InspectMind AI logo InspectMind
ArchitecturalFire Protection

Tenant Fit-Out: 92 Issues Flagged

Check the fit-out scope against inherited shell-building notes, storefront dimensions, and the issued specification set.

92
Potential findings
2
Disciplines
3
Published examples
Start with $100 creditSee the findings

Enterprise & volume pricing

Anonymized review · Published 2026-09-16

What this review documents

Check the fit-out scope against inherited shell-building notes, storefront dimensions, and the issued specification set.

The documented result is a set of review findings. This case study does not establish that corrections were completed or that savings were realized. The examples below were marked useful in the source review record; they have been paraphrased to remove identifying details.

Open the sample report →See pricing →Read our measurement definitions →

Key findings

Specification sheets are absent from the reviewed set

General & Coordination

High

Six specification pages listed in a 25-page index were not found in the submitted documents.

Next step: Provide the missing specifications or correct the index before relying on cross-document review.

Storefront width differs by one foot

Architectural

High

The floor plan dimensions the new storefront at 48 feet 5 5/8 inches, while enlarged views show 47 feet 5 5/8 inches.

Next step: Resolve the overall width before storefront shop drawings or fabrication.

Shell-building note conflicts with fit-out code data

Architectural / Fire Protection

High

A life-safety note leaves occupant load to a future tenant permit, while the same set identifies a tenant fit-out and calculates 48 occupants.

Next step: Update the scope note and confirm the occupant-load and exit assumptions.

Issue categories

General & Coordination
General & Coordination findings in the selected review excerpts.
Architectural
Architectural findings in the selected review excerpts.
Architectural / Fire Protection
Architectural / Fire Protection findings in the selected review excerpts.

Review details and suggested questions

Specification sheets are absent from the reviewed set
General & Coordination
High

Summary: Six specification pages listed in a 25-page index were not found in the submitted documents.

Why it matters: This discrepancy leaves the design team or contractor with conflicting instructions. Resolve the governing requirement before relying on the affected documents.

Suggested next step: Provide the missing specifications or correct the index before relying on cross-document review.

RFI draft: Provide the missing specifications or correct the index before relying on cross-document review.

Storefront width differs by one foot
Architectural
High

Summary: The floor plan dimensions the new storefront at 48 feet 5 5/8 inches, while enlarged views show 47 feet 5 5/8 inches.

Why it matters: This discrepancy leaves the design team or contractor with conflicting instructions. Resolve the governing requirement before relying on the affected documents.

Suggested next step: Resolve the overall width before storefront shop drawings or fabrication.

RFI draft: Resolve the overall width before storefront shop drawings or fabrication.

Shell-building note conflicts with fit-out code data
Architectural / Fire Protection
High

Summary: A life-safety note leaves occupant load to a future tenant permit, while the same set identifies a tenant fit-out and calculates 48 occupants.

Why it matters: This discrepancy leaves the design team or contractor with conflicting instructions. Resolve the governing requirement before relying on the affected documents.

Suggested next step: Update the scope note and confirm the occupant-load and exit assumptions.

RFI draft: Update the scope note and confirm the occupant-load and exit assumptions.

Anonymized, paraphrased excerpts from a completed project review. These three examples were marked “good catch” in the source review record; that label is feedback, not independent validation. The project total excludes duplicate-group members, dismissed findings, wrong finds, and insufficient-reference findings. Only selected excerpts are published. Customer identity, project address, source identifiers, and private drawings are omitted. Corrections, permit outcomes, and financial savings have not been independently verified. A qualified professional should assess each finding against the complete project documents.

Related case studies

Similar AI plan review results by project type and discipline. Browse all case studies

Nevada Civil & Multi-Discipline Plan Review: 68 Issues Found68 issues · Tenant Improvement · Civil, PlumbingRead case studyMulti-Unit Development: 814 Issues Across 8 Disciplines814 issues · Tenant Improvement · Fire Protection, StructuralRead case studyCalifornia Residential Renovation: 92 Issues Including Critical Structural, Code Compliance & Coordination Violations92 issues · Residential · Structural, ArchitecturalRead case studyChildcare Adaptive Reuse: 86 Issues Including Wrong Jurisdiction Codes86 issues · MEP Commercial · Mechanical, ElectricalRead case studyCommercial Cafe Renovation: 82 Issues Including Critical Fire & Electrical Violations82 issues · Commercial · Structural, ArchitecturalRead case studyOntario CA Commercial Plan Review: 77 Issues Found77 issues · Commercial · Architectural, CivilRead case study
First $100 covered

Want this on your next set?

Start with the first $100 covered. See cited issues in hours, no call required.

  • Evidence-linked findings
  • 5+ issues or full refund
  • Results in hours

5+ issues or full refund · No demo required

View all case studies|See pricing