Educational Flex Shop: 170 Issues Found

A comprehensive plan review of an educational flex shop and vocational facility uncovered 170 issues: including wall type vs elevation conflicts, missing fire protection, blocked masonry drainage, accessibility errors, and civil/site coordination, before construction.

First $100 covered. Enterprise and volume pricing

Total issues
170
Critical
14
High
1
Medium
0

The project

An educational flex shop and vocational facility. InspectMind performed a comprehensive plan review across architectural, structural, fire protection, and civil disciplines, identifying wall type vs elevation conflicts, missing fire extinguishers and corridor ratings, blocked masonry cavity drainage, safety glazing and grab bar errors, and site accessible route and sediment control issues before construction.

Project type
Educational · Group E · United States

Codes referenced: International Building Code · IBC 906.1 · IBC 1020.2 · IBC 1502.2 · IBC 1104.1 · IBC 3307.1

Critical findings (14)

  1. Conflict Between Wall Type P8 Definition and Interior Elevation

    Architectural

    Critical

    The Enlarged Floor Plan assigns Wall Type 'P8' to the partition between Flex Shop 130A and Storage 130C. P8 is defined as composite metal stud/gypsum. The interior elevation shows glazing/storefront in the upper portion.

  2. Missing Portable Fire Extinguishers in Group E/F-1 Occupancy

    Fire Protection

    Critical

    The drawing depicts "FLEX SHOP" areas (Rooms 130, 130A) classified as Group E or F-1. IBC 906.1 mandates portable fire extinguishers in such occupancies. No locations or mounting details are shown.

  3. Corridor Fire-Resistance Rating Indication Missing

    Fire Protection

    Critical

    The First Floor Plan shows multiple classrooms (Group E). IBC 1020.2 requires corridors to be fire-resistance-rated in educational occupancies. Corridor C200 has no rating symbol or partition tag.

  4. Missing Safety Glazing Specification at Hazardous Location

    Architectural

    Critical

    A wall section shows full-height "ALUM STOREFRONT W/ 1" INSUL GLASS" in a CLASSROOM with the bottom edge of the glazing less than 18 inches above the floor. IBC requires safety glazing in such hazardous locations.

  5. Blocked Drainage in Masonry Cavity Wall

    Architectural

    Critical

    Detail 2/A-501 instructs "GROUT CAVITY SOLID FROM FINISH FLOOR TO FOOTING" at the base of the brick veneer wall. The drainage components (weeps at 24" OC and flashing) are shown above the grouted zone, but grouting blocks the cavity and prevents drainage to the weeps.

  6. Major Coordination Conflict: South Wall Design and Means of Egress

    Fire Protection

    Critical

    The Enlarged Floor Plan shows the South wall of Mechatronics Shop 132 with offices. The Interior Elevation for the same wall shows exterior exit doors. Plan and elevation contradict each other.

Sample high priority findings (1 in sample)

  1. Roof Datum Elevations Conflict Between North Elevation and Section 2

    Architectural

    High

    The North Elevation shows UPPER ROOF at 26'-0" and LOWER ROOF at 16'-0" and references Section 2/A-302. Section 2 on A-302 shows different elevations for the same roofs in the same area.

Issue categories

Architectural
Architectural, envelope, and accessibility issues found during plan review
Structural
Structural and PEMB design intent issues found during plan review
Fire Protection
Fire protection and life safety issues found during plan review
Civil
Civil, site access, and sediment control issues found during plan review

Value delivered

  • 170 issues surfaced before construction
  • Fire protection and corridor rating gaps caught
  • Masonry drainage and envelope coordination fixed
  • Accessibility and civil/site issues identified
“The wall type vs elevation conflict in the flex shop would have been a major RFI in the field. Finding 170 issues before we broke ground kept our schedule and budget on track.”
Project Team, Educational Facility

This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.

All case studiesExample reports

Similar AI plan review results by project type and discipline.

Browse all case studies