AI Review at Every Design Milestone
Review documents at 50% DD, 90% CD, and 100% CD milestones. Catch coordination issues when they're still easy to fix—not when they're embedded in construction documents.
The Problem with Design Phase QA
No time for thorough review
Design deadlines are tight. Teams rush to meet milestones, and QA gets compressed into the final days.
Issues compound over time
A coordination conflict at DD becomes a spec-drawing contradiction at CD, and a change order during construction.
Review at Every Milestone
50% DD Review
Mid Design Development- Major systems coordination feasibility
- Space planning vs structural grid alignment
- MEP rough system sizing validation
- Building code path of travel issues
- Core and shell vs tenant coordination
Why it matters: Catch fundamental conflicts when design changes are still easy.
90% CD Review
Near CD Completion- Cross-discipline coordination conflicts
- Spec vs drawing contradictions
- Detail reference accuracy
- Schedule completeness and consistency
- Code compliance verification
Why it matters: Final opportunity to catch issues before permit submission.
100% CD / Bid Set Review
Before Permit/Bid- Complete document coordination
- Constructability issues
- Missing information gaps
- Final code compliance check
- Bid-ability review for contractors
Why it matters: Clean documents mean fewer RFIs, change orders, and delays.
Why Review at Design Milestones
Catch Issues Early
Issues found at DD cost 10x less to fix than issues found during construction
Milestone Confidence
Present clean documents to owners and stakeholders at each milestone
Reduce Liability
Document your QA process with systematic AI review at each stage
Track Progress
See how document quality improves from DD to CD to permit
The Cost of Waiting
Every design milestone you skip is another opportunity for issues to become embedded and expensive.
Related pages
Back to
Use Cases
Related
Permit Prep Review
Pre-permit QA to reduce plan check comments
Document Quality
Overall document quality assessment
Bid Document Review
De-risk bids with thorough document analysis
Change Order Prevention
Catch issues before they become change orders
RFI Prevention
Reduce RFIs by catching document issues early
Coordination Review
Cross-discipline coordination analysis
Review your next design milestone with AI
Upload your DD or CD documents. Get a prioritized list of coordination issues before your next milestone presentation.
First free check for eligible work-email signups
Run one real project first. Future checks are pay-per-run, with volume pricing available for teams.
See sample report (282 issues found)
Not sure yet? Upload a completed project you already know. See what we catch, then recheck a revised set or run the next project.
Upload all project PDFs: drawings, specs, codes, checklists, shop drawings, submittals, contracts, zoning codes, city comments. AI checks everything against everything.
187,000+ issues caught across 500+ engineering and construction firms
One issue found pays for the whole check