Single-Family Residence: 13 Issues Found
An anonymized single-family residence plan review uncovered architectural and coordination issues before permit.
Free check on up to 10 drawing pages. Enterprise and volume pricing
- 1Critical · GeneralDrawing Index Audit: 0 missing, 9 mismatched out of 14 sheets
- 2High · CivilSite Data incorrectly identifies FIRM panel number as Flood Zone designation
- 3High · ArchitecturalDuplicate Detail Number 9 on Sheet D1 – TUB WALL DETAIL and FRAMED WALL PLASTER DETAIL share the same reference number
Fig. 1 · Top findings, pinned on the set
- Potential findings
- 14
- Disciplines
- 7
- Codes referenced
- 2
- Critical or high examples shown
- 8
Checkers used on this project
Run the same check on your set →About this review
InspectMind ran an AI plan review on this project set and returned 14 potential findings across Architectural, Civil, Electrical, General, Mechanical, Plumbing, Structural. The selected examples below show the document conflict, why it matters, and a suggested next step.
- Disciplines
- Architectural, Civil, Electrical, General, Mechanical, Plumbing, Structural
- Potential findings
- 14
- Examples shown
- 14
Key findings
- 1Critical
Drawing Index Audit: 0 missing, 9 mismatched out of 14 sheets
General
14 index entries | 5 perfect matches | 9 mismatched | 0 missing Mismatched (9): A1: Expected: SITE PLAN | Actual: PROPOSED SITE PLAN (p2) A2: Expected: DEMOLITION PLAN | Actual: DEMOLITION FLOOR PLAN (p3) D1: Expected: DETAILS | Actual: ARCHITECTURAL DETAILS (p6) P1: Expected: SANITARY DEMOLITION PLAN | ...
- 2High
Site Data incorrectly identifies FIRM panel number as Flood Zone designation
Civil
The Site Data table on sheet A1 lists 'FLOOD ZONE 12099C1178G.' However, 12099C1178G is a FIRM (Flood Insurance Rate Map) panel number, not a flood zone designation. Per ASCE 7-22 Section 5.2, flood zones are designated using specific alpha-numeric codes such as A-Zones (A, AE, A1-30, A99, AR, AO, or AH) or V-Zones (V, VE, VO, or V1-30) for...
- 3High
Duplicate Detail Number 9 on Sheet D1 – TUB WALL DETAIL and FRAMED WALL PLASTER DETAIL share the same reference number
Architectural
Sheet D1 contains two different details both numbered 9/D1: the TUB WALL DETAIL (showing a DensSHIELD® tile backer assembly at a bathtub edge) and the FRAMED WALL PLASTER DETAIL (showing a metal stud interior partition with gypsum wall board on a concrete floor slab). The proposed floor plan on sheet A3 includes a callout bubble reading '9'...
- 4High
Shower drain type conflict: Keyed Note 14 calls for linear drain, but plan/detail show a point (square) drain
Architectural
On A3, Keyed Note 14 explicitly requires a curbless shower sloped to “a linear drain”. However, the master “WET AREA” on the floor plan depicts a central square (point) floor drain with multiple slope callouts to the center, and the plan points to Detail 4/D1. Detail 4/D1 illustrates a single drain body connected to a vertical pipe below the...
- 5High
Sanitary piping sizes shown for TUB/SHR conflict between Plumbing Schedule and sanitary/riser graphics
Plumbing
The Plumbing Schedule lists the tub waste as 1 1/2' and the shower (SHR) waste as 2'. However, the sanitary plan/riser graphics depict 3' piping/branches associated with the tub and SHR connections. This is a direct conflict in required waste pipe sizing for these fixtures.
- 6High
Unpiped Outdoor Shower at Side Patio
Architectural
The Architectural Proposed Floor Plan calls for a 'FREE STANDING OUTDOOR SHOWER' at the Side Patio (Keyed Note 12). However, both the Sanitary Plumbing Plan (P2) and Water Supply Plan (P3) fail to route any sanitary drainage or hot/cold water supply lines to this outdoor shower location.
