QC your civil engineer's set before the AHJ does
AI cross-checks grading, utility, and site plans against the project spec book and your selected codes — so you walk into pre-submittal with a triaged list instead of a 200-line plan check.
Grading, drainage, utilities, erosion — one set, one check. 5+ issues or full refund.
Trusted by 500+ companies including
Architects · Engineers · GCs · Developers · Owner's Reps · Plan Checkers · Insurance
QC your consultant's work without becoming the bottleneck
AI flags the issues you would catch on a careful read, so you can spend your time on the ones that matter.
Pre-submittal QC
Catch utility-location and sizing mismatches between civil sheets, dimensional discrepancies between drawings, and missing call-outs before the package goes to the city.
Code-Year Drift
Flag code references that do not match the year or jurisdiction stated on the cover sheet — a common cause of plan check rejection.
Fewer Civil RFIs
Hand your civil engineer an already-triaged list with code citations and sheet references instead of a back-and-forth email chain.
Severity-Ranked
High / Medium / Low ranking so your team triages the critical issues first instead of reading 200 line items end to end.
What AI catches in a civil / land-dev set
The cross-sheet coordination work that slips through a one-pass review.
Grading & Drainage
- Pipe elevations vs profile mismatches
- Slope limits exceeded
- Drainage calc vs detail mismatches
- Missing erosion control callouts
Utility Coordination
- Civil vs MEP utility clashes
- Service location mismatches
- Easement / right-of-way conflicts
- Utility sizing discrepancies
Code Compliance
- Code-year drift on civil sheets
- Local design standard gaps
- ADA slope and drainage
- SWPPP / stormwater compliance
Cross-Sheet Errors
- Cover sheet vs sheet index mismatches
- Detail callouts pointing to wrong sheet
- Boundary / setback discrepancies
- Tract / parcel number drift
When to run it
A 30-minute QC pass that saves a plan-check cycle.
Pre-Submittal QC
Run before the package goes to the AHJ. Catch the obvious stuff your civil engineer would have caught on one more pass.
- Fewer plan check comments
- Cleaner first submittal
- Faster permit
New Division / New Jurisdiction
When your team picks up a tract in a jurisdiction you haven't built in recently, AI flags code-year drift and local amendment gaps automatically.
- Code-year confidence
- Local amendment coverage
- Lower jurisdiction risk
Multi-Tract Releases
Apply the same QC standard across every tract in a release. Same checks, same severity ranking, same export format.
- Portfolio consistency
- Scalable QA process
- Cross-tract comparison
How it works for land development teams
Upload, review, send your civil engineer the triaged list.
Upload the civil set
Grading, utility, drainage, erosion, and the project manual. PDFs exported from Civil 3D or AutoCAD work as is.
Pick the applicable codes
Local building, energy, residential, plus any jurisdictional amendments — we host the full code library.
Review prioritized findings
Side-by-side viewer: click a finding, see the exact drawing region and code citation on the same screen.
Send to your civil engineer
Export the triaged list to PDF or CSV so your consultant has a clean punch list before resubmittal.
"Being able to check for codes and between pages, anything out of sync — that's hard for me to do. I like that you're specifying what is code, if it's critical, high, or medium. The cross-page checking catches things that are nearly impossible to find manually."
Julio
Owner, Pesco Engineering
See what one check saves you
Based on real data from 2,800+ projects and 58,000+ issues found.
Your project details
InspectMind cost
Up to 250 sheets · flat
InspectMind
$250
One RFI
$3,500
One rework
$15,000
Estimated savings
~140
Critical issues caught
Code violations, structural conflicts, rework avoided
High-severity issues caught
RFIs prevented, coordination clashes resolved
Medium issues caught
Drawing gaps, specification clarifications
$250 investment → $179K saved
715x
One critical issue caught pays for 60 checks. Even the most skeptical estimate shows massive ROI — because catching problems in design costs 10–100x less than fixing them in the field.
5+ issues found or full refund guaranteed
How we calculate savings
Issue count: ~70 issues per 100 drawing sheets — our real average across 2,800+ completed projects.
Severity split: 14% Critical / 53% High / 33% Medium — from 58,000+ real issues exported from our production database.
Savings model: We estimate what fraction of issues at each severity would have caused a costly downstream problem (RFI, change order, rework) if not caught during design review. We use conservative "escape rates" — 40% for Critical, 20% for High, 10% for Medium — well below industry rework benchmarks (CII: 5–10% of project value).
Cost per escaped issue: Critical $10K–$50K (scales with project value — rework on a $50M project costs more than on a $1M project), High $2K–$8K (RFI + delay), Medium $1.5K (minor rework). Based on CII, FMI, and Navigant construction industry research.
Learn More
Explore guides, articles, and case studies
Ready to QC your next civil set?
Upload the package, run a check, walk into pre-submittal with a triaged list. From $50.