InspectMind AI logo InspectMind

Salt Lake City Plan Review: 230 Issues Found

An anonymized plan review in Salt Lake City, Utah uncovered coordination and code issues across disciplines, before permit.

First $100 covered. Enterprise and volume pricing

Potential findings
230
Disciplines
5
Codes referenced
4
Critical or high examples shown
15

About this review

InspectMind ran an AI plan review on this project set and returned 230 potential findings across Mechanical, Structural, Architectural, Electrical, Plumbing. The selected examples below show the document conflict, why it matters, and a suggested next step.

Disciplines
Mechanical, Structural, Architectural, Electrical, Plumbing
Potential findings
230
Examples shown
15

Key findings

  1. Issue #151

    Mechanical

    Critical

    Issue #151

  2. Issue #152

    Mechanical

    Critical

    Issue #152

  3. Issue #137

    Structural

    Critical

    Issue #137

  4. Issue #48

    Architectural

    Critical

    Issue #48

  5. Issue #81

    Architectural

    Critical

    Issue #81

  6. Issue #1

    Architectural

    Critical

    Issue #1

  7. Issue #244

    Electrical

    Critical

    Issue #244

  8. Issue #279

    Electrical

    Critical

    Issue #279

  9. Issue #251

    Electrical

    Critical

    Issue #251

  10. Issue #266

    Electrical

    Critical

    Issue #266

Issue categories

Mechanical
HVAC systems, ventilation, exhaust, refrigerant piping, and mechanical code compliance
Structural
Structural connections, load paths, foundation design, and structural code compliance
Architectural
Egress, accessibility, room layouts, building code compliance, and finish specifications
Electrical
Electrical systems, panelboards, circuits, emergency power, and electrical code compliance
Plumbing
Plumbing fixtures, drainage, venting, water supply, and plumbing code compliance

Review details and suggested questions

Issue #151

Mechanical

Critical

Summary: Issue #151

Why it matters: This coordination issue could lead to field conflicts and change orders in Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #151

Issue #152

Mechanical

Critical

Summary: Issue #152

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #152

Issue #137

Structural

Critical

Summary: Issue #137

Why it matters: This coordination issue could lead to field conflicts and change orders in Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #137

Issue #48

Architectural

Critical

Summary: Issue #48

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #48

Issue #81

Architectural

Critical

Summary: Issue #81

Why it matters: This coordination issue could lead to field conflicts and change orders in Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #81

Issue #1

Architectural

Critical

Summary: Issue #1

Why it matters: Failure to address this issue may result in construction delays and costly rework during Commercial construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #1

Issue #244

Electrical

Critical

Summary: Issue #244

Why it matters: This coordination issue could lead to field conflicts and change orders in Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #244

Issue #279

Electrical

Critical

Summary: Issue #279

Why it matters: This issue could cause code violations and may prevent plan approval for Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #279

Issue #251

Electrical

Critical

Summary: Issue #251

Why it matters: This coordination issue could lead to field conflicts and change orders in Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #251

Issue #266

Electrical

Critical

Summary: Issue #266

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #266

Issue #264

Electrical

Critical

Summary: Issue #264

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #264

Issue #249

Electrical

Critical

Summary: Issue #249

Why it matters: Failure to address this issue may result in construction delays and costly rework during Commercial construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #249

Issue #254

Electrical

Critical

Summary: Issue #254

Why it matters: This issue could cause code violations and may prevent plan approval for Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #254

Issue #229

Architectural

Critical

Summary: Issue #229

Why it matters: This coordination issue could lead to field conflicts and change orders in Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #229

Issue #221

Electrical

Critical

Summary: Issue #221

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Commercial projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #221

This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.

Similar AI plan review results by project type and discipline.

Browse all case studies