Early Learning and Education Service Center, Central Indiana: 388 Issues Flagged
Check elevator shutdown, overcurrent protection, and alarm signaling in an early learning and district services building.
Anonymized review · Published 2026-11-09
Free check on up to 10 drawing pages. Enterprise and volume pricing
- 1Critical · Fire Protection / ElectricalElevator power shutdown is triggered by waterflow instead of before discharge
- 2High · Mechanical / ElectricalOutdoor air unit breakers exceed the scheduled MOCP
- 3High · Fire Protection / ElectricalSprinkler bell rings for supervisory valve signals
Fig. 1 · Top findings, pinned on the set
- Potential findings
- 388
- Disciplines
- 7
- Published examples
- 3
- Critical or high examples shown
- 3
Checkers used on this project
Run the same check on your set →About this review
InspectMind ran an AI plan review on this education set and returned 388 potential findings across Fire Protection, Electrical, Mechanical, Architectural, Plumbing, Structural, Civil. The selected examples below show the document conflict, why it matters, and a suggested next step.
- Project type
- Education
- Disciplines
- Fire Protection, Electrical, Mechanical, Architectural, Plumbing, Structural, Civil
- Potential findings
- 388
- Published examples
- 3
- Published
- 2026-11-09
- Evidence status
- Selected from open findings in the source review record
What this review documents
Check elevator shutdown, overcurrent protection, and alarm signaling in an early learning and district services building.
The documented result is a set of review findings. This case study does not establish that corrections were completed or that savings were realized. The examples below were marked useful in the source review record; they have been paraphrased to remove identifying details.
Key findings
- 1Critical
Elevator power shutdown is triggered by waterflow instead of before discharge
Fire Protection / Electrical · IBC 3006.5
A fire alarm keynote shuts down elevator power upon flow of water in the sprinkler system, while the code requires power to the elevator to disconnect before sprinkler discharge.
Next step: Revise the sequence so heat detection near the sprinklers trips elevator power before discharge.
- 2High
Outdoor air unit breakers exceed the scheduled MOCP
Mechanical / Electrical · NEC 110.3(B)
The air handling unit schedule lists 60A and 70A maximum overcurrent protection for three dedicated outdoor air units, while the panel schedules show 80A breakers for the same units.
Next step: Resize the breakers to the scheduled MOCP or confirm revised equipment data.
- 3High
Sprinkler bell rings for supervisory valve signals
Fire Protection / Electrical · NFPA 72
A keynote directs the same alarm bell to sound for waterflow switches and for supervisory valve signals, while alarm and supervisory signals must be distinct.
Next step: Program the bell for waterflow only and route valve supervisory signals to the panel.
Issue categories
- Cat. 01Fire Protection / Electrical
- Fire Protection / Electrical findings in the selected review excerpts.
- Cat. 02Mechanical / Electrical
- Mechanical / Electrical findings in the selected review excerpts.
Review details and suggested questions
01Elevator power shutdown is triggered by waterflow instead of before dischargeFire Protection / Electrical · IBC 3006.5
Critical
Fire Protection / Electrical · IBC 3006.5
Summary: A fire alarm keynote shuts down elevator power upon flow of water in the sprinkler system, while the code requires power to the elevator to disconnect before sprinkler discharge.
Why it matters: Water reaching elevator equipment before power is cut is the hazard the shunt trip is meant to prevent.
Suggested next step: Revise the sequence so heat detection near the sprinklers trips elevator power before discharge.
RFI draft: Revise the sequence so heat detection near the sprinklers trips elevator power before discharge.
02Outdoor air unit breakers exceed the scheduled MOCPMechanical / Electrical · NEC 110.3(B)
High
Mechanical / Electrical · NEC 110.3(B)
Summary: The air handling unit schedule lists 60A and 70A maximum overcurrent protection for three dedicated outdoor air units, while the panel schedules show 80A breakers for the same units.
Why it matters: Breakers above the listed maximum void the equipment listing and are a common inspection failure.
Suggested next step: Resize the breakers to the scheduled MOCP or confirm revised equipment data.
RFI draft: Resize the breakers to the scheduled MOCP or confirm revised equipment data.
03Sprinkler bell rings for supervisory valve signalsFire Protection / Electrical · NFPA 72
High
Fire Protection / Electrical · NFPA 72
Summary: A keynote directs the same alarm bell to sound for waterflow switches and for supervisory valve signals, while alarm and supervisory signals must be distinct.
Why it matters: Occupants and responders cannot tell a real waterflow alarm from a closed valve.
Suggested next step: Program the bell for waterflow only and route valve supervisory signals to the panel.
RFI draft: Program the bell for waterflow only and route valve supervisory signals to the panel.
Anonymized, paraphrased excerpts from a completed project review. These three examples were selected editorially from findings the source review record kept open (not dismissed or marked wrong); that selection is not independent validation. The project total excludes duplicate-group members, dismissed findings, wrong finds, and insufficient-reference findings. Only selected excerpts are published. Customer identity, project address, source identifiers, and private drawings are omitted. Corrections, permit outcomes, and financial savings have not been independently verified. A qualified professional should assess each finding against the complete project documents.
Related case studies
Similar AI plan review results by project type and discipline.
- EducationMiddle and High School Renovation, Massachusetts: 1,637 Issues Flagged1,637issues · Structural, Mechanical
- EducationElementary School, West Virginia: 919 Issues Flagged919issues · Plumbing, Electrical
- ResidentialHigh-Rise Residential Tower: 420 Issues Including Critical Document Coordination, Structural & Code Violations420issues · Fire Protection, Structural
- MultifamilyMultifamily Residential Development: 419 Issues Including Critical Fire, Egress & Code Violations419issues · Fire Protection, Structural
- ResidentialResidential Mixed-Use Building: 417 Issues Found417issues · Architectural, Structural
- ResidentialResidential Rowhomes: 370 Issues Found370issues · Architectural, Structural