AI Plan Check for Tenant Improvement Projects
TI projects face unique challenges: tight schedules, existing conditions, and new-to-existing coordination. AI catches the conflicts that cause delays and change orders.
The TI Coordination Challenge
"We're 99% interiors—usually a retrofit that involves a full gut and remodel with structural retrofit and MEP. The challenge is coordinating new work with existing building conditions that aren't always accurately documented."
— Commercial TI Contractor
Why TI Project QA Matters
Tenant improvement projects have unique coordination challenges that make early QA essential.
TI projects often have aggressive lease dates. Delays aren't just inconvenient—they're costly rent payments.
Existing building conditions aren't always accurately reflected in base building docs. Conflicts hide until construction.
TI work is almost entirely interior coordination. MEP, architectural, and structural all compete for the same spaces.
TI Project Types We Review
Issues AI Catches in TI Documents
TI-specific coordination issues that cause delays, change orders, and permitting problems.
New-to-Existing Conflicts
- New walls vs existing MEP routing
- Ceiling heights vs existing structure
- Floor penetrations vs slab conditions
- Demising wall fire rating continuity
- Base building system connections
MEP Coordination
- HVAC modifications vs existing capacity
- Electrical panel capacity vs new loads
- Plumbing connections vs existing risers
- Fire sprinkler head relocations
- Lighting layout vs ceiling grid
Code Upgrade Triggers
- Occupancy change requirements
- ADA accessibility upgrades
- Egress path modifications
- Fire separation requirements
- Energy code compliance triggers
Landlord Work Coordination
- Base building vs tenant work scope
- Demising wall responsibility
- Core/shell MEP connections
- Building standard compliance
- Lease exhibit conflicts
How TI Teams Use AI Review
Pre-Bid Review
GCs run AI review on bid documents to identify issues before pricing. Understanding the real scope—including hidden coordination conflicts— enables more accurate bids and protects margins.
Pre-Construction Coordination
After award, AI review catches new-to-existing conflicts before construction starts. RFIs get submitted early, and issues get resolved before they cause field delays.
Fast-Track Schedule Support
On fast-track projects with overlapping design and construction, AI review provides ongoing QA as new drawing sets are issued. Catch issues in each release before they impact construction already underway.
See TI Review in Action
See how AI caught MEP coordination issues in a commercial kitchen TI project— including temperature differential violations that would have failed inspection.
View Case StudyRelated pages
Back to
Project Types
Related
Architectural Checker
Dimension conflicts, detail references, schedules
Fire & Life Safety Checker
NFPA 13/20, FM Global, egress, fire ratings
Healthcare & Hospitals
AI plan checking for healthcare facilities
Data Centers
AI plan checking for data center construction
Multifamily Residential
AI plan checking for multifamily housing
Multifamily Residential Plan Review
AI plan review for multifamily residential projects
Review your TI project documents
Upload your tenant improvement drawings. Get a prioritized list of new-to-existing conflicts, MEP coordination issues, and code compliance gaps in days.
First free check for eligible work-email signups
Run one real project first. Future checks are pay-per-run, with volume pricing available for teams.
See sample report (282 issues found)
Not sure yet? Upload a completed project you already know. See what we catch, then recheck a revised set or run the next project.
Upload all project PDFs: drawings, specs, codes, checklists, shop drawings, submittals, contracts, zoning codes, city comments. AI checks everything against everything.
187,000+ issues caught across 500+ engineering and construction firms
One issue found pays for the whole check