Ohio Plan Review: 36 Issues Found
An anonymized plan review in Columbus, Ohio uncovered coordination and code issues across disciplines, before permit.
First $100 covered. Enterprise and volume pricing
- Potential findings
- 36
- Disciplines
- 5
- Codes referenced
- 4
- Critical or high examples shown
- 15
About this review
InspectMind ran an AI plan review on this project set and returned 36 potential findings across Electrical, Architectural, Plumbing, Structural, Mechanical. The selected examples below show the document conflict, why it matters, and a suggested next step.
- Disciplines
- Electrical, Architectural, Plumbing, Structural, Mechanical
- Potential findings
- 36
- Examples shown
- 15
Key findings
- Critical
Issue #43
Electrical
Issue #43
- Critical
Issue #4
Electrical
Issue #4
- High
Issue #7
Architectural
Issue #7
- High
Issue #6
Electrical
Issue #6
- High
Issue #2
Architectural
Issue #2
- High
Issue #44
Electrical
Issue #44
- High
Issue #42
Electrical · NEC
Issue #42
- High
Issue #28
Electrical
Issue #28
- High
Issue #40
Electrical
Issue #40
- High
Issue #32
Plumbing
Issue #32
Issue categories
- Electrical
- Electrical systems, panelboards, circuits, emergency power, and electrical code compliance
- Architectural
- Egress, accessibility, room layouts, building code compliance, and finish specifications
- Plumbing
- Plumbing fixtures, drainage, venting, water supply, and plumbing code compliance
- Structural
- Structural connections, load paths, foundation design, and structural code compliance
- Mechanical
- HVAC systems, ventilation, exhaust, refrigerant piping, and mechanical code compliance
Review details and suggested questions
Issue #43Electrical
Critical
Electrical
Summary: Issue #43
Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #43
Issue #4Electrical
Critical
Electrical
Summary: Issue #4
Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Residential / Commercial projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #4
Issue #7Architectural
High
Architectural
Summary: Issue #7
Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Residential / Commercial projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #7
Issue #6Electrical
High
Electrical
Summary: Issue #6
Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #6
Issue #2Architectural
High
Architectural
Summary: Issue #2
Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Residential / Commercial projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #2
Issue #44Electrical
High
Electrical
Summary: Issue #44
Why it matters: This coordination issue could lead to field conflicts and change orders in Residential / Commercial projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #44
Issue #42Electrical · NEC
High
Electrical · NEC
Summary: Issue #42
Why it matters: This issue could cause code violations and may prevent plan approval for Residential / Commercial projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #42
Issue #28Electrical
High
Electrical
Summary: Issue #28
Why it matters: This issue could cause code violations and may prevent plan approval for Residential / Commercial projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #28
Issue #40Electrical
High
Electrical
Summary: Issue #40
Why it matters: This issue could cause code violations and may prevent plan approval for Residential / Commercial projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #40
Issue #32Plumbing
High
Plumbing
Summary: Issue #32
Why it matters: This issue could cause code violations and may prevent plan approval for Residential / Commercial projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #32
Issue #19Architectural
High
Architectural
Summary: Issue #19
Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #19
Issue #26Architectural
High
Architectural
Summary: Issue #26
Why it matters: This issue could cause code violations and may prevent plan approval for Residential / Commercial projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #26
Issue #38Electrical
High
Electrical
Summary: Issue #38
Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #38
Issue #36Electrical
High
Electrical
Summary: Issue #36
Why it matters: This coordination issue could lead to field conflicts and change orders in Residential / Commercial projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #36
Issue #31Electrical
High
Electrical
Summary: Issue #31
Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #31
This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.
Related case studies
Similar AI plan review results by project type and discipline.
- MEP CommercialElectrical Equipment Plan Review: 78 Issues Found71 issues · Architectural, Civil
- MEP CommercialPlan Review: 65 Issues Found65 issues · Architectural, Civil
- MEP CommercialPlan Review: 63 Issues Found63 issues · Architectural, Civil
- MEP CommercialDrawing Set Plan Review: 61 Issues Found61 issues · Architectural, Electrical
- MEP CommercialPlan Review: 58 Issues Found58 issues · Architectural, Civil
- MEP CommercialPlan Review: 52 Issues Found52 issues · Architectural, Electrical