elements severely compromises the structural integrity of the building. A shortened lap splice in these critical boundary zones can lead to non-ductile failure of the reinforcement splicing during a seismic ev...

Suggested next step: Please revise the 'DEVELOPMENT AND SPLICE OF REBAR IN CONCRETE' schedule and Note 7 to require full Class B tension lap splices (1.3 Ld) for all columns and shear wall boundary elements, in accordance with ACI 318 seismic detailing requirements.

RFI draft: Please revise the 'DEVELOPMENT AND SPLICE OF REBAR IN CONCRETE' schedule and Note 7 to require full Class B tension lap splices (1.3 Ld) for all columns and shear wall boundary elements, in accordance with ACI 318 seismic detailing requirements.

Top-Mount Joist Hanger Specified to be Installed Upside Down

General

Critical

Summary: Detail 7 specifies a "TOP MOUNT TYPE HANGER" to be installed "UPSIDE DOWN," with the "CONTINUOUS BEAM SUPPORTED BY HANGER FLANGE." Top-mount hanger flanges are specifically designed to hook over and bear entirely on top of a supporting member to transfer load via direct bearing. Inverting the hanger and using its thin-gauge steel top flanges as an unsupported bearing seat for a gravity-loaded b...

Why it matters: Placing top-mount hanger flanges in unsupported bending under a continuous gravity load presents a severe risk of structural failure and collapse at the connection.

Suggested next step: Remove the inverted top-mount hanger detail. Specify a properly designed inverted hanger, a bottom-bearing hanger assembly, or custom hardware configuration expressly approved by the manufacturer for this specific load path.

RFI draft: Remove the inverted top-mount hanger detail. Specify a properly designed inverted hanger, a bottom-bearing hanger assembly, or custom hardware configuration expressly approved by the manufacturer for this specific load path.

Exposed Combustible Framing in Elevator Hoistway Enclosure

Architectural

Critical

Summary: The 'ELEVATOR GUIDE RAIL SUPPORT DETAIL' shows a steel connection plate attached directly to bare wood framing ('2-2x RIMBOARD OR 2-1 3/4"x LSL RIMBOARD') on the 'ELEVATOR SIDE'. The detail explicitly notes that the connection is to 'WOOD FRAMING' and the plate must 'MATCH FRAMING DEPTH'. This configuration exposes combustible structural wood framing directly to the elevator hoistway without an...

Why it matters: Section 3002.1 mandates that elevator hoistways must be protected as shaft enclosures, which require continuous fire-resistance-rated construction. Leaving structural wood framing exposed inside the hoistway breaks the continuity of the required fire-rated shaft assembly, creating a critical fire...

Suggested next step: Revise the elevator guide rail support detail to show the required continuous fire-resistance-rated shaft enclosure (e.g., layers of fire-rated gypsum board) separating the hoistway from the wood floor framing. Ensure the guide rail attachment coordinates securely with the rat...

RFI draft: Revise the elevator guide rail support detail to show the required continuous fire-resistance-rated shaft enclosure (e.g., layers of fire-rated gypsum board) separating the hoistway from the wood floor framing. Ensure the guide rail attachment coo...

Misaligned Location of Secondary Stair (Stair #2)

Architectural

Critical

Summary: The Architectural plan locates the secondary stair (STAIR #2 430) along the mid-eastern wall. However, the Structural framing plan designates the northeast corner for the stair (D/B STAIR BY OTHERS) and frames the mid-eastern area with solid floor joists (FJ-1).

Why it matters: This is a critical layout discrepancy. If framing proceeds per the structural drawings, there will be no shaft opening for the architectural stair, and the structural opening in the northeast corner will conflict with the architectural studio unit layout.

Suggested next step: Please confirm the correct location for Stair #2. Update either the Architectural plan to move the stair to the northeast corner, or update the Structural plan to frame the stair opening at the mid-eastern wall and close the northeast corner.

RFI draft: Please confirm the correct location for Stair #2. Update either the Architectural plan to move the stair to the northeast corner, or update the Structural plan to frame the stair opening at the mid-eastern wall and close the northeast corner.

Contradicting Exterior Wall Thickness at Eastern Property Line (Grid R)

Structural

Critical

Summary: The structural foundation plan (S2.01) specifies the eastern perimeter wall along Grid R (adjacent to Stair #2) as a concrete shear wall (SW10A) with a thickness of 1'-6" (18 inches). In contrast, the architectural slab plan (A111) explicitly dimensions this same exterior wall segment as a 10 7/8" concrete wall.

Why it matters: A discrepancy of 7-1/8 inches on an exterior property line wall is critical. The architectural floor plan (A110) requires a tight 7/8" setback from the property line. If the 18-inch structural wall thickness is implemented, the building footprint will either encroach over the property line or sig...

Suggested next step: Please clarify the correct thickness for the eastern exterior wall along Grid R. Should it be 1'-6" as per the structural drawings or 10-7/8" as indicated on the architectural plans? Please ensure the 7/8" property line setback and interior stair clearances are maintained.

