Elementary School, West Virginia: 919 Issues Flagged
Check plumbing code, electrical service ratings, and storm and sanitary separation in a new school bid set.
Anonymized review · Published 2026-11-09
Free check on up to 10 drawing pages. Enterprise and volume pricing
- 1High · Plumbing / ArchitecturalDrinking fountains are placed inside restroom lavatory areas
- 2High · ElectricalMain service switchboard ratings conflict on one sheet
- 3High · Civil / PlumbingStorm manhole is shown at a sanitary sewer junction
Fig. 1 · Top findings, pinned on the set
- Potential findings
- 919
- Disciplines
- 7
- Published examples
- 3
- Critical or high examples shown
- 3
About this review
InspectMind ran an AI plan review on this education set and returned 919 potential findings across Plumbing, Electrical, Civil, Architectural, Mechanical, Structural, Fire Protection. The selected examples below show the document conflict, why it matters, and a suggested next step.
- Project type
- Education
- Disciplines
- Plumbing, Electrical, Civil, Architectural, Mechanical, Structural, Fire Protection
- Potential findings
- 919
- Published examples
- 3
- Published
- 2026-11-09
- Evidence status
- Selected from open findings in the source review record
What this review documents
Check plumbing code, electrical service ratings, and storm and sanitary separation in a new school bid set.
The documented result is a set of review findings. This case study does not establish that corrections were completed or that savings were realized. The examples below were marked useful in the source review record; they have been paraphrased to remove identifying details.
Key findings
- 1High
Drinking fountains are placed inside restroom lavatory areas
Plumbing / Architectural · IPC 410.5
Enlarged restroom plans show drinking fountains in the lavatory portions of two student restroom groups, while IPC 410.5 prohibits drinking fountains in public restrooms.
Next step: Move the drinking fountains to corridor alcoves outside the restrooms and update the plumbing plans.
- 2High
Main service switchboard ratings conflict on one sheet
Electrical
A tagged note calls for a 2500A switchboard rated 100 kAIC with a 2500A main breaker, while the same sheet lists a 2000A service and the one-line labels the switchboard 2000A at 65 kA.
Next step: Confirm the service size and interrupting rating, and align the note, service data, and one-line.
- 3High
Storm manhole is shown at a sanitary sewer junction
Civil / Plumbing · IPC 1101.3
The legend separates new storm and sanitary lines, but one storm manhole is drawn at a junction of storm, roof drain, and sanitary lines.
Next step: Separate the storm and sanitary systems at this structure and revise the utility plan.
Issue categories
- Cat. 01Plumbing / Architectural
- Plumbing / Architectural findings in the selected review excerpts.
- Cat. 02Electrical
- Electrical findings in the selected review excerpts.
- Cat. 03Civil / Plumbing
- Civil / Plumbing findings in the selected review excerpts.
Review details and suggested questions
01Drinking fountains are placed inside restroom lavatory areasPlumbing / Architectural · IPC 410.5
High
Plumbing / Architectural · IPC 410.5
Summary: Enlarged restroom plans show drinking fountains in the lavatory portions of two student restroom groups, while IPC 410.5 prohibits drinking fountains in public restrooms.
Why it matters: Relocating fountains after rough-in means new walls, piping, and alcoves.
Suggested next step: Move the drinking fountains to corridor alcoves outside the restrooms and update the plumbing plans.
RFI draft: Move the drinking fountains to corridor alcoves outside the restrooms and update the plumbing plans.
02Main service switchboard ratings conflict on one sheetElectrical
High
Electrical
Summary: A tagged note calls for a 2500A switchboard rated 100 kAIC with a 2500A main breaker, while the same sheet lists a 2000A service and the one-line labels the switchboard 2000A at 65 kA.
Why it matters: Service gear has long lead times, and the utility application depends on the service size.
Suggested next step: Confirm the service size and interrupting rating, and align the note, service data, and one-line.
RFI draft: Confirm the service size and interrupting rating, and align the note, service data, and one-line.
03Storm manhole is shown at a sanitary sewer junctionCivil / Plumbing · IPC 1101.3
High
Civil / Plumbing · IPC 1101.3
Summary: The legend separates new storm and sanitary lines, but one storm manhole is drawn at a junction of storm, roof drain, and sanitary lines.
Why it matters: Storm water cannot drain into a sewer intended only for sewage.
Suggested next step: Separate the storm and sanitary systems at this structure and revise the utility plan.
RFI draft: Separate the storm and sanitary systems at this structure and revise the utility plan.
Anonymized, paraphrased excerpts from a completed project review. These three examples were selected editorially from findings the source review record kept open (not dismissed or marked wrong); that selection is not independent validation. The project total excludes duplicate-group members, dismissed findings, wrong finds, and insufficient-reference findings. Only selected excerpts are published. Customer identity, project address, source identifiers, and private drawings are omitted. Corrections, permit outcomes, and financial savings have not been independently verified. A qualified professional should assess each finding against the complete project documents.
Related case studies
Similar AI plan review results by project type and discipline.
- EducationMiddle and High School Renovation, Massachusetts: 1,637 Issues Flagged1,637issues · Structural, Mechanical
- EducationEarly Learning and Education Service Center, Central Indiana: 388 Issues Flagged388issues · Fire Protection, Electrical
- MEP CommercialBay Area Plan Review: 899 Issues Found899issues · Architectural, Structural
- EducationCareer and Technical Center, West Virginia: 273 Issues Flagged273issues · Electrical, Fire Protection
- MultifamilyMultifamily Buildings, Central Massachusetts: 1,006 Issues Flagged1,006issues · Architectural, Structural
- MEP CommercialLarge Institutional Building: 780 Issues Found780issues · Electrical, Fire Protection