This benchmark isolates mep coordination language in electrical review records. Mechanical, electrical, plumbing, fire-protection, and cross-system coordination. Electrical, lighting, controls, communications, security, and low-voltage records.
8,255
potential findings
530
completed projects
15.6
findings per represented project
Featured topic analysis
Largest mep coordination cohort by finding volume
Electrical records account for 29.8% of findings across the eight published mep coordinationcohorts. This cohort contains 2.2× the median cohort volume, with 3,965 Critical or High-priority findings. These are descriptive counts, not an error-rate comparison.
Severity mix
Severity is the review priority assigned when the potential finding was generated. It is not proof that the project team accepted the finding unchanged.
| Severity | Findings | Share |
|---|---|---|
| critical | 244 | 3% |
| high | 3,721 | 45.1% |
| medium | 3,926 | 47.6% |
| low | 364 | 4.4% |
Compare this topic across disciplines
These counts provide context for the same title-term group in other normalized disciplines. They are not discipline error rates.
How to interpret this benchmark
InspectMind matched disclosed, case-insensitive title terms for this topic, then grouped records by normalized discipline. The source window runs from 2026-03-21 through 2026-09-04. Duplicate, dismissed, insufficient-reference, and previously suppressed findings are excluded.
Categories overlap, so one finding may appear in more than one topic or discipline cohort. Document size, project phase, review scope, and validation status vary. This is evidence about the mix of potential findings surfaced in completed reviews—not a defect rate, an industry prevalence estimate, or a quality ranking.
Privacy threshold
Only aggregate cohorts with at least 10 projects and 25 findings are published. No customer names, project names, addresses, files, account identities, project identifiers, or finding text are present.
Related research and review guidance
- MEP Coordination topic summary and FAQs
- All 2026 drawing issue benchmarks
- 2026 Construction Drawing Error Index
- Guide: MEP Coordination
- Electrical: Specifications, Schedules & References
- Electrical: Fire & Life Safety
- Electrical: Code Compliance
- Electrical: Structural Systems
- Electrical: Building Envelope
- Electrical: Materials & Products