RFI draft: Please clarify the correct thickness for the eastern exterior wall along Grid R. Should it be 1'-6" as per the structural drawings or 10-7/8" as indicated on the architectural plans? Please ensure the 7/8" property line setback and interior stair ...

Stair #1 Grid Coordinate Misalignment

Architectural

Critical

Summary: The Overall 1st Floor Plan (A110) locates Stair #1 to the east of vertical Grid E, with Grid E passing along the western edge of the adjacent elevator core. In direct contradiction, the Enlarged Stair 1 Plan (A500) shows vertical Grid E running directly through the center of Stair #1. Furthermore, A500 locates the stair between horizontal grids 7 and 8, which do not appear in this area on the o...

Why it matters: Inconsistent structural grid lines between overall floor plans and enlarged core plans will cause severe coordination failures during construction layout. The stair shaft will either be framed in the wrong location (shifted horizontally relative to Grid E) or the surrounding rooms and structural ...

Suggested next step: Please clarify the correct grid coordinates for Stair #1. Confirm if vertical Grid E should run west of the stair core (per the overall plan on A110) or center on the stair (per the enlarged plan on A500). Additionally, update the horizontal grid numbering to be consistent acr...

RFI draft: Please clarify the correct grid coordinates for Stair #1. Confirm if vertical Grid E should run west of the stair core (per the overall plan on A110) or center on the stair (per the enlarged plan on A500). Additionally, update the horizontal grid ...

Floor Level Discrepancy Between Shear Wall and Tiedown Schedules

General

Critical

Summary: The Stacking Shear Wall Schedule on S2.04 indicates that wood shear walls extend down to the "2ND TO 3RD" level. However, the Tiedown Run Schedule on S1.52 only provides forces down to the "3rd FLOOR" and then immediately calls for the "CONCRETE OR CMU SUBSTRATE" anchor connection below it, omitting the 2nd floor entirely.

Why it matters: If wood shear walls continue down to the 2nd floor as shown in the stacking schedule, the tiedown runs (which act as the shear wall chords) must also continue through that level. By terminating the scheduled tiedowns at the 3rd floor, the lateral system design is missing critical tension/compress...

Suggested next step: Please clarify the lowest level of wood framing. If wood shear walls extend from the 2nd to 3rd floor per the Stacking Shear Wall Schedule, please provide the required tiedown forces and anchor details for the 2nd floor. If the concrete podium is actually at the 3rd floor, ple...

RFI draft: Please clarify the lowest level of wood framing. If wood shear walls extend from the 2nd to 3rd floor per the Stacking Shear Wall Schedule, please provide the required tiedown forces and anchor details for the 2nd floor. If the concrete podium is ...

Stair 2 4th Floor door head clearance violates minimum requirement

General

Critical

Summary: The general sheet notes explicitly state to "MAINTAIN 6'-8" HEAD CLEARANCE AT ALL STAIRS". However, the Stair 2 enlarged section dimensions the head clearance specifically at the 4th-floor doorway as "5'-4 3/8" CLR", which contradicts this requirement.

Why it matters: A head clearance of 5'-4 3/8" at an egress doorway is a severe life-safety and accessibility violation that will not pass building code review or inspection. This inadequate clearance obstructs safe egress and requires immediate correction, likely involving significant adjustments to the intermed...

Suggested next step: Please review the 4th-floor landing doorway in the Stair 2 section, which is currently dimensioned at 5'-4 3/8" clearance. Advise on the necessary adjustments to the stair geometry, landing elevation, or structural framing to provide the required minimum 6'-8" head clearance.

RFI draft: Please review the 4th-floor landing doorway in the Stair 2 section, which is currently dimensioned at 5'-4 3/8" clearance. Advise on the necessary adjustments to the stair geometry, landing elevation, or structural framing to provide the required ...

Boundary Element Transverse Reinforcement Extension is Undersized per ACI 318

General · ACI 318 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE"

Critical

Summary: Detail 3 shows boundary ties extending only '1'-0"' into the foundation. The project specification requires all concrete construction to conform to the latest ACI 318 and designates the structure as Seismic Design Category D with R = 5 (Special Concrete Shear Wall). Standard practice and ACI 318 Section 18.10.2.3 require transverse reinforcement of special boundary elements to extend into the s...

Why it matters: Failing to extend the boundary element confinement for the full tension development length into the foundation can lead to premature buckling of the longitudinal bars and failure of the boundary element under severe seismic loading. This represents a critical vulnerability in the lateral force-re...

Suggested next step: Please revise the boundary tie foundation extension dimension in Detail 3 from 1'-0" to match the full tension development length (ld) of the boundary longitudinal reinforcement, as required by ACI 318 for special structural walls.

RFI draft: Please revise the boundary tie foundation extension dimension in Detail 3 from 1'-0" to match the full tension development length (ld) of the boundary longitudinal reinforcement, as required by ACI 318 for special structural walls.

