Florida Residential / Commercial: 274 Issues Found

An anonymized plan review in South Florida uncovered coordination and code issues across disciplines, before permit.

First $100 covered. Enterprise and volume pricing

Potential findings
274
Disciplines
2
Codes referenced
4
Critical or high examples shown
15

About this review

InspectMind ran an AI plan review on this project set and returned 274 potential findings across Structural, Architectural. The selected examples below show the document conflict, why it matters, and a suggested next step.

Disciplines
Structural, Architectural
Potential findings
274
Examples shown
15

Key findings

  1. Issue #259

    Structural

    Critical

    Issue #259

  2. Issue #248

    Structural

    Critical

    Issue #248

  3. Issue #245

    Structural

    Critical

    Issue #245

  4. Issue #260

    Structural

    Critical

    Issue #260

  5. Issue #243

    Structural

    Critical

    Issue #243

  6. Issue #222

    Structural

    Critical

    Issue #222

  7. Issue #137

    Structural

    Critical

    Issue #137

  8. Issue #16

    Structural

    Critical

    Issue #16

  9. Issue #44

    Structural

    Critical

    Issue #44

  10. Issue #67

    Structural

    Critical

    Issue #67

Issue categories

Structural
Structural connections, load paths, foundation design, and structural code compliance
Architectural
Egress, accessibility, room layouts, building code compliance, and finish specifications

Review details and suggested questions

Issue #259

Structural

Critical

Summary: Issue #259

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #259

Issue #248

Structural

Critical

Summary: Issue #248

Why it matters: This coordination issue could lead to field conflicts and change orders in Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #248

Issue #245

Structural

Critical

Summary: Issue #245

Why it matters: This coordination issue could lead to field conflicts and change orders in Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #245

Issue #260

Structural

Critical

Summary: Issue #260

Why it matters: This coordination issue could lead to field conflicts and change orders in Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #260

Issue #243

Structural

Critical

Summary: Issue #243

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #243

Issue #222

Structural

Critical

Summary: Issue #222

Why it matters: This coordination issue could lead to field conflicts and change orders in Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #222

Issue #137

Structural

Critical

Summary: Issue #137

Why it matters: This issue could cause code violations and may prevent plan approval for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #137

Issue #16

Structural

Critical

Summary: Issue #16

Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #16

Issue #44

Structural

Critical

Summary: Issue #44

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #44

Issue #67

Structural

Critical

Summary: Issue #67

Why it matters: This coordination issue could lead to field conflicts and change orders in Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #67

Issue #68

Structural

Critical

Summary: Issue #68

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #68

Issue #45

Structural

Critical

Summary: Issue #45

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #45

Issue #89

Structural

Critical

Summary: Issue #89

Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #89

Issue #175

Structural

Critical

Summary: Issue #175

Why it matters: This coordination issue could lead to field conflicts and change orders in Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #175

Issue #122

Structural

Critical

Summary: Issue #122

Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #122

This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.

Similar AI plan review results by project type and discipline.

Browse all case studies