AI plan check for tenant improvement projects

TI projects face unique challenges: tight schedules, existing conditions, and new-to-existing coordination. AI catches the conflicts that cause delays and change orders.First $100 covered. See real results

“We're 99% interiors, usually a retrofit that involves a full gut and remodel with structural retrofit and MEP. The challenge is coordinating new work with existing building conditions that aren't always accurately documented.”
Commercial TI contractorThe TI coordination challenge

Why TI project QA matters

Tenant improvement projects have unique coordination challenges that make early QA essential.

Fast Track
Compressed schedules

TI projects often have aggressive lease dates. Delays aren't just inconvenient, they're costly rent payments.

Existing
Unknown conditions

Existing building conditions aren't always accurately reflected in base building docs. Conflicts hide until construction.

99%
Interior focus

TI work is almost entirely interior coordination. MEP, architectural, and structural all compete for the same spaces.

Issues AI catches in TI documents

TI-specific coordination issues that cause delays, change orders, and permitting problems.

New-to-existing conflicts

  • New walls vs existing MEP routing
  • Ceiling heights vs existing structure
  • Floor penetrations vs slab conditions
  • Demising wall fire rating continuity
  • Base building system connections

MEP coordination

  • HVAC modifications vs existing capacity
  • Electrical panel capacity vs new loads
  • Plumbing connections vs existing risers
  • Fire sprinkler head relocations
  • Lighting layout vs ceiling grid

Code upgrade triggers

  • Occupancy change requirements
  • ADA accessibility upgrades
  • Egress path modifications
  • Fire separation requirements
  • Energy code compliance triggers

Landlord work coordination

  • Base building vs tenant work scope
  • Demising wall responsibility
  • Core/shell MEP connections
  • Building standard compliance
  • Lease exhibit conflicts

TI project types we review

  • Office buildouts
  • Retail TI
  • Restaurant/Commercial kitchen
  • Medical/Dental TI
  • Fitness/Gym buildouts
  • Coworking spaces

How TI teams use AI review

  • Pre-bid review

    GCs run AI review on bid documents to identify issues before pricing. Understanding the real scope, including hidden coordination conflicts, enables more accurate bids and protects margins.
  • Pre-construction coordination

    After award, AI review catches new-to-existing conflicts before construction starts. RFIs get submitted early, and issues get resolved before they cause field delays.
  • Fast-track schedule support

    On fast-track projects with overlapping design and construction, AI review provides ongoing QA as new drawing sets are issued. Catch issues in each release before they impact construction already underway.

Related AI checkers

See TI review in action

See how AI caught MEP coordination issues in a commercial kitchen TI project, including temperature differential violations that would have failed inspection.

Review your TI project documents

Upload your tenant improvement drawings. Get a prioritized list of new-to-existing conflicts, MEP coordination issues, and code compliance gaps in hours.

Know the cost and the output before you upload.See pricingSee a sample report