Use Case
Prevent Change Orders Before They Happen
Every change order starts as a drawing issue. AI finds coordination conflicts, spec mismatches, and scope gaps before they hit the field—when they're cheap to fix.
5-15%
of project cost goes to change orders
10x
more expensive to fix in field vs design
70%
of change orders are preventable
What Causes Change Orders—and How AI Prevents Them
Coordination conflicts between disciplines
Example: Duct routing through structural beam locations
AI flags cross-discipline clashes
Spec vs drawing contradictions
Example: TPO membrane specified, EPDM shown in details
AI cross-references specs against drawings
Missing or incomplete details
Example: Connection details referenced but not provided
AI identifies missing information
Dimension mismatches
Example: Structural grid doesn't align with architectural
AI checks cross-sheet consistency
Code compliance gaps
Example: Egress width doesn't meet occupancy requirements
AI verifies code requirements
When to Run AI Review
Before Bid
Know what you're pricing
Before GMP
Protect your contingency
Before Buyout
Cleaner docs for subs
Stop change orders before they start
AI review finds the issues that become change orders—before they cost you.
5+ issues or full refund
Results in hours
Demo optional
One issue found pays for the whole check
