K-12 EducationCalifornia

179 Issues Caught Before Construction on a California K-12 Renovation

Cross-discipline code violations, accessibility gaps, and life-safety conflicts—surfaced before permitting to prevent costly RFIs and rework.

179
Issues Found
8+
Disciplines
6
Code Standards

The Project

A California public elementary school renovation involving classroom modernization, MEP system upgrades, and full accessibility compliance. The project required coordination across architectural, structural, civil, electrical, mechanical, plumbing, and fire protection scopes—all under DSA oversight.

2022 CBCTitle 24NFPA 13CBC 11BASCE 7

Sample Findings

Fire Protection

Sprinkler hydraulic calculation inconsistencies and hazard classification conflicts between drawings and specs.

Accessibility (CBC 11B)

Missing wheelchair-accessible toilet compartments, protruding objects in circulation paths, and reach range violations.

Structural/Seismic

Missing seismic design parameters and unverified reuse of existing ceiling grid systems without bracing verification.

MEP Coordination

Pipe sizing contradictions between riser diagrams and floor plans, fire damper installation errors at rated assemblies.

Value Delivered

Cross-discipline conflicts flagged in one review
Life-safety issues resolved before permitting
Reduced risk of DSA review rejections
Prioritized issue list with code references

"InspectMind caught the kind of cross-discipline conflicts that slip through every manual review—life-safety issues that would have been flagged by inspectors, not by us."

— Project Team

Catch Issues Before They Cost You

Upload your drawings and get a prioritized issue list—before permitting.

5+ issues or full refund
Results in hours
Demo optional

One issue found pays for the whole check