Back to Case Studies
EducationalGroup EUnited States

Educational Flex Shop: 170 Issues Found

A comprehensive plan review of an educational flex shop and vocational facility uncovered 170 issues—including wall type vs elevation conflicts, missing fire protection, blocked masonry drainage, accessibility errors, and civil/site coordination—before construction.

170
Total Issues
14
Critical
1
High
0
Medium

The Project

An educational flex shop and vocational facility. InspectMind performed a comprehensive plan review across architectural, structural, fire protection, and civil disciplines, identifying wall type vs elevation conflicts, missing fire extinguishers and corridor ratings, blocked masonry cavity drainage, safety glazing and grab bar errors, and site accessible route and sediment control issues before construction.

International Building CodeIBC 906.1IBC 1020.2IBC 1502.2IBC 1104.1IBC 3307.1

Critical Findings (14)

CriticalConflict Between Wall Type P8 Definition and Interior Elevation

The Enlarged Floor Plan assigns Wall Type 'P8' to the partition between Flex Shop 130A and Storage 130C. P8 is defined as composite metal stud/gypsum. The interior elevation shows glazing/storefront in the upper portion.

CriticalMissing Portable Fire Extinguishers in Group E/F-1 Occupancy

The drawing depicts "FLEX SHOP" areas (Rooms 130, 130A) classified as Group E or F-1. IBC 906.1 mandates portable fire extinguishers in such occupancies. No locations or mounting details are shown.

CriticalCorridor Fire-Resistance Rating Indication Missing

The First Floor Plan shows multiple classrooms (Group E). IBC 1020.2 requires corridors to be fire-resistance-rated in educational occupancies. Corridor C200 has no rating symbol or partition tag.

CriticalMissing Safety Glazing Specification at Hazardous Location

A wall section shows full-height "ALUM STOREFRONT W/ 1" INSUL GLASS" in a CLASSROOM with the bottom edge of the glazing less than 18 inches above the floor. IBC requires safety glazing in such hazardous locations.

CriticalBlocked Drainage in Masonry Cavity Wall

Detail 2/A-501 instructs "GROUT CAVITY SOLID FROM FINISH FLOOR TO FOOTING" at the base of the brick veneer wall. The drainage components (weeps at 24" OC and flashing) are shown above the grouted zone, but grouting blocks the cavity and prevents drainage to the weeps.

CriticalMajor Coordination Conflict: South Wall Design and Means of Egress

The Enlarged Floor Plan shows the South wall of Mechatronics Shop 132 with offices. The Interior Elevation for the same wall shows exterior exit doors. Plan and elevation contradict each other.

Sample High Priority Findings (1 in sample)

HighRoof Datum Elevations Conflict Between North Elevation and Section 2

The North Elevation shows UPPER ROOF at 26'-0" and LOWER ROOF at 16'-0" and references Section 2/A-302. Section 2 on A-302 shows different elevations for the same roofs in the same area.

Issue Categories

Architectural

Architectural, envelope, and accessibility issues found during plan review

Structural

Structural and PEMB design intent issues found during plan review

Fire Protection

Fire protection and life safety issues found during plan review

Civil

Civil, site access, and sediment control issues found during plan review

Value Delivered

170 issues surfaced before construction
Fire protection and corridor rating gaps caught
Masonry drainage and envelope coordination fixed
Accessibility and civil/site issues identified

"The wall type vs elevation conflict in the flex shop would have been a major RFI in the field. Finding 170 issues before we broke ground kept our schedule and budget on track."

— Project Team, Educational Facility

Want This Level of Detail on Your Next Project?

Get comprehensive AI plan review with prioritized issues and code references.

5+ issues or full refund
Results in hours
Demo optional

One issue found pays for the whole check