InspectMind AI logo InspectMind

AI Plan Review for Multifamily Residential Catch Unit & Code Issues Early

Multifamily projects have unit repetition, complex egress, and accessibility requirements. Our AI catches area calculation errors, unit mix discrepancies, and fire separation issues.

Start with $100 creditWatch 2-min demoQuestions? Chat or email
  • Unit-by-unit review
  • 24-48hr turnaround
  • 100-200 issues avg

5+ issues or full refund • Results in hours

Used on 1,600+ projects by 600+ companies

Multifamily projects are coordination-intensive

Unit repetition amplifies errors. One mistake becomes 50, 100, or 200 mistakes across the building.

  • Unit Mix Accuracy

    Verify unit types, counts, and square footages match schedules and marketing materials.

  • Accessibility Compliance

    Catch ADA, FHA, and state accessibility violations before plan check.

  • Fire Separation

    Verify corridor ratings, unit demising walls, and floor/ceiling assemblies.

  • Area Calculations

    Confirm net/gross areas, efficiency ratios, and FAR compliance.

Issues We Catch on Multifamily Projects

Based on 100+ apartment, condo, and townhome project reviews.

Unit Issues

  • Unit type mismatches
  • Square footage errors
  • Bedroom count conflicts
  • Closet size minimums

Accessibility

  • Accessible route gaps
  • Clear floor space violations
  • Grab bar mounting conflicts
  • Door maneuvering clearances

Fire/Life Safety

  • Corridor rating gaps
  • Exit travel distance exceeded
  • Fire separation continuity
  • Smoke detector coverage

Amenity Spaces

  • Parking count discrepancies
  • Amenity area errors
  • Storage unit conflicts
  • Trash room requirements

How It Works for Multifamily Projects

  1. 01

    Upload Multifamily Drawings

    Floor plans, unit types, building sections, and site plans

  2. 02

    Include Specifications

    Unit schedules, accessibility plans, and fire protection specs

  3. 03

    Get Unit-Level Report

    Issues organized by unit type, floor, and building

  4. 04

    Fix Before Repetition

    Catch errors before they multiply across all units

Ready to Check Your Multifamily Project?

Catch unit mix errors, accessibility violations, and fire separation issues before permitting.

First $100 covered for eligible work emails · 5+ issues or full refund

“InspectMind caught 47 critical issues on our cold storage project, conflicts that would have cost us millions in field rework. It paid for itself on the first review.”
Aaron BassDirector of Construction, Cold Summit Development

Explore an illustrative savings scenario

Review activity includes 1,700+ completed checks and 187,000+ potential findings retained. Savings below are modeled assumptions, not measured customer outcomes.

Your project details

$5.0M
$500K$100M
200
202,000
Projects per year
1351025
InspectMind costStandard · 200 sheets × $3
$600
One RFI, for comparison
$3,500
One field rework, for comparison
$15,000

Estimated savings

Per projectAnnual (5 projects)
Potential findings flagged~87

12 critical · 46 high · 29 medium (illustrative mix)

Critical issues caughtCode violations, structural conflicts, rework avoided
$72K
High-severity issues caughtRFIs prevented, coordination clashes resolved
$32K
Medium issues caughtDrawing gaps, specification clarifications
$4K
Total estimated savings
$109K
Modeled return on investment$600 investment, $109K modeled savings
181x

A confirmed issue that prevents downstream work can justify a review. Actual value depends on which findings require action and what the team corrects. This model does not predict or guarantee your savings.

Start with $100 credit5+ issues found or full refund
How we calculate savings

Issue count: ~43 potential findings per 100 recorded pages in completed checks with page counts. Document types and review scopes vary.

Severity split: 14% critical / 53% high / 33% medium is the illustrative mix used in this model. It is not a measured accuracy or confirmed-defect rate.

Savings model: We estimate what fraction of issues at each severity would have caused a costly downstream problem (RFI, change order, rework) if not caught during design review. The assumed escape rates are 40% for critical, 20% for high, and 10% for medium. These are modeling assumptions, not observed outcomes.

Cost per escaped issue: Critical $10K to $50K (scales with project value, rework on a $50M project costs more than on a $1M project), high $2K to $8K (RFI and delay), medium $1.5K (minor rework). These are scenario inputs, not customer-verified savings.

Learn more

Guides, articles, and case studies.

AI plan checking: the complete guide

Read the guide

See real results from real projects

View case studies

Guides, articles, and best practices

Browse resources

Document construction with daily logs and punch lists

Walk units, dictate findings, snap photos. Field Reports drafts daily logs and punch lists in your template, syncs to Procore and Smartsheet.

Security and data handling

Drawing sets are sensitive. We treat them that way, with clear commitments on training, retention, and access.

  • Your documents stay yours

    We don’t train public AI or third-party models on your documents, and you can opt out of our own model improvement anytime.

  • Deleted on request

    Request deletion of any project, any time. NDAs are available for sensitive work.

  • Segregated cloud storage

    Files live in secure cloud infrastructure with customer segregation.