Inadequate lap splice length specified for stepped footing

General

Critical

Summary: Detail 2 indicates a lap splice length of "3'-0" MIN" and "30 db" for the continuous footing reinforcement. Standard structural practice and ACI 318 require Class B tension lap splices for continuous footing reinforcement subjected to flexural tension. The general notes also specify that all lap splices must be Class B unless noted otherwise. 30 bar diameters is typically inadequate for a stand...

Why it matters: Specifying an undersized lap splice in a foundation element compromises the structural integrity of the continuous footing and violates code requirements for proper rebar development.

Suggested next step: Please confirm if the "30 db" lap splice specification in Detail 2 should be revised to a Class B lap splice to comply with standard practice for tension lap splices and the general structural notes.

RFI draft: Please confirm if the "30 db" lap splice specification in Detail 2 should be revised to a Class B lap splice to comply with standard practice for tension lap splices and the general structural notes.

Incorrect FAR Total Includes Exempt Parking Area

General

Critical

Summary: The Area Schedule explicitly designates "PARKING (NOT FAR) 6,615 SF", yet this value is included in the schedule's "GRAND TOTAL 55,397 SF". This combined total is then incorrectly stated as the "TOTAL PROVIDED FLOOR AREA" and FAR area in the Project Information block. Additionally, the stated FAR of "3.56:1" does not match mathematically with either the incorrect gross area (55,397 / 12,306 = 4...

Why it matters: Floor Area Ratio (FAR) is a fundamental metric for zoning compliance and entitlement approvals. Presenting mathematically incorrect FAR calculations that improperly include exempt parking areas misrepresents the project's density and will cause immediate rejection of the entitlement application o...

Suggested next step: Revise the Area Schedule to properly exclude the 6,615 SF of parking from the FAR "GRAND TOTAL". Recalculate and update the "PROVIDED FLOOR AREA" and FAR ratio across all project information blocks using the correct FAR area and the 12,306 SF site area.

RFI draft: Revise the Area Schedule to properly exclude the 6,615 SF of parking from the FAR "GRAND TOTAL". Recalculate and update the "PROVIDED FLOOR AREA" and FAR ratio across all project information blocks using the correct FAR area and the 12,306 SF site...

Missing Risk Category in Structural Design Data

General

High

Summary: The 'CODE' section of the general notes lists '2. RISK CATEGORY:' but fails to provide a value.

Why it matters: CBC Sections 1603.1.4 and 1603.1.5 require the Risk Category to be clearly indicated on the construction documents. The Risk Category is a critical parameter that determines the importance factors for wind, snow, and seismic load calculations. Without this value, the environmental load design can...

Suggested next step: Please update the structural notes to provide the project's Risk Category in accordance with CBC 1603.1.4 and 1603.1.5.

RFI draft: Please update the structural notes to provide the project's Risk Category in accordance with CBC 1603.1.4 and 1603.1.5.

Invalid Site Class Designation

General · ASCE 7.

High

Summary: The seismic design data on the structural notes lists 'SITE CLASS: II'.

Why it matters: CBC Section 1613.2.2 mandates that the site class be classified as A, B, C, D, E, or F based on soil properties. 'II' is not a valid site class designation under the code. An accurate site class letter is required to determine the site coefficients and design spectral response acceleration parame...

Suggested next step: Please correct the seismic design data to state a valid Site Class (A, B, C, D, E, or F) as required by CBC 1613.2.2.

RFI draft: Please correct the seismic design data to state a valid Site Class (A, B, C, D, E, or F) as required by CBC 1613.2.2.

Masonry Grouting Lift Height Exceeds Code Maximum

General

High

Summary: The General Notes for Masonry state that 'GROUTING LIFTS GREATER THAN 5'-0" AND NOT MORE THAN 12'-8" (HIGH LIFT GROUT) CAN BE PLACED', which directly contradicts CBC Section 2104.2.4. The building code strictly requires that for high lift grout pours, the grouting must be done in continuous lifts not exceeding 4 feet (or 5 feet 4 inches for 10-inch or wider hollow units). The drawing erroneousl...

Why it matters: Placing masonry grout in single lifts up to 12'-8" exceeds the code maximum and generates excessive hydrostatic pressure against the masonry units. This can cause block form blowouts and significantly increases the risk of voids and poor grout consolidation around reinforcing steel. This fundamen...

Suggested next step: Please revise Masonry General Note 18 to clarify that while the total grout pour height may be up to 12'-8" for high lift grout, the grout must be placed and consolidated in continuous lifts not exceeding 4 feet (or 5 feet 4 inches for 10-inch or wider units), in compliance wi...

RFI draft: Please revise Masonry General Note 18 to clarify that while the total grout pour height may be up to 12'-8" for high lift grout, the grout must be placed and consolidated in continuous lifts not exceeding 4 feet (or 5 feet 4 inches for 10-inch or ...

This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.

Similar AI plan review results by project type and discipline.

Browse all case studies