Religious FacilityAssembly (A-3)Multi-Discipline

364 Issues Found in New Church Construction Documents

Undersized septic systems, Title 24 non-compliance, accessibility violations, egress deficiencies, and hundreds of cross-document contradictions—all caught before permit submission.

364
Issues Found
35
Critical
160
High Priority
8
Disciplines

35 critical issues including undersized septic tank (30% below code requirements), Title 24 mandatory measures failure, and egress capacity violations for 633-person occupancy— any one of which would have caused permit rejection.

The Project

A new ~11,000 SF religious facility with Assembly Group A-3 occupancy, designed for up to 633 occupants. The project included a sanctuary, social hall, classrooms, kitchen, and support spaces—with on-site septic and well systems. InspectMind reviewed architectural, structural, mechanical, electrical, plumbing, civil, and fire protection drawings against the full specification package.

2022 CBCCalifornia Title 24CPC / UPCADA / CBC 11BNEC / CEC

Critical Findings

CriticalSeptic Tank 30-35% Undersized

2,000 gallon tank specified when calculations show 2,840-3,088 gallons required per CPC Appendix H. Would cause permit rejection and potential system failure.

CriticalTitle 24 Mandatory Measures Non-Compliance

Certificate of Compliance explicitly states "DOES NOT COMPLY" for mandatory measures—a direct contradiction to project specification requirements for code compliance.

CriticalGas Connection Shown with No Gas Service

Project Directory shows Gas utility as "N/A", yet plumbing details show gas inlet and piping for water heater. Fundamental conflict about utility availability.

CriticalEgress Capacity Conflict (633 Occupants vs. 2 Exits)

Code compliance block states 2 exits for occupancy under 500, but specifications show 633 occupants requiring 3 exits. Life safety violation.

CriticalPlan vs. Elevation Major Discrepancies

Men's restroom floor plan shows 4 toilet stalls and 3 lavatories, but elevations show different fixtures entirely—fundamental coordination failure between views.

CriticalSite Data Contradictions Across Sheets

Different addresses (2700 vs 7200 Central Ave), APNs (034 vs 035), lot areas (5.07 vs 2.68 AC), and building areas (11,000 vs 10,795 SF) between cover sheet and site analysis.

CriticalCircuit Overload on Panel A

Circuit 17 shows 2.46 kW load (20.5 amps at 120V) on a 20-amp breaker—NEC overcurrent protection violation.

CriticalRTU Capacity Input Error (1000x)

Equipment schedule shows 23,800 and 47,000 under "kBtu/h" columns—implying millions of BTU/h for small commercial AC units. Values likely entered in Btu/h instead of kBtu/h.

Additional High-Priority Findings

HighAccessibility Door Force Violation

Drawing permits 8.5 lbs exterior door force; specification requires maximum 5 lbs—70% over limit.

HighLavatory Toe Clearance Contradiction

Drawing shows 6" maximum toe clearance; specification requires 17" minimum—values are inverted.

HighBuilding Sewer Slope Below Code

Detail specifies 0.25-0.5% slope; UPC requires minimum ~2% for building sewers.

HighConditioned Floor Area Exceeds Building Area

Title 24 shows 11,100 SF conditioned; architectural shows 10,795 SF total building—mathematical impossibility.

HighAccessible Parking Length Undersized

Van accessible stall shows 16'-0"; specification requires 18'-0" minimum—2 feet short.

HighHVAC Equipment Misclassified as Residential

Title 24 form classifies exhaust fans as serving "Dwelling Units" in an A-3 church occupancy—triggers incorrect ventilation standards.

HighAluminum Wiring Contradiction

Drawing notes allow aluminum conductors; specifications explicitly prohibit aluminum wiring.

HighStructural Lumber Grade Conflict

Beam schedule specifies Douglas Fir #2 for 6x members; specification requires #1 grade for beams 6x and greater.

Issue Categories

Plumbing & Septic

Undersized septic tank, slope violations, trap requirements, conflicting pipe sizes

Mechanical & Title 24

Non-compliance certificates, equipment misclassification, capacity errors

Electrical

Circuit overloads, panel schedule conflicts, code version contradictions

Accessibility / ADA

Door forces, toe clearances, grab bar dimensions, signage conflicts

Fire Life Safety

Egress capacity, exit requirements, panic hardware contradictions

Structural

Lumber grades, fire blocking spacing, mixed framing materials

Architectural

Plan vs. elevation conflicts, finish schedule contradictions, room numbering

Civil & Site

Property data conflicts, grading issues, erosion control contradictions

Issue Severity Breakdown

35
Critical
Permit blockers, code violations
160
High
Significant coordination issues
160
Medium
Specification conflicts
9
Low
Minor drafting issues

Value Delivered

364 issues surfaced in automated review
35 permit-blocking critical issues identified
Cross-sheet and spec-drawing reconciliation
California code compliance verified (CBC, Title 24, CPC)
Accessibility (CBC 11B / ADA) violations caught
Life safety and egress deficiencies flagged

"I've been in this business for 50 years and this will change the way we do business. This will save me so much time and money. I'm liking what I am seeing. It has some fruitful beginnings. Good work!"

Thomas J. Owens, P.E., P.L.S., Assoc. AIA
Owens Design Consultants, Oakdale, CA

Why Assembly Occupancies Require Rigorous QA/QC

Religious facilities, event centers, and other Group A (Assembly) occupancies face heightened scrutiny from plan checkers and inspectors. With occupant loads often exceeding 500 people, issues with egress, fire protection, accessibility, and utility capacity become life-safety matters.

This project demonstrated how even experienced design teams can have coordination gaps across an 11,000 SF facility with multiple disciplines. From fundamental utility conflicts (gas piping shown with no gas service) to mathematical impossibilities (conditioned area exceeding building area), automated review catches what manual review often misses.

First $100 covered

Catch Issues Before They Hit the Field

Fast turnaround. Prioritized issue list with code references. Works for any project type.

  • 5+ issues or full refund
  • Results in hours
  • No demo required

5+ issues or full refund · No demo required

Sample report: 282 issues found|Pricing after first check

227,181+ customer-visible issues across 2,000+ customer accounts