388Potential findings
Flagged
  1. 1Critical · Fire Protection / ElectricalElevator power shutdown is triggered by waterflow instead of before discharge
  2. 2High · Mechanical / ElectricalOutdoor air unit breakers exceed the scheduled MOCP
  3. 3High · Fire Protection / ElectricalSprinkler bell rings for supervisory valve signals

Fig. 1 · Top findings, pinned on the set

Potential findings
388
Disciplines
7
Published examples
3
Critical or high examples shown
3

Checkers used on this project

Run the same check on your set →
Sheet 01·Case file

About this review

InspectMind ran an AI plan review on this education set and returned 388 potential findings across Fire Protection, Electrical, Mechanical, Architectural, Plumbing, Structural, Civil. The selected examples below show the document conflict, why it matters, and a suggested next step.

Project type
Education
Disciplines
Fire Protection, Electrical, Mechanical, Architectural, Plumbing, Structural, Civil
Potential findings
388
Published examples
3
Published
2026-11-09
Evidence status
Selected from open findings in the source review record

What this review documents

Check elevator shutdown, overcurrent protection, and alarm signaling in an early learning and district services building.

The documented result is a set of review findings. This case study does not establish that corrections were completed or that savings were realized. The examples below were marked useful in the source review record; they have been paraphrased to remove identifying details.

Key findings

  1. 1

    Elevator power shutdown is triggered by waterflow instead of before discharge

    Fire Protection / Electrical · IBC 3006.5

    Critical

    A fire alarm keynote shuts down elevator power upon flow of water in the sprinkler system, while the code requires power to the elevator to disconnect before sprinkler discharge.

    Next step: Revise the sequence so heat detection near the sprinklers trips elevator power before discharge.

  2. 2

    Outdoor air unit breakers exceed the scheduled MOCP

    Mechanical / Electrical · NEC 110.3(B)

    High

    The air handling unit schedule lists 60A and 70A maximum overcurrent protection for three dedicated outdoor air units, while the panel schedules show 80A breakers for the same units.

    Next step: Resize the breakers to the scheduled MOCP or confirm revised equipment data.

  3. 3

    Sprinkler bell rings for supervisory valve signals

    Fire Protection / Electrical · NFPA 72

    High

    A keynote directs the same alarm bell to sound for waterflow switches and for supervisory valve signals, while alarm and supervisory signals must be distinct.

    Next step: Program the bell for waterflow only and route valve supervisory signals to the panel.

Issue categories

Cat. 01Fire Protection / Electrical
Fire Protection / Electrical findings in the selected review excerpts.
Cat. 02Mechanical / Electrical
Mechanical / Electrical findings in the selected review excerpts.

Review details and suggested questions

01
Elevator power shutdown is triggered by waterflow instead of before discharge

Fire Protection / Electrical · IBC 3006.5

Critical

Summary: A fire alarm keynote shuts down elevator power upon flow of water in the sprinkler system, while the code requires power to the elevator to disconnect before sprinkler discharge.

Why it matters: Water reaching elevator equipment before power is cut is the hazard the shunt trip is meant to prevent.

Suggested next step: Revise the sequence so heat detection near the sprinklers trips elevator power before discharge.

RFI draft: Revise the sequence so heat detection near the sprinklers trips elevator power before discharge.

02
Outdoor air unit breakers exceed the scheduled MOCP

Mechanical / Electrical · NEC 110.3(B)

High

Summary: The air handling unit schedule lists 60A and 70A maximum overcurrent protection for three dedicated outdoor air units, while the panel schedules show 80A breakers for the same units.

Why it matters: Breakers above the listed maximum void the equipment listing and are a common inspection failure.

Suggested next step: Resize the breakers to the scheduled MOCP or confirm revised equipment data.

RFI draft: Resize the breakers to the scheduled MOCP or confirm revised equipment data.

03
Sprinkler bell rings for supervisory valve signals

Fire Protection / Electrical · NFPA 72

High

Summary: A keynote directs the same alarm bell to sound for waterflow switches and for supervisory valve signals, while alarm and supervisory signals must be distinct.

Why it matters: Occupants and responders cannot tell a real waterflow alarm from a closed valve.

Suggested next step: Program the bell for waterflow only and route valve supervisory signals to the panel.

RFI draft: Program the bell for waterflow only and route valve supervisory signals to the panel.

Anonymized, paraphrased excerpts from a completed project review. These three examples were selected editorially from findings the source review record kept open (not dismissed or marked wrong); that selection is not independent validation. The project total excludes duplicate-group members, dismissed findings, wrong finds, and insufficient-reference findings. Only selected excerpts are published. Customer identity, project address, source identifiers, and private drawings are omitted. Corrections, permit outcomes, and financial savings have not been independently verified. A qualified professional should assess each finding against the complete project documents.

Similar AI plan review results by project type and discipline.