Residential Development: 14 Issues Found in Pre-Permit Review

AI plan checking uncovered 14 issues including critical retention pond sizing discrepancies, retaining wall height conflicts, and drainage calculation errors before permit submission.

14
Total Issues
3
Critical
6
High
4
Medium

The Project

A residential development project requiring comprehensive civil engineering design including retention/drainage pond systems, erosion control, retaining walls, and site grading. The project included multiple building types (treehouses, A-frames, cottages) and required strict compliance with drainage design standards. Critical issues included major discrepancies between engineering report calculations and construction drawings, particularly around retention pond sizing (ranging from 700 sf to 9,300 sf across different documents) and storage volumes.

Civil Engineering StandardsDrainage Design Standards

Critical Findings (3)

CriticalSpillway retaining wall height inconsistent: 2' on Site Plan vs 42" on Drainage Pond detail/Erosion Control

A1.02a (Site Plan) labels the retaining wall at/near the drainage pond spillway as "12" WIDE X 2' RETAINING WALL." The Drainage Pond detail on A1.02a labels the spillway retaining wall as "12" WIDE X 42" RETAINING WALL." A1.02b (Erosion Control) shows the spillway retaining wall as 42" as well. This creates an inconsistency for the spillway retaining wall height (2' vs 42").

CriticalRetention Pond Area Discrepancy between Report and Drawings

The Engineering Report uses 9,300 sf for the retention pond calculation, which is ten times larger than the '930 SF' listed on the Drainage Pond detail in the drawings. Additionally, the report summary lists the pond area as 700 sf, creating a three-way conflict.

CriticalPond area discrepancy between site plan and detail (5,000 SF vs 930 SF)

The Watershed Site Plan (A1.02a) labels the pond area as 5,000 SF total, while the Drainage Pond Detail (2/A1.02a) defines the total pond area as 930 SF. This is a discrepancy of roughly 5.4x.

High Priority Findings (6 Total)

HighRetention/Drainage pond area and storage volume values conflict between drawings and Engineering Report

The Engineering Report states a retention pond size and provided storage that do not match the pond detail on the Watershed Site Plan. The report lists the pond as "9,300sf" and indicates "(1,800 cf Provided)", while the A1.02a pond detail shows "930 SF TOTAL POND" and includes a storage callout of "2800 CF".

HighSilt fence post spacing conflicts: notes specify 8' max while graphic shows 6' max

The silt fence detail on sheet A1.02b contains conflicting information. Note 2 states posts should be 'spaced not more than 8 feet on center.' However, the graphic callout on the same detail states 'STEEL FENCE POST MAX. 6' SPACING.' This is a 2-foot discrepancy in maximum allowable spacing.

HighUnit schedule differs between Site Plan and Erosion Control sheets

The unit schedule on the Watershed Site Plan (A1.02a) shows: Treehouses - 6 units sleeping 6 each (36 total), A-Frame - 1 unit sleeping 4 (4 total), and TC (Overseer Cottage) - 2 units sleeping 4(6) each (8 (12) total). The unit schedule on the Erosion Control sheet (A1.02b) shows: Treehouses - 5 units sleeping 5 each (25 total), A-Frame - 2 units sleeping 4 each (8 total), and TC5 (Oversize Cottage) - 1 unit sleeping 6(8) (6 (8) total).

HighConflicting Pond Volume Information

The Engineering Report states the provided pond volume is 1,800 cf. However, the Drainage Pond detail on Sheet A1.02a shows volume callouts of 2800 CF and 1500 CF, which conflict with the report's stated provided volume.

HighInconsistent Drainage Pond Surface Area and Storage Volume

The drainage pond sizing is inconsistent between the drawings and the engineering report. Sheet A1.02a (Detail 2) specifies a '930 SF TOTAL POND', whereas the Engineering Report calculations cite a 'Retention Pond' area of '9,300sf' and its summary list specifies 'Pond: 700sf'. Additionally, the storage volume provided in the report is '1,800 cf', but the drawing detail contains labels for '2800 CF', '1500 CF', and '600 CF'.

HighDiscrepancy in Retaining Wall Height at Drainage Pond

There is a conflict between the Engineering Report and the Construction Drawings regarding the pond depth and associated retaining wall height. The Engineering Report (Ref 3) calculates for a 36" (3') pond depth. However, the Watershed Site Plan (A1.02a) and Detail 2 (A1.02a) specifically call for a '12" WIDE X 42"' (3.5') retaining wall at the pond location. Additionally, other areas of the site plan specify 4' tall walls, creating ambiguity if a uniform height was intended or if the 36" calculation is outdated.

Issue Categories

Civil

Retention pond sizing, drainage calculations, erosion control, retaining walls, and civil engineering coordination

Structural

Retaining wall heights, structural coordination, and structural code compliance

Architectural

Unit schedules, building counts, and architectural coordination

Document Coordination

Drawing vs engineering report conflicts, contradictory requirements, and document coordination issues

Value Delivered

14 issues surfaced before permit submission
3 critical permit-blocking issues identified
Retention pond sizing discrepancies caught (700 sf to 9,300 sf range)
Retaining wall height conflicts identified (2' vs 42\")
Drainage volume discrepancies caught (1,800 cf vs 2,800 cf)
Engineering report vs drawing conflicts resolved
Unit schedule conflicts identified between sheets
Erosion control detail conflicts caught (silt fence spacing)

"Finding 14 issues—including 3 critical permit blockers—before submission saved us from weeks of delays, permit rejections, and costly field corrections. The retention pond sizing discrepancies (ranging from 700 sf to 9,300 sf across different documents) would have been an instant plan check rejection. The retaining wall height conflicts and drainage volume discrepancies would have caused major construction problems and potential flooding issues."

— Project Team, Residential Development

First $100 covered

Want This Level of Detail on Your Next Project?

Get comprehensive AI plan review with prioritized issues and code references.

  • 5+ issues or full refund
  • Results in hours
  • No demo required

5+ issues or full refund · No demo required

Sample report: 282 issues found|Pricing after first check

155,000+ customer-visible issues across 2,000+ customer accounts