Event centers and arenas have complex life safety requirements and multi-trade coordination challenges. AI catches the conflicts that delay permitting and construction.
High occupancy loads, complex MEP, and fixed opening dates create unique QA challenges.
Assembly occupancies have the most stringent life safety requirements. Every conflict can delay permitting.
AV, rigging, HVAC, electrical, fire protection—all fighting for the same ceiling space.
Events are scheduled years in advance. Construction delays affect contractual obligations.
Assembly occupancy-specific coordination issues that can delay permitting and construction.
A 15% design set for a Texas event center was reviewed with AI, finding 80+ issues before the design progressed further. The engineering team ran subsequent reviews at 30% and 50% design, catching issues while they were still document corrections rather than field change orders.
Read the full case studyBack to
Project Types
NFPA 13/20, FM Global, egress, fire ratings
Slope, reach ranges, turning radius, path of travel
AI plan checking for healthcare facilities
AI plan checking for data center construction
AI plan checking for multifamily housing
AI plan review for multifamily residential projects
Upload your event center documents. Get a prioritized list of life safety issues, MEP coordination conflicts, and code compliance gaps in days.
5+ issues or full refund · No demo required
Sample report: 282 issues found|Pricing after first check
227,181+ customer-visible issues across 2,000+ customer accounts