County Health Department: 166 Issues Found
A comprehensive plan review of a county health department campus uncovered 166 issues: including drainage and landscape conflicts, seismic and fire protection errors, accessible route and parking shortfalls, and code edition conflicts, before construction.
Free check on up to 10 drawing pages. Enterprise and volume pricing
- Critical 16
- High 1
- Medium 0
Fig. 1 · Every finding, pinned on the set
- Total issues
- 166
- Critical
- 16
- High
- 1
- Medium
- 0
The project
A county health department campus with multiple buildings, site work, landscape, and playground elements. InspectMind performed a comprehensive plan review across civil, landscape, structural, fire protection, and architectural disciplines, identifying drainage and detail conflicts, seismic and fire protection errors, insufficient exits and accessible parking, sprinkler type conflicts, and building code edition inconsistencies before construction.
- Project type
- Public facility · Campus · United States
Codes referenced: International Building Code · North Carolina Building Code · NFPA 13 · IBC 1106.2 · IBC 1613.2.3 · OSHA
Critical findings (16)
- 1Critical
Conflicting Drainage Detail at Precast Seat Wall Interface
Landscape
Sheet L-502 Detail D4 shows a linear drain (J-Drain MVP 6") at the precast seat wall interface. Sheet L-504 Detail E1 shows a flush condition at the same interface with no drain. The two details conflict.
- 2Critical
Construction Type IV Checked but Fire Protection Table Shows 0-Hour Ratings
Architectural
The drawing checks both Type IV and Type II-B under 'Basic Building Data.' The Fire Protection Requirements table shows 0-hour ratings for Primary Structural Frame, which is inconsistent with Type IV requirements in Table 601.
- 3Critical
Missing ASTM Specification for Miscellaneous Steel Shapes
Structural
The structural steel notes specify miscellaneous shapes (S, M, C, MC, L) at 50 KSI yield but do not identify the required ASTM standard. Other materials on the project list ASTM designations.
- 4Critical
Incorrect Seismic Design Category Determination
Structural
The drawing indicates Seismic Design Category (SDC) B. The provided seismic parameters (S_D1 = 0.136g with Risk Category III) correspond to SDC C per IBC Table 1613.2.3(2).
- 5Critical
Insufficient Foundation Depth for Mound Structure and Play Equipment
Structural
Detail D1 shows the 'Synthetic Turf Mound' and embedded 'Concrete Footing' for the Hill Climber Rope. The detail does not show the foundation extending below undisturbed ground (minimum 12" per IBC 1809.4).
- 6Critical
Unprotected Opening in Fire Separation Wall
Fire Protection
The plan depicts a wall separating 'BUILDING AREA A' and 'BUILDING AREA B' along an 'IMAGINARY PROPERTY LINE,' indicating separate buildings or fire areas. An opening in this wall is shown without fire-rated protection.
Checkers used
Sample high priority findings (1 in sample)
- 1High
Conflict in Column Identification Method
Structural
The S-101A Legend defines 'C1' as the Column Mark for the Column Schedule. The Structural Column Schedule on S-201 identifies columns only by Grid Location, not by C1-style marks.
Issue categories
- Cat. 01Civil
- Civil, site, and drainage issues found during plan review
- Cat. 02Landscape
- Landscape, playground, and accessible route issues found during plan review
- Cat. 03Structural
- Structural and foundation issues found during plan review
- Cat. 04Fire Protection
- Fire protection and life safety issues found during plan review
- Cat. 05Architectural
- Architectural and fire-rated assembly issues found during plan review
- Cat. 06Code Compliance
- Building code edition and compliance issues found during plan review
Value delivered
- 166 issues surfaced before construction
- Drainage, landscape, and accessible route gaps caught
- Seismic category, fire protection, and egress issues identified
- Code edition conflicts resolved for permit
“The mix of civil, landscape, structural, and fire protection issues would have stretched across multiple plan review cycles. Getting 166 issues in one pass saved us months.”
This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.
Related case studies
Similar AI plan review results by project type and discipline.
- CommercialSupercenter with Fuel Station, Pennsylvania: 180 Issues Flagged180issues · Civil, Fire Protection
- IndustrialManufacturing Plant Site Work, Indiana: 153 Issues Flagged153issues · Civil, Plumbing
- CivilPlan Review: 184 Issues Found184issues · Architectural, Civil
- CivilPlan Review: 174 Issues Found174issues · Architectural, Civil
- CivilEducational Flex Shop: 170 Issues Found170issues · Architectural, Structural
- CivilPlan Review: 131 Issues Found131issues · Architectural, Civil