- 7High
Electrical load calculation uses 2636 sq. ft. vs architectural existing A/C area 3087 SF
Electrical
Sheet A3 lists the conditioned floor area as 'EXISTING A/C AREA 3087 SF' while the electrical service load calculation on sheet E1 is based on '2636 sq. ft. @ 3 watts sq. ft 7908 watts'. These are conflicting area values for the same residence and will change the computed general load and downstream service demand math.
- 8High
Contradictory Instructions for Topping Slab Bond (Vapor Barrier vs. Bush Hammering)
Structural
Detail 1/S2 contains contradictory instructions for preparing the existing slab before pouring the new 4' concrete topping slab. The note requires the contractor to 'BUSH HAMMER EXISTING SLAB TO ROUGHEN SURFACE', which is a standard practice strictly used to create a mechanical bond between old and new concrete. However, the exact same note...
- 9Medium
Bathroom naming is inconsistent between architectural plan (A3) and plumbing plans (P2/P3)
Architectural
On the architectural floor plan (Sheet A3), the lower-right bathroom is labeled 'BATH', while the plumbing sanitary and water supply plans label the corresponding bathroom as 'GUEST BATH'. Also, Sheet A3 labels the remodeled bathroom as 'NEW BATH3', while the plumbing plans label it 'BATH3'. These inconsistent room identifiers can cause...
- 10Medium
Exhaust Fan Location Conflict: Water Closet (WC) vs. Closet (CL)
Architectural
The Architectural plan defines separate adjacent spaces for 'WC' (Water Closet) and 'CL' (Closet). The Electrical plan correctly places an exhaust fan symbol in the WC, but the Mechanical plan calls for an exhaust fan (EF-1) in the CL.
Issue categories
- Cat. 01Architectural
- Egress, accessibility, room layouts, building code compliance, and finish specifications
- Cat. 02Structural
- Structural connections, load paths, foundation design, and structural code compliance
- Cat. 03Electrical
- Electrical systems, panelboards, circuits, and electrical code compliance
- Cat. 04Mechanical
- HVAC systems, ventilation, exhaust, and mechanical code compliance
- Cat. 05Plumbing
- Plumbing fixtures, drainage, venting, water supply, and plumbing code compliance
- Cat. 06Civil
- Site grading, utilities, stormwater, and civil coordination
- Cat. 07General
- Drawing index, coordination, and general plan review findings
Review details and suggested questions
01Drawing Index Audit: 0 missing, 9 mismatched out of 14 sheetsGeneral
Critical
General
Summary: 14 index entries | 5 perfect matches | 9 mismatched | 0 missing Mismatched (9): A1: Expected: SITE PLAN | Actual: PROPOSED SITE PLAN (p2) A2: Expected: DEMOLITION PLAN | Actual: DEMOLITION FLOOR PLAN (p3) D1: Expected: DETAILS | Actual: ARCHITECTURAL DETAILS (p6) P1: Expected: SANITARY DEMOLITION PLAN | ...
Why it matters:
Suggested next step:
RFI draft: 📄 CS Schedule Text: DRAWING INDEX, page 1
02Site Data incorrectly identifies FIRM panel number as Flood Zone designationCivil
High
Civil
Summary: The Site Data table on sheet A1 lists 'FLOOD ZONE 12099C1178G.' However, 12099C1178G is a FIRM (Flood Insurance Rate Map) panel number, not a flood zone designation. Per ASCE 7-22 Section 5.2, flood zones are designated using specific alpha-numeric codes such as A-Zones (A, AE, A1-30, A99, AR, AO, or AH) or V-Zones (V, VE, VO, or V1-30) for...
