105Potential findings
Flagged
  1. 1High · Civil / Architectural / Electrical / Plumbing / MechanicalFlood zone substantial improvement is not documented
  2. 2High · Structural / ArchitecturalChange to factory occupancy raises floor loads with no structural evaluation
  3. 3High · Structural / Architectural / Fire ProtectionNew 3-hour CMU fire barrier lacks seismic reinforcing and head details

Fig. 1 · Top findings, pinned on the set

Potential findings
105
Disciplines
7
Published examples
3
Critical or high examples shown
3

Checkers used on this project

Run the same check on your set →
Sheet 01·Case file

About this review

InspectMind ran an AI plan review on this industrial set and returned 105 potential findings across Architectural, Structural, Civil, Mechanical, Electrical, Plumbing, Fire Protection. The selected examples below show the document conflict, why it matters, and a suggested next step.

Project type
Industrial
Disciplines
Architectural, Structural, Civil, Mechanical, Electrical, Plumbing, Fire Protection
Potential findings
105
Published examples
3
Published
2026-11-09
Evidence status
Selected from open findings in the source review record

What this review documents

Check flood zone rules, change of occupancy loads, and new fire barriers in an existing building converted to manufacturing.

The documented result is a set of review findings. This case study does not establish that corrections were completed or that savings were realized. The examples below were marked useful in the source review record; they have been paraphrased to remove identifying details.

Key findings

  1. 1

    Flood zone substantial improvement is not documented

    Civil / Architectural / Electrical / Plumbing / Mechanical · IEBC; ASCE 24

    High

    The cover sheet identifies an AE flood zone, a Level 3 alteration, and a partial change of occupancy, and notes existing equipment below the flood elevation, but the set has no substantial improvement determination or equipment elevation plan.

    Next step: Provide the substantial improvement evaluation and show equipment and utility elevations relative to the design flood elevation.

  2. 2

    Change to factory occupancy raises floor loads with no structural evaluation

    Structural / Architectural · IEBC Chapter 10

    High

    Part of the building changes from business to factory use over an existing raised slab above a crawlspace, but no structural evaluation of the higher live load is provided.

    Next step: Provide a structural evaluation of the raised slab for the factory live load.

  3. 3

    New 3-hour CMU fire barrier lacks seismic reinforcing and head details

    Structural / Architectural / Fire Protection · UL U904

    High

    A new 3-hour CMU fire barrier between the business and factory areas shows only joint reinforcing, with the block type left to the listing, in a Seismic Design Category D building. The wall runs to the deck, but no top-of-wall or fire joint detail is shown.

    Next step: Add seismic reinforcing, a top-of-wall connection, and a rated head-of-wall joint detail.

Issue categories

Cat. 01Civil / Architectural / Electrical / Plumbing / Mechanical
Civil / Architectural / Electrical / Plumbing / Mechanical findings in the selected review excerpts.
Cat. 02Structural / Architectural
Structural / Architectural findings in the selected review excerpts.
Cat. 03Structural / Architectural / Fire Protection
Structural / Architectural / Fire Protection findings in the selected review excerpts.

Review details and suggested questions

01
Flood zone substantial improvement is not documented

Civil / Architectural / Electrical / Plumbing / Mechanical · IEBC; ASCE 24

High

Summary: The cover sheet identifies an AE flood zone, a Level 3 alteration, and a partial change of occupancy, and notes existing equipment below the flood elevation, but the set has no substantial improvement determination or equipment elevation plan.

Why it matters: A substantial improvement can trigger full flood compliance for the building, which changes scope and cost.

Suggested next step: Provide the substantial improvement evaluation and show equipment and utility elevations relative to the design flood elevation.

RFI draft: Provide the substantial improvement evaluation and show equipment and utility elevations relative to the design flood elevation.

02
Change to factory occupancy raises floor loads with no structural evaluation

Structural / Architectural · IEBC Chapter 10

High

Summary: Part of the building changes from business to factory use over an existing raised slab above a crawlspace, but no structural evaluation of the higher live load is provided.

Why it matters: Manufacturing loads can exceed what an office floor was designed for.

Suggested next step: Provide a structural evaluation of the raised slab for the factory live load.

RFI draft: Provide a structural evaluation of the raised slab for the factory live load.

03
New 3-hour CMU fire barrier lacks seismic reinforcing and head details

Structural / Architectural / Fire Protection · UL U904

High

Summary: A new 3-hour CMU fire barrier between the business and factory areas shows only joint reinforcing, with the block type left to the listing, in a Seismic Design Category D building. The wall runs to the deck, but no top-of-wall or fire joint detail is shown.

Why it matters: Unreinforced masonry and an undetailed head joint can fail both the seismic and the fire rating requirements.

Suggested next step: Add seismic reinforcing, a top-of-wall connection, and a rated head-of-wall joint detail.

RFI draft: Add seismic reinforcing, a top-of-wall connection, and a rated head-of-wall joint detail.

Anonymized, paraphrased excerpts from a completed project review. These three examples were selected editorially from findings the source review record kept open (not dismissed or marked wrong); that selection is not independent validation. The project total excludes duplicate-group members, dismissed findings, wrong finds, and insufficient-reference findings. Only selected excerpts are published. Customer identity, project address, source identifiers, and private drawings are omitted. Corrections, permit outcomes, and financial savings have not been independently verified. A qualified professional should assess each finding against the complete project documents.