InspectMind AI logo InspectMind

Ohio Plan Review: 36 Issues Found

An anonymized plan review in Columbus, Ohio uncovered coordination and code issues across disciplines, before permit.

First $100 covered. Enterprise and volume pricing

Potential findings
36
Disciplines
5
Codes referenced
4
Critical or high examples shown
15

About this review

InspectMind ran an AI plan review on this project set and returned 36 potential findings across Electrical, Architectural, Plumbing, Structural, Mechanical. The selected examples below show the document conflict, why it matters, and a suggested next step.

Disciplines
Electrical, Architectural, Plumbing, Structural, Mechanical
Potential findings
36
Examples shown
15

Key findings

  1. Issue #43

    Electrical

    Critical

    Issue #43

  2. Issue #4

    Electrical

    Critical

    Issue #4

  3. Issue #7

    Architectural

    High

    Issue #7

  4. Issue #6

    Electrical

    High

    Issue #6

  5. Issue #2

    Architectural

    High

    Issue #2

  6. Issue #44

    Electrical

    High

    Issue #44

  7. Issue #42

    Electrical · NEC

    High

    Issue #42

  8. Issue #28

    Electrical

    High

    Issue #28

  9. Issue #40

    Electrical

    High

    Issue #40

  10. Issue #32

    Plumbing

    High

    Issue #32

Issue categories

Electrical
Electrical systems, panelboards, circuits, emergency power, and electrical code compliance
Architectural
Egress, accessibility, room layouts, building code compliance, and finish specifications
Plumbing
Plumbing fixtures, drainage, venting, water supply, and plumbing code compliance
Structural
Structural connections, load paths, foundation design, and structural code compliance
Mechanical
HVAC systems, ventilation, exhaust, refrigerant piping, and mechanical code compliance

Review details and suggested questions

Issue #43

Electrical

Critical

Summary: Issue #43

Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #43

Issue #4

Electrical

Critical

Summary: Issue #4

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #4

Issue #7

Architectural

High

Summary: Issue #7

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #7

Issue #6

Electrical

High

Summary: Issue #6

Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #6

Issue #2

Architectural

High

Summary: Issue #2

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #2

Issue #44

Electrical

High

Summary: Issue #44

Why it matters: This coordination issue could lead to field conflicts and change orders in Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #44

Issue #42

Electrical · NEC

High

Summary: Issue #42

Why it matters: This issue could cause code violations and may prevent plan approval for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #42

Issue #28

Electrical

High

Summary: Issue #28

Why it matters: This issue could cause code violations and may prevent plan approval for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #28

Issue #40

Electrical

High

Summary: Issue #40

Why it matters: This issue could cause code violations and may prevent plan approval for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #40

Issue #32

Plumbing

High

Summary: Issue #32

Why it matters: This issue could cause code violations and may prevent plan approval for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #32

Issue #19

Architectural

High

Summary: Issue #19

Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #19

Issue #26

Architectural

High

Summary: Issue #26

Why it matters: This issue could cause code violations and may prevent plan approval for Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #26

Issue #38

Electrical

High

Summary: Issue #38

Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #38

Issue #36

Electrical

High

Summary: Issue #36

Why it matters: This coordination issue could lead to field conflicts and change orders in Residential / Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #36

Issue #31

Electrical

High

Summary: Issue #31

Why it matters: Failure to address this issue may result in construction delays and costly rework during Residential / Commercial construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #31

This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.

Similar AI plan review results by project type and discipline.

Browse all case studies