Why it matters: Without the actual flood zone designation, it cannot be determined whether the building is within a Special Flood Hazard Area requiring compliance with ASCE 7-22 Section 5.3.1 flood load design, Section 5.3.2 erosion and scour provisions, and associated requirements of ASCE/SEI 24. For a canal-adjacent residential property in South Florida,...
Suggested next step: Request the design team confirm the actual FEMA flood zone designation (e.g., AE, VE, X, etc.) for the property from FIRM panel 12099C1178G and update the Site Data accordingly. If the property is within a Special Flood Hazard Area, confirm that the Base Flood Elevation (BFE) and Design Flood Elevation (DFE) have been established and that the...
RFI draft: Request the design team confirm the actual FEMA flood zone designation (e.g., AE, VE, X, etc.) for the property from FIRM panel 12099C1178G and update the Site Data accordingly. If the property is within a Special Flood Hazard Area, confirm that the Base Flood Elevation (BFE) and Design Flood...
03Duplicate Detail Number 9 on Sheet D1 – TUB WALL DETAIL and FRAMED WALL PLASTER DETAIL share the same reference numberArchitectural
High
Architectural
Summary: Sheet D1 contains two different details both numbered 9/D1: the TUB WALL DETAIL (showing a DensSHIELD® tile backer assembly at a bathtub edge) and the FRAMED WALL PLASTER DETAIL (showing a metal stud interior partition with gypsum wall board on a concrete floor slab). The proposed floor plan on sheet A3 includes a callout bubble reading '9'...
Why it matters: During construction, the framing crew and tile installers at the BATH tub wall will not know whether to follow the TUB WALL DETAIL (DensSHIELD® tile backer with flexible sealant at the tub lip) or the FRAMED WALL PLASTER DETAIL (standard 1/2' gypsum wall board on metal studs). Applying the wrong assembly at the tub surround could result in...
Suggested next step: Request that the architect renumber one of the two Detail 9 entries on sheet D1 (the FRAMED WALL PLASTER DETAIL appears to be the candidate for renumbering to Detail 8, which is missing from the sequence) and confirm which detail is intended at the BATH tub wall location referenced as 9/D1 on the A3 floor plan.
RFI draft: Request that the architect renumber one of the two Detail 9 entries on sheet D1 (the FRAMED WALL PLASTER DETAIL appears to be the candidate for renumbering to Detail 8, which is missing from the sequence) and confirm which detail is intended at the BATH tub wall location referenced as 9/D1 on...
04Shower drain type conflict: Keyed Note 14 calls for linear drain, but plan/detail show a point (square) drainArchitectural
High
Architectural
Summary: On A3, Keyed Note 14 explicitly requires a curbless shower sloped to “a linear drain”. However, the master “WET AREA” on the floor plan depicts a central square (point) floor drain with multiple slope callouts to the center, and the plan points to Detail 4/D1. Detail 4/D1 illustrates a single drain body connected to a vertical pipe below the...
Why it matters: This affects drain rough-in location, slab recessing, waterproofing detailing, and tile slope layout. If built per the plan/detail (point drain) while the note requires a linear drain, the installation may not match design intent and could require rework after waterproofing/tile is complete.
Suggested next step: Confirm whether the master wet area is intended to use a linear drain or a point drain. Revise Keyed Note 14 and/or the floor plan symbols and Detail 4/D1 to match the selected drain type (including drain location, slope directions, and waterproofing interface).
RFI draft: Confirm whether the master wet area is intended to use a linear drain or a point drain. Revise Keyed Note 14 and/or the floor plan symbols and Detail 4/D1 to match the selected drain type (including drain location, slope directions, and waterproofing interface).
05Sanitary piping sizes shown for TUB/SHR conflict between Plumbing Schedule and sanitary/riser graphicsPlumbing
High
Plumbing
Summary: The Plumbing Schedule lists the tub waste as 1 1/2' and the shower (SHR) waste as 2'. However, the sanitary plan/riser graphics depict 3' piping/branches associated with the tub and SHR connections. This is a direct conflict in required waste pipe sizing for these fixtures.
