217 Coordination Issues Caught in Healthcare CD Set

Cross-document contradictions, spec conflicts, and healthcare-specific errors— surfaced before RFIs and rework.

217
Issues Flagged
5
Disciplines
Days
Saved vs Manual

The Project

A healthcare facility (Ambulatory Surgery Center + Clinic) with full drawing set and project manual/specs. InspectMind cross-checked drawings and specifications across Architectural, Structural, MEP, Interiors, and Civil disciplines—surfacing contradictions, code conflicts, and healthcare-specific errors in a single automated review.

Sample Findings

Missing Hardware Sets

Door schedule references Hardware Sets E-41 and E-42, but specification only defines sets through HW Set 39—preventing accurate bidding.

Backflow Preventer Location Conflict

Spec requires interior heated location; drawings show exterior vault—direct contradiction with cost implications.

Mop Sink in Clean Supply Room

Healthcare functional error: contamination source located in clean supply room—violates infection control principles.

Potential Missing Radiation Shielding

Wall type at radiology room may not include lead shielding—could require wall reconstruction.

Water Line Burial Depth Mismatch

Spec calls for 72" min; drawings show 42"—a 30" discrepancy affecting excavation scope.

Why It Matters

Fewer RFIs during construction
Fewer change orders from spec/drawing mismatches
Less submittal churn
Reduced schedule risk
Constructability issues caught on paper
Clear scope and responsibility

"The issues InspectMind found would have shown up eventually—but as RFIs, change orders, or inspector holds. Now we catch them before they cost us."

— Project Team

Catch Coordination Issues Before They Cost You

Upload your drawing set and spec book. Get a prioritized issue list in days, not weeks.

5+ issues or full refund
Results in hours
Demo optional

One issue found pays for the whole check