Subdivision Improvements: 97 Issues Flagged

Compare utility material notes, pipe profiles, and the sheet index before procuring buried infrastructure.

Anonymized review · Published 2026-09-16

First $100 covered. Enterprise and volume pricing

Potential findings
97
Discipline
1
Published examples
3
Critical or high examples shown
3

About this review

InspectMind ran an AI plan review on this infrastructure set and returned 97 potential findings across Civil. The selected examples below show the document conflict, why it matters, and a suggested next step.

Project type
Infrastructure
Disciplines
Civil
Potential findings
97
Published examples
3
Published
2026-09-16
Evidence status
Selected findings marked useful in the source review record

What this review documents

Compare utility material notes, pipe profiles, and the sheet index before procuring buried infrastructure.

The documented result is a set of review findings. This case study does not establish that corrections were completed or that savings were realized. The examples below were marked useful in the source review record; they have been paraphrased to remove identifying details.

Key findings

  1. Sheet index and utility pages disagree

    General & Coordination

    High

    The index audit flagged one missing page and six mismatches in a 31-page indexed set. Several pages labeled as planting or irrigation corresponded to utility plans.

    Next step: Reconcile sheet names and confirm that the intended review set is complete.

  2. Water-main material designation conflicts

    Civil

    High

    A 10-inch water-main note specifies SDR-35 pipe while the accompanying utility standard calls for AWWA C900 PVC.

    Next step: Confirm the pressure-pipe requirement and revise the plan or standard reference.

  3. Storm pipe class differs between plan and profile

    Civil

    High

    The same 140-foot storm-drain run is called Class III reinforced concrete pipe on one drawing and Class V on another.

    Next step: Confirm the required pipe class for the loading and installation conditions.

Issue categories

General & Coordination
General & Coordination findings in the selected review excerpts.
Civil
Civil findings in the selected review excerpts.

Review details and suggested questions

Sheet index and utility pages disagree

General & Coordination

High

Summary: The index audit flagged one missing page and six mismatches in a 31-page indexed set. Several pages labeled as planting or irrigation corresponded to utility plans.

Why it matters: This discrepancy leaves the design team or contractor with conflicting instructions. Resolve the governing requirement before relying on the affected documents.

Suggested next step: Reconcile sheet names and confirm that the intended review set is complete.

RFI draft: Reconcile sheet names and confirm that the intended review set is complete.

Water-main material designation conflicts

Civil

High

Summary: A 10-inch water-main note specifies SDR-35 pipe while the accompanying utility standard calls for AWWA C900 PVC.

Why it matters: This discrepancy leaves the design team or contractor with conflicting instructions. Resolve the governing requirement before relying on the affected documents.

Suggested next step: Confirm the pressure-pipe requirement and revise the plan or standard reference.

RFI draft: Confirm the pressure-pipe requirement and revise the plan or standard reference.

Storm pipe class differs between plan and profile

Civil

High

Summary: The same 140-foot storm-drain run is called Class III reinforced concrete pipe on one drawing and Class V on another.

Why it matters: This discrepancy leaves the design team or contractor with conflicting instructions. Resolve the governing requirement before relying on the affected documents.

Suggested next step: Confirm the required pipe class for the loading and installation conditions.

RFI draft: Confirm the required pipe class for the loading and installation conditions.

Anonymized, paraphrased excerpts from a completed project review. These three examples were marked “good catch” in the source review record; that label is feedback, not independent validation. The project total excludes duplicate-group members, dismissed findings, wrong finds, and insufficient-reference findings. Only selected excerpts are published. Customer identity, project address, source identifiers, and private drawings are omitted. Corrections, permit outcomes, and financial savings have not been independently verified. A qualified professional should assess each finding against the complete project documents.

Similar AI plan review results by project type and discipline.

Browse all case studies