An anonymized plan review in Nevada uncovered 68 coordination and code issues across civil, plumbing, structural, architectural, mechanical, and fire protection, before permit.

First $100 covered. Enterprise and volume pricing

Potential findings
68
Disciplines
6
Codes referenced
4
Critical or high examples shown
8

About this review

InspectMind ran an AI plan review on this project set and returned 68 potential findings across Civil, Plumbing, Structural, Architectural, Mechanical, Fire Protection. The selected examples below show the document conflict, why it matters, and a suggested next step.

Disciplines
Civil, Plumbing, Structural, Architectural, Mechanical, Fire Protection
Potential findings
68
Examples shown
15

Key findings

  1. Issue #12

    Civil

    Critical

    Issue #12

  2. Issue #45

    Plumbing

    Critical

    Issue #45

  3. Issue #8

    Structural

    Critical

    Issue #8

  4. Issue #33

    Civil

    High

    Issue #33

  5. Issue #21

    Architectural

    High

    Issue #21

  6. Issue #56

    Fire Protection

    High

    Issue #56

  7. Issue #19

    Mechanical

    High

    Issue #19

  8. Issue #4

    Plumbing

    High

    Issue #4

  9. Issue #61

    Civil

    Medium

    Issue #61

  10. Issue #28

    Structural

    Medium

    Issue #28

Issue categories

Civil
Site grading, drainage, utilities, and civil coordination
Plumbing
Plumbing fixtures, drainage, and utility coordination
Structural
Structural connections, foundations, and load paths
Architectural
Building layout, egress, and enclosure
Mechanical
HVAC and mechanical systems coordination
Fire Protection
Fire protection and life safety systems

Review details and suggested questions

Issue #12

Civil

Critical

Summary: Issue #12

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #45

Plumbing

Critical

Summary: Issue #45

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #8

Structural

Critical

Summary: Issue #8

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #33

Civil

High

Summary: Issue #33

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #21

Architectural

High

Summary: Issue #21

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #56

Fire Protection

High

Summary: Issue #56

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #19

Mechanical

High

Summary: Issue #19

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #4

Plumbing

High

Summary: Issue #4

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #61

Civil

Medium

Summary: Issue #61

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #28

Structural

Medium

Summary: Issue #28

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #15

Architectural

Medium

Summary: Issue #15

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #52

Civil

Medium

Summary: Issue #52

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #7

Plumbing

Medium

Summary: Issue #7

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #40

Civil

Low

Summary: Issue #40

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Issue #67

Architectural

Low

Summary: Issue #67

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.

Similar AI plan review results by project type and discipline.

Browse all case studies