Why it matters: Conflicting waste sizes can lead to incorrect rough-in and inspections failures (undersized/oversized piping, incorrect fittings, and rework). It also affects slab penetrations and coordination with structural trench/opening work.
Suggested next step: Please confirm the intended waste pipe sizes for the TUB and SHR connections and revise either the Plumbing Schedule or the sanitary plan/riser diagrams so all sheets match (including any transitions/reducers if 3' mains are intended with smaller fixture arms).
RFI draft: Please confirm the intended waste pipe sizes for the TUB and SHR connections and revise either the Plumbing Schedule or the sanitary plan/riser diagrams so all sheets match (including any transitions/reducers if 3' mains are intended with smaller fixture arms).
06Unpiped Outdoor Shower at Side PatioArchitectural
High
Architectural
Summary: The Architectural Proposed Floor Plan calls for a 'FREE STANDING OUTDOOR SHOWER' at the Side Patio (Keyed Note 12). However, both the Sanitary Plumbing Plan (P2) and Water Supply Plan (P3) fail to route any sanitary drainage or hot/cold water supply lines to this outdoor shower location.
Why it matters: Failing to pipe the outdoor shower will result in missing underground/in-wall rough-ins for both water supply and sanitary waste, rendering the fixture unusable and causing rework after the exterior patio slab is poured.
Suggested next step: Please coordinate the plumbing drawings to provide hot/cold water supply and a sanitary drain connection for the freestanding outdoor shower at the Side Patio, as required by the architectural drawings.
RFI draft: Please coordinate the plumbing drawings to provide hot/cold water supply and a sanitary drain connection for the freestanding outdoor shower at the Side Patio, as required by the architectural drawings.
07Electrical load calculation uses 2636 sq. ft. vs architectural existing A/C area 3087 SFElectrical
High
Electrical
Summary: Sheet A3 lists the conditioned floor area as 'EXISTING A/C AREA 3087 SF' while the electrical service load calculation on sheet E1 is based on '2636 sq. ft. @ 3 watts sq. ft 7908 watts'. These are conflicting area values for the same residence and will change the computed general load and downstream service demand math.
Why it matters: If the electrical load calc is using an understated square footage, the calculated dwelling load may be underreported, potentially affecting feeder/service sizing, panel capacity, and permit review acceptance of the load calculations.
Suggested next step: Confirm the correct floor area to be used for the NEC dwelling unit load calculation and revise the electrical 'SERVICE LOAD CALCULATIONS' to match the project’s documented A/C area (or clearly identify what spaces are intentionally excluded and why).
RFI draft: Confirm the correct floor area to be used for the NEC dwelling unit load calculation and revise the electrical 'SERVICE LOAD CALCULATIONS' to match the project’s documented A/C area (or clearly identify what spaces are intentionally excluded and why).
08Contradictory Instructions for Topping Slab Bond (Vapor Barrier vs. Bush Hammering)Structural
High
Structural
Summary: Detail 1/S2 contains contradictory instructions for preparing the existing slab before pouring the new 4' concrete topping slab. The note requires the contractor to 'BUSH HAMMER EXISTING SLAB TO ROUGHEN SURFACE', which is a standard practice strictly used to create a mechanical bond between old and new concrete. However, the exact same note...
Why it matters: If a bonded topping is required, the vapor barrier must be omitted. If an unbonded topping is intended, the labor-intensive bush hammering process is entirely unnecessary. This creates an impossible condition for the contractor and could lead to incorrect installation or wasted labor.
Suggested next step: Please clarify if the new 4' topping slab at the existing shower recess is intended to be a bonded or unbonded topping. If bonded, confirm that the 6 mil vapor barrier should be omitted. If unbonded, confirm that bush hammering the existing slab is not required.
