Don't wait until final CDs to discover coordination issues. AI plan review works at any design stage—30% SD, 50% DD, 80% CD, or IFC. Earlier catches mean cheaper fixes and better documents at every milestone.
Major coordination and feasibility check. Are occupancy classifications correct? Do egress paths work? Is the structural system compatible? Typical: 20-60 issues.
Cross-discipline coordination, spec alignment, detail development. Do MEP layouts conflict with structure? Are materials consistent? Typical: 50-150 issues.
Full completeness check, code compliance, all cross-references, schedule coordination. Last easy chance before permitting. Typical: 100-400 issues.
Final verification. Confirm previous issues resolved, no new issues introduced by late changes. Typical: 30-80 residual issues with earlier checks.
AI plan review doesn't require complete construction documents. It reviews whatever is provided and identifies issues within the scope of what's been designed. Missing information is flagged as "not yet shown" rather than "error"—the AI understands the context of a progress set.
At 30%, the focus is on major coordination and feasibility. At 80%, it runs full code compliance and completeness checks. The depth of review scales with the completeness of the design.
Issue Count Trend
Are issues decreasing with each submission?
Resolution Rate
What % of 50% issues were resolved by 80%?
New Issues
Are new problems being introduced as design evolves?
Volume Options
Discounted per-check rates for high-volume teams
Upload your current design at any stage. AI identifies issues at the level of detail available. Results in hours.
5+ issues or full refund · No demo required
Sample report: 282 issues found|Pricing after first check
227,181+ customer-visible issues across 2,000+ customer accounts