Educational Flex Shop: 170 Issues Found
A comprehensive plan review of an educational flex shop and vocational facility uncovered 170 issues: including wall type vs elevation conflicts, missing fire protection, blocked masonry drainage, accessibility errors, and civil/site coordination, before construction.
First $100 covered. Enterprise and volume pricing
- Total issues
- 170
- Critical
- 14
- High
- 1
- Medium
- 0
The project
An educational flex shop and vocational facility. InspectMind performed a comprehensive plan review across architectural, structural, fire protection, and civil disciplines, identifying wall type vs elevation conflicts, missing fire extinguishers and corridor ratings, blocked masonry cavity drainage, safety glazing and grab bar errors, and site accessible route and sediment control issues before construction.
- Project type
- Educational · Group E · United States
Codes referenced: International Building Code · IBC 906.1 · IBC 1020.2 · IBC 1502.2 · IBC 1104.1 · IBC 3307.1
Critical findings (14)
- Critical
Conflict Between Wall Type P8 Definition and Interior Elevation
Architectural
The Enlarged Floor Plan assigns Wall Type 'P8' to the partition between Flex Shop 130A and Storage 130C. P8 is defined as composite metal stud/gypsum. The interior elevation shows glazing/storefront in the upper portion.
- Critical
Missing Portable Fire Extinguishers in Group E/F-1 Occupancy
Fire Protection
The drawing depicts "FLEX SHOP" areas (Rooms 130, 130A) classified as Group E or F-1. IBC 906.1 mandates portable fire extinguishers in such occupancies. No locations or mounting details are shown.
- Critical
Corridor Fire-Resistance Rating Indication Missing
Fire Protection
The First Floor Plan shows multiple classrooms (Group E). IBC 1020.2 requires corridors to be fire-resistance-rated in educational occupancies. Corridor C200 has no rating symbol or partition tag.
- Critical
Missing Safety Glazing Specification at Hazardous Location
Architectural
A wall section shows full-height "ALUM STOREFRONT W/ 1" INSUL GLASS" in a CLASSROOM with the bottom edge of the glazing less than 18 inches above the floor. IBC requires safety glazing in such hazardous locations.
- Critical
Blocked Drainage in Masonry Cavity Wall
Architectural
Detail 2/A-501 instructs "GROUT CAVITY SOLID FROM FINISH FLOOR TO FOOTING" at the base of the brick veneer wall. The drainage components (weeps at 24" OC and flashing) are shown above the grouted zone, but grouting blocks the cavity and prevents drainage to the weeps.
- Critical
Major Coordination Conflict: South Wall Design and Means of Egress
Fire Protection
The Enlarged Floor Plan shows the South wall of Mechatronics Shop 132 with offices. The Interior Elevation for the same wall shows exterior exit doors. Plan and elevation contradict each other.
Sample high priority findings (1 in sample)
- High
Roof Datum Elevations Conflict Between North Elevation and Section 2
Architectural
The North Elevation shows UPPER ROOF at 26'-0" and LOWER ROOF at 16'-0" and references Section 2/A-302. Section 2 on A-302 shows different elevations for the same roofs in the same area.
Issue categories
- Architectural
- Architectural, envelope, and accessibility issues found during plan review
- Structural
- Structural and PEMB design intent issues found during plan review
- Fire Protection
- Fire protection and life safety issues found during plan review
- Civil
- Civil, site access, and sediment control issues found during plan review
Value delivered
- 170 issues surfaced before construction
- Fire protection and corridor rating gaps caught
- Masonry drainage and envelope coordination fixed
- Accessibility and civil/site issues identified
“The wall type vs elevation conflict in the flex shop would have been a major RFI in the field. Finding 170 issues before we broke ground kept our schedule and budget on track.”
This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.
Related case studies
Similar AI plan review results by project type and discipline.
- CivilCounty Health Department: 166 Issues Found166 issues · Civil, Landscape
- CivilHistoric Clubhouse Renovation: 339 Issues Found339 issues · Architectural, Structural
- MEP CommercialTechnology Center: 201 Issues Found201 issues · Electrical, Structural
- MultifamilyMultifamily Residential: 167 Issues Including Critical Mechanical, Fire Protection & Coordination Violations167 issues · Fire Protection, Structural
- MEP CommercialMixed-Use Renovation: 140 Issues Found in Pre-Permit Review140 issues · Architectural, Structural
- CommercialCommercial Kitchen & Multi-Discipline Plan Review: 284 Issues Found284 issues · Architectural, Civil