RFI draft: Please clarify if the new 4' topping slab at the existing shower recess is intended to be a bonded or unbonded topping. If bonded, confirm that the 6 mil vapor barrier should be omitted. If unbonded, confirm that bush hammering the existing slab is not required.
09Bathroom naming is inconsistent between architectural plan (A3) and plumbing plans (P2/P3)Architectural
Medium
Architectural
Summary: On the architectural floor plan (Sheet A3), the lower-right bathroom is labeled 'BATH', while the plumbing sanitary and water supply plans label the corresponding bathroom as 'GUEST BATH'. Also, Sheet A3 labels the remodeled bathroom as 'NEW BATH3', while the plumbing plans label it 'BATH3'. These inconsistent room identifiers can cause...
Why it matters: If room naming is not consistent across disciplines, the contractor/inspector can misapply fixture counts, rough-in locations, and tie-in points (especially where there are multiple bathrooms), leading to rework and delays.
Suggested next step: Please confirm the correct bathroom naming convention to be used consistently across A3, P2, and P3 (e.g., is 'BATH' intended to be 'GUEST BATH'?), and confirm whether 'NEW BATH3' and 'BATH3' refer to the same room. Update sheet labels accordingly for coordination.
RFI draft: Please confirm the correct bathroom naming convention to be used consistently across A3, P2, and P3 (e.g., is 'BATH' intended to be 'GUEST BATH'?), and confirm whether 'NEW BATH3' and 'BATH3' refer to the same room. Update sheet labels accordingly for coordination.
10Exhaust Fan Location Conflict: Water Closet (WC) vs. Closet (CL)Architectural
Medium
Architectural
Summary: The Architectural plan defines separate adjacent spaces for 'WC' (Water Closet) and 'CL' (Closet). The Electrical plan correctly places an exhaust fan symbol in the WC, but the Mechanical plan calls for an exhaust fan (EF-1) in the CL.
Why it matters: Installing an exhaust fan in a standard closet instead of the adjacent water closet violates building code requirements for bathroom ventilation and will require field rerouting of mechanical ductwork and electrical connections.
Suggested next step: Please confirm the exhaust fan labeled EF-1 near the 'CL' on the Mechanical Plan should be relocated to the adjacent 'WC' as shown on the Electrical Plan, and update the mechanical duct routing accordingly.
RFI draft: Please confirm the exhaust fan labeled EF-1 near the 'CL' on the Mechanical Plan should be relocated to the adjacent 'WC' as shown on the Electrical Plan, and update the mechanical duct routing accordingly.
11Window type mark mismatch: floor plan shows hexagonal tag 'A' at Wet Area but schedule and rear elevation use mark '1'Architectural
Medium
Architectural
Summary: On the proposed floor plan (A3), the window opening at the top (north) wall of the WET AREA is identified with a hexagonal tag 'A', which per the symbols legend denotes a WINDOW TYPE. However, the window schedule on the same sheet lists only one window mark: '1' (FROSTED GLASS, 6'-0' × 5'-0', IMPACT RESISTANT), with no entry for mark 'A'. The...
Why it matters: This tagging inconsistency may cause confusion during window procurement and installation. The contractor will be unable to match the plan window tag 'A' to a schedule entry, potentially delaying the order of the impact-resistant frosted glass unit. For permitting review, the inconsistent tagging between plan and elevation could prompt reviewer...
Suggested next step: Request that the architect clarify the correct window type mark for the WET AREA window opening on the A3 floor plan. Confirm whether the hexagonal tag should read '1' (to match the window schedule and rear elevation on A4) instead of 'A', and update the affected drawing accordingly.
RFI draft: Request that the architect clarify the correct window type mark for the WET AREA window opening on the A3 floor plan. Confirm whether the hexagonal tag should read '1' (to match the window schedule and rear elevation on A4) instead of 'A', and update the affected drawing accordingly.
