Never Miss a Unit or Area Calculation Error
AI catches unit count discrepancies, area calculation errors, and fire compartment issues before they become six-figure change orders.
5+ issues or full refund • Results in hours
Trusted by 500+ companies including
Architects · Engineers · GCs · Developers · Owner's Reps · Plan Checkers · Insurance
The Errors That Cost Multifamily Developers Most
Excel formulas, area calculations, and unit counts—the small errors that become big problems.
Unit Mix Discrepancies
We had a project where we were short 3 units the owner thought they were getting. That's a lot of money.
Area Calculation Errors
One project used multiplier of 4 per floor but 5 for total—AI caught it. "That would have been monumental."
Fire Compartment Issues
Fire compartment areas affect egress, sprinkler design, and code compliance. Errors compound fast.
Repeat Project Learning
We'll check your new projects against RFIs from similar past projects—never make the same mistake twice.
What AI Catches in Multifamily Sets
The tedious cross-checking that slips through when you're under deadline.
Unit Count & Mix
- Unit schedule vs floor plan counts
- Unit type distribution
- Revit smart table discrepancies
- Building summary inconsistencies
Area Calculations
- Building area increase formulas
- Fire compartment calculations
- Gross vs net area conflicts
- Allowable area per construction type
Accessibility
- FHA DM vs ANSI A117.1 (state-specific)
- Accessible unit counts
- Type A vs Type B unit distribution
- Common area accessibility
Code & Fire
- IBC height/area tables
- Construction type classifications
- Fire separation ratings
- Egress calculations
How It Works for Multifamily
Upload Full Set
Architectural, structural, MEP—we check across all disciplines
Add Past RFIs (Optional)
Export RFIs from similar projects—we'll check against those issues
Review Prioritized Findings
Critical unit count and area issues surfaced first
Export to ACC
CSV export formatted for Autodesk Construction Cloud bulk import
"All the MEP stuff seemed really spot-on. Cross-referencing DFUs with code requirements, the condensate line sizing—that's exactly the kind of checking we need. The area calculation error it caught would have been monumental. One issue like that pays for the entire review."
Construction Manager
Florida Multifamily Developer
See what one check saves you
Based on real data from 2,800+ projects and 58,000+ issues found.
Your project details
InspectMind cost
Up to 250 sheets · flat
InspectMind
$250
One RFI
$3,500
One rework
$15,000
Estimated savings
~140
Critical issues caught
Code violations, structural conflicts, rework avoided
High-severity issues caught
RFIs prevented, coordination clashes resolved
Medium issues caught
Drawing gaps, specification clarifications
$250 investment → $179K saved
715x
One critical issue caught pays for 60 checks. Even the most skeptical estimate shows massive ROI — because catching problems in design costs 10–100x less than fixing them in the field.
5+ issues found or full refund guaranteed
How we calculate savings
Issue count: ~70 issues per 100 drawing sheets — our real average across 2,800+ completed projects.
Severity split: 14% Critical / 53% High / 33% Medium — from 58,000+ real issues exported from our production database.
Savings model: We estimate what fraction of issues at each severity would have caused a costly downstream problem (RFI, change order, rework) if not caught during design review. We use conservative "escape rates" — 40% for Critical, 20% for High, 10% for Medium — well below industry rework benchmarks (CII: 5–10% of project value).
Cost per escaped issue: Critical $10K–$50K (scales with project value — rework on a $50M project costs more than on a $1M project), High $2K–$8K (RFI + delay), Medium $1.5K (minor rework). Based on CII, FMI, and Navigant construction industry research.
Multifamily Case Studies
See real issues caught in multifamily projects like yours.
Student Housing: 1,497 Issues Found
Multi-Building Wood Frame
Placeholder text in Simpson hanger specs caught before procurement
Read case studyMarket-Rate Apartments: 203 Issues
180-Unit Podium Building
Fire separation gap at podium-tower interface identified
Read case studyAffordable Housing: 147 Issues
96-Unit LIHTC Project
UFAS accessible unit count shortage caught before investor review
Read case studyLearn More
Explore guides, articles, and case studies
Document construction with daily logs and punch lists
Field Reports captures site conditions, deliveries, crews, and punch items in a clean DOCX. Pushes to Procore, Smartsheet, or PDF — same format every day.
Ready to Check Your Next Multifamily Set?
Catch unit mix errors, area calculation issues, and fire compartment problems before construction.