Research library · Production snapshot ·
Verified 2026-10-21: 1,688 completed customer project records, 1,756 checks, and 187,774 retained potential findings. Definitions and exclusions.
These counts describe the retained review records in InspectMind’s production system. They measure review activity and potential findings; they do not establish accuracy, code compliance, or realized savings.
Deleted projects, InspectMind-owned projects, super-admin-owned projects, and projects named with a test, demo, sample, or untitled prefix are excluded.
Snapshot of retained production records, not an all-time historical ledger or an industry-wide defect or accuracy rate. Definitions differ from earlier marketing totals. Earlier website figures used broader or historical populations. This snapshot consistently links findings to completed checks and excludes rejected findings. It should not be interpreted as a growth comparison with those older totals.
664 completed checks have no positive recorded page count and contribute no pages to this total. Consequently, we present pages as a recorded minimum. Repeated checks can count the same document pages again.
A retained finding is a potential discrepancy for professional review. A “good catch” label records feedback within the product; it is not an independent accuracy assessment. Counts vary with document scope, project stage, and review settings. We do not infer an accuracy percentage or dollars saved from finding counts.
Suggested citation: InspectMind AI, “Plan Review Metrics & Methodology,” production snapshot dated 2026-10-21. Include the snapshot date and definitions when citing a count.
Download aggregate JSONThe download contains aggregate counts and definitions. It contains no customer identities or private project records.
Inside the review
Real document discrepancies, the reason they need attention, and a concrete next step for the design team.
Commercial · Anonymized review
Compare architectural assemblies, shutdown planning, and access-control sequences before procuring laboratory building systems.
Read the findingsCommercial · Anonymized review
Check that structural load criteria and building elevations agree before framing and truss design proceed.
Read the findingsEducation · Anonymized review
Compare school equipment schedules with controls specifications and the document index before coordinating MEP installation.
Read the findingsReview the evidence, check the price, then try your own set. Free check on up to 10 drawing pages, no card needed.