12Inconsistent Exhaust Fan Location for Master Bath Wet AreaMechanical
Medium
Mechanical
Summary: The Mechanical Plan shows an exhaust fan (EF-3) located inside the Master Bath Wet Area, and EF-1 in Bath 3. The Electrical Plan correctly provides a matching exhaust fan symbol (half-shaded circle), circuit, and switching for Bath 3. However, for the Master Bath, the Electrical Plan shows the exhaust fan symbol located outside the Wet Area in...
Why it matters: A location discrepancy between the mechanical and electrical plans could lead to the exhaust fan being roughed-in at the incorrect location. This would fail to provide dedicated ventilation for the Wet Area as intended by the mechanical design, potentially leading to moisture issues and rework.
Suggested next step: Please clarify the intended location for the Master Bath exhaust fan (EF-3). Should it be installed inside the Wet Area per the Mechanical Plan, or in the main Master Bath space per the Electrical Plan? Please update the drawings to coordinate.
RFI draft: Please clarify the intended location for the Master Bath exhaust fan (EF-3). Should it be installed inside the Wet Area per the Mechanical Plan, or in the main Master Bath space per the Electrical Plan? Please update the drawings to coordinate.
13Inconsistent Tagging for Exterior Fence GateArchitectural
Medium
Architectural
Summary: The Proposed Floor Plan tags the exterior gate at the Side Patio with a circular door tag '2', which aligns with the Exterior Door Schedule that lists Mark '2' as a Swing Fence Gate. However, the Rear Elevation points to this proposed fence gate with a circular tag '5'. The Interior Door Schedule identifies Mark '5' as an interior raised panel...
Why it matters: Referencing an interior door mark for an exterior gate on the elevation creates a contradiction between the plan/schedule and the elevation, which could lead to errors in door and hardware ordering.
Suggested next step: Please confirm that the tag on the Rear Elevation for the composite board fence gate should be updated from '5' to '2' to align with the Floor Plan and Exterior Door Schedule.
RFI draft: Please confirm that the tag on the Rear Elevation for the composite board fence gate should be updated from '5' to '2' to align with the Floor Plan and Exterior Door Schedule.
14Toilet drain demolition direction inconsistent: “DRAIN LINE RELOCATED” vs “CUT AND CAP”Architectural
Medium
Architectural
Summary: Architectural keyed notes for toilet demolition explicitly include drain line relocation as part of the scope, while the plumbing demolition plan note instructs to cut and cap existing sanitary lines from existing fixtures. These instructions conflict on whether existing sanitary piping is to be relocated versus cut/capped during demolition.
Why it matters: Demolition sequencing and slab trenching/patching expectations differ significantly depending on whether drains are merely capped for later rework versus relocated during the demolition phase. This can impact inspection readiness and coordination with structural slab repair details.
Suggested next step: Clarify the intended demolition-phase treatment of existing toilet sanitary piping: should lines be cut and capped only, or relocated as part of demolition? If relocation is required, identify the affected fixtures/lines and whether slab trenching/patching is part of this demolition scope.
RFI draft: Clarify the intended demolition-phase treatment of existing toilet sanitary piping: should lines be cut and capped only, or relocated as part of demolition? If relocation is required, identify the affected fixtures/lines and whether slab trenching/patching is part of this demolition scope.
This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.
Related case studies
Similar AI plan review results by project type and discipline.
- ResidentialLong Island Residential: 52 Issues Found52issues · Architectural, Civil
- ResidentialResidential Horizontal Addition: 57 Issues Found57issues · Architectural, Civil
- ResidentialResidential Fireplace Renovation: 28 Issues Including Critical Fire Safety & Document Coordination Violations28issues · Architectural, Mechanical
- MEP CommercialPlan Review: 38 Issues Found38issues · Architectural, Civil
- MEP CommercialPlan Review: 5199 Issues Found5,199issues · Architectural, Civil
- CommercialOttawa Commercial Plan Review: 2731 Issues Found2,731issues · Architectural, Civil