InspectMind AI logo InspectMind
Back to Case Studies
MultifamilyMid-RiseMarket-Rate

203 Issues Found in 180-Unit Multifamily Project

Fire separation conflicts, ADA accessibility violations, and MEP routing clashes identified across a 5-story podium apartment building—before permits.

203
Issues Found
180
Units
5
Stories

Key Finding: Fire Separation at Podium-Tower Interface

2-hour fire-rated assembly between parking podium and residential tower shown discontinuous at MEP shaft penetrations—IBC 711 violation that would have failed inspection.

The Project

A 5-story Type IIIA podium-style apartment building with 180 market-rate units over 2 levels of parking. The project featured a mix of studio, 1-bedroom, and 2-bedroom units with amenity spaces including a rooftop deck, fitness center, and leasing office.

InspectMind's AI review cross-checked architectural, structural, MEP, and civil drawings—identifying fire separation gaps, accessibility conflicts, unit mix inconsistencies, and mechanical coordination issues before permit submission.

2021 IBCFair HousingNFPA 13

Sample Findings

Fire/Life SafetyFire Separation Issues

CriticalPodium Fire Separation Discontinuity

2-hour horizontal assembly between parking and residential missing fire dampers at 4 HVAC penetrations. IBC 711.4 requires continuity at all penetrations.

CriticalCorridor Rating Conflict

Common corridor shown as 1-hour rated on A3.1 but 0-hour on life safety plans. R-2 occupancy requires minimum 1-hour corridor per IBC Table 1020.1.

HighStair Pressurization Conflict

Mechanical schedule shows 2,500 CFM stair pressurization fan while specifications require 3,000 CFM minimum for building height. IBC 909.20.5 compliance at risk.

AccessibilityADA & Fair Housing Issues

CriticalAccessible Unit Count Mismatch

Unit schedule shows 5 Type A accessible units but architectural plans only detail 3 with required clearances. Fair Housing requires 5% Type A units in elevator buildings.

HighBathroom Clearance Violation

Type A accessible bathroom shows 56" clear floor space at toilet—Fair Housing Design Manual requires 60" minimum turning radius for wheelchair access.

MEPMEP Coordination Issues

HighHVAC-Structural Clash at Corridors

24" corridor supply duct shown at 8'-0" AFF conflicts with 14" structural beam at grid C—only 7'-2" clear ceiling height would result.

HighElectrical Room Undersized

Main electrical room shown as 120 SF but panel schedule totals require 180 SF minimum per NEC working clearance requirements.

CoordinationUnit & Schedule Conflicts

HighUnit Mix Discrepancy

Marketing floor plans show 45 two-bedroom units but architectural unit schedule totals 38. Parking ratio calculations based on incorrect unit count.

MediumAppliance Schedule Conflict

Kitchen plans show 30" range but appliance schedule specifies 36" commercial-style ranges—cabinet layout doesn't accommodate larger units.

Issue Categories

Fire & Life Safety

Fire separations, corridor ratings, sprinkler coverage, smoke control

Accessibility

ADA compliance, Fair Housing requirements, accessible routes

MEP Coordination

Duct routing, electrical clearances, plumbing risers

Unit Design

Unit mix, appliance schedules, fixture counts

Parking & Site

Parking counts, accessible spaces, drive aisle widths

Amenity Spaces

Rooftop requirements, fitness room egress, leasing office ADA

Why These Issues Matter

Fair Housing Liability

Accessibility violations in multifamily create ongoing legal liability. Fair Housing complaints can result in costly retrofits and settlements years after completion.

Permit Rejection Risk

Fire separation discontinuities and corridor rating conflicts are red flags for plan reviewers. Each rejection cycle adds weeks to project schedules.

203 issues surfaced before permit submission
Fair Housing compliance gaps identified early
Fire separation details verified across sheets
Unit mix reconciled with parking calculations

"The Fair Housing accessibility findings alone were worth the review. We've seen projects get sued years after completion for exactly these issues. Catching them before permit submission saved us from potential seven-figure liability."

— Development Manager, Multifamily Developer

First $100 covered

Reviewing a Multifamily Project?

Catch fire separation gaps, accessibility violations, and coordination issues before they become costly problems.

  • 5+ issues or full refund
  • Results in hours
  • No demo required

5+ issues or full refund · No demo required

Sample report: 282 issues found|Pricing after first check

227,181+ customer-visible issues across 2,000+ customer accounts