InspectMind AI logo InspectMind

Inspection reports, written before you leave the site

Walk the site, take photos and talk through what you see. The InspectMind construction inspection app turns it into a finished field or site inspection report.

For iPhone and iPad. Reports open on any computer at app.inspectmind.ai.

  • Voice + photos
  • Works offline
  • LiDAR scans
  • Word · PDF
  • Share link
Voice note Offline · syncs later Word · PDF

Site visit · Today

Medical office TI

  • 1

    Level 2 corridor

    Firestopping missing at pipe penetration above ceiling.

  • 2

    Stair 1

    Handrail height measured 33 in.; confirm against detail 5/A-501.

  • 3

    Roof, area B

    Ponding near drain; membrane seams look sound.

Report readyDOCX · PDF

For engineers, inspectors and builders

Sheet 01·Site walk to report

From site walk to report in three steps

Fig. 1 · One site walk, three observations pinned where they were captured

  1. 01

    Capture on site

    Photos, video and voice notes, observation by observation.

  2. 02

    AI writes the report

    Notes and images become a structured, professional report.

  3. 03

    Review and send

    Review on the web, then share a link or export Word and PDF.

Their report, not ours

Most teams use a template built around their own report format.

Custom templates follow each firm’s own headings, tables and wording, so every site visit comes back in the format their clients already know.

What teams report on

  • 01

    Your own report format

    Custom templates built around each firm's headings, tables and wording.

  • 02

    Structural inspections & evaluations

    Observations, conclusions and a photo log from one site walk.

  • 03

    Site visits & field reports

    Construction administration visits written up before you leave.

  • 04

    Building & condition assessments

    Every finding tied to its photo and location.

  • 05

    Punch lists & closeout

    Open items tracked through to closeout.

  • Structural engineers

    Structural evaluations and inspections, with photos tied to every observation.

  • Architects

    Site visits, field reports and punch lists during construction administration.

  • Engineering firms

    Job site observations across many projects and many inspectors.

  • Building consultants

    Building and property condition assessments with photos tied to every finding.

Built for the field

Field report

Medical office TI

Site visit
  1. 1Level 2 corridorFirestopping missing at pipe penetration above ceiling.
  2. 2Stair 1Handrail height measured 33 in.; confirm against detail 5/A-501.
  3. 3Roof, area BPonding near drain; membrane seams look sound.
Word PDF Share link

Fig. 2 · The finished report, ready as Word or PDF

  • 01

    Talk or type your notes

    Speak observations on site; the app turns voice and photos into a written report.

  • 02

    Photos and video

    Capture as you walk. Media stays attached to the right observation.

  • 03

    Works offline

    Capture in basements and remote sites. Everything syncs when you're back online.

  • 04

    LiDAR room scans

    Scan rooms for as-built field reports on supported iPhone and iPad.

  • 05

    Word and PDF reports

    Download finished reports as Word or PDF documents.

  • 06

    Share with a link

    Send reports to your team and clients instantly.

What lands in your client's inbox

A structural evaluation from one site walk: project details, an executive summary, numbered observations, conclusions and a photo log. Tap a page to read it.

Sample · fictional project
  • SESAMPLE ENGINEERING GROUP
    Structural Evaluation Report · Page 1 of 3

    Structural Evaluation Report

    Condition evaluation of the parking structure, Levels 1–4

    ClientSample Property Partners
    ProjectHarbor Street Parking Structure
    OwnerSample Property Partners
    Address1200 Example Avenue, Springfield
    Date of visitOctober 14, 2026
    InspectorJ. Rivera, P.E.

    Executive summary

    Sample Engineering Group visited the Harbor Street Parking Structure on October 14, 2026 to evaluate the condition of the cast-in-place concrete decks, columns, edge barriers and expansion joints. The structure is in fair condition overall. We observed localized cracking with efflorescence, one column with spalling and exposed reinforcement, a guardrail anchor in need of repair, and a failed expansion joint seal. None of the conditions require closing the structure, but the column and guardrail items should be repaired promptly.

    People on site

    NameCompanyRole
    J. Rivera, P.E.Sample Engineering GroupInspector
    A. ChenSample Property PartnersProperty manager
    Harbor Street Parking Structure · October 14, 2026Prepared with InspectMind

    Page 1 · Cover, project details and summary

  • SESAMPLE ENGINEERING GROUP
    Structural Evaluation Report · Page 2 of 3

    Observations summary

    Observations were recorded on site with photos and voice notes and are numbered to match the photo log.

    1. 1Slab cracking, Level 2 bay C4. Diagonal crack about 6 ft long with efflorescence on the slab underside, indicating water passing through the deck.
    2. 2Column spalling, column D3. Concrete spalled at the base, exposing a corroded vertical bar with visible section loss.
    3. 3Guardrail anchor, Level 4 east. One base plate is missing an anchor nut; the post deflects when pushed by hand.
    4. 4Expansion joint, Level 3. Seal is torn and debonded across the drive aisle, with water staining on the level below.

    Observation conclusions

    • Repair column D3: remove deteriorated concrete, clean and treat bars, patch with repair mortar.
    • Reinstall the missing anchor nut at the Level 4 guardrail and check adjacent posts.
    • Rout and seal the Level 2 crack; replace the Level 3 expansion joint seal.
    • Re-evaluate the structure in 12 months, or sooner if new spalling appears.
    Harbor Street Parking Structure · October 14, 2026Prepared with InspectMind

    Page 2 · Observations and conclusions

  • SESAMPLE ENGINEERING GROUP
    Structural Evaluation Report · Page 3 of 3

    Photo log

    Photo 1. Diagonal crack with efflorescence, slab underside, Level 2, bay C4.
    Photo 2. Spalled concrete and exposed corroded rebar at column D3 base.
    Photo 3. Guardrail post base plate, missing anchor nut, Level 4 east edge.
    Photo 4. Debonded expansion joint seal across drive aisle, Level 3.
    Harbor Street Parking Structure · October 14, 2026Prepared with InspectMind

    Page 3 · Photo log

Create your first report Word and PDF export included.

Works on its own. Even better with plan review.

  • Field observations checked against the reviewed drawings
  • Fewer surprises between design and what gets built
See plan review

Fig. 3 · The observation on the phone, matched to the reviewed sheet

Inspection app questions

What is the InspectMind inspection app?+

A construction inspection app for iPhone, iPad and the web. You walk the site, take photos and talk through what you see, and it writes a finished field or inspection report.

Does the field inspection app work offline?+

Yes. Capture photos, video and voice notes in basements and remote sites without signal; everything syncs when you're back online.

Can reports follow our firm's own format?+

Yes. Most teams use a custom template built around their own report format, with their headings, tables and wording.

What file formats can I export?+

Finished site inspection reports download as Word or PDF, or you can share them with a link.

What kinds of reports do teams write with it?+

Structural inspections and evaluations, site visits and field reports, building and condition assessments, and punch lists and closeout.

Which devices does it run on?+

iPhone and iPad from the App Store, plus the web app at app.inspectmind.ai for reviewing and sharing reports from any computer. LiDAR room scans work on supported iPhone and iPad models.

Get the app

Download it on your iPhone or iPad, or sign in on the web to review and share reports from any computer.

Field-ready