Florida Electrical & Code Compliance Plan Review: 121 Issues Found

An anonymized Florida plan review found 121 issues across electrical, architectural, mechanical, plumbing, and fire protection—including NEC edition compliance.

121
Issues found
8
Disciplines
4
Codes referenced
Start with $100 creditSee the findings

Enterprise & volume pricing

Key findings

General Note 9 States Design Based on 2008 NEC, Contradicting Required 2020 NEC Compliance

Electrical

Critical

General Note 9 in Section 16010 explicitly states 'THE DESIGN IS BASED ON THE 2008 NATIONAL ELECTRIC CODE,' while General Note 3 in the same section requires 'INSTALLATION SHALL COMPLY WITH THE 2020 EDITION OF THE NATIONAL ELECTRICAL CODE AND THE 2023 8TH EDITION OF THE FLORIDA BUILDING CODE.' This is a direct contradiction in the construction documents regarding the applicable code edition. If the electrical design is truly based on the 2008 NEC, numerous requirements introduced or modified ove

Cafe Island counter height of 3'-6" (42") exceeds 34" maximum for accessible dining surfaces

Architectural

Critical

The Cafe Island elevation (C3) explicitly dimensions the countertop height at 3'-6" (42 inches) from finished floor to top of counter. Section 902.3 requires the tops of dining surfaces and work surfaces to be 28 inches minimum and 34 inches maximum above the finish floor. A cafe island functions as a dining surface (the advisory to 902.1 states that dining surfaces include bars, tables, lunch counters, and booths). At 42 inches, this counter exceeds the 34-inch maximum by 8 inches. No lowere

Large Classroom (01-023) fixed assembly seating layout does not include required wheelchair spaces

Architectural

Critical

The Large Classroom (01-023) is depicted with dense, theater-style fixed seating arranged in two main blocks separated by a central aisle with aisles along the outer edges. The seating blocks fill the room with no visible wheelchair space positions integrated into the layout. Per Section 221.2, wheelchair spaces are required in assembly areas with fixed seating, and per Section 221.1, companion seats and designated aisle seats must also be provided. The seating layout as drawn shows no designate

Turning space in single restroom 01-044A is obstructed by the floor-mounted toilet

Architectural

Critical

The enlarged partition plan for single restroom 01-044A shows a dashed 60-inch circular turning space that overlaps the floor-mounted toilet (EQ-20). The building code requires a turning space to be clear of obstructions unless the element provides compliant knee and toe clearance. Because a floor-mounted toilet extends completely to the floor, it provides no knee or toe clearance, making the drawn turning space obstructed and non-compliant.

Corridor lighting control strategy allows complete shutoff, violating continuous means of egress illumination requirement

Electrical

Critical

General Note 5 on the lighting plan explicitly states that corridor lighting shall 'SHUT OFF AFTER A ADDITIONAL 20 MINUTES' of inactivity. Corridors serve as the means of egress for adjacent occupied rooms (offices, classrooms, conference rooms, etc.). Section 1008.2 of the Florida Building Code requires that 'The means of egress serving a room or space shall be illuminated at all times that the room or space is occupied.' Corridor occupancy sensors only detect motion within the corridor itself

General Note 9 references 2008 NEC as design basis, violating 2023 FBC requirement for NFPA 70 (2020 NEC)

Electrical

Critical

General Note 9 explicitly states 'THE DESIGN IS BASED ON THE 2008 NATIONAL ELECTRIC CODE.' The 2023 Florida Building Code, Section 2701.1, requires that electrical design comply with NFPA 70, which for the 2023 8th Edition FBC is the 2020 NEC. Referencing the 2008 NEC as the design basis is a direct code violation. This is further contradicted by the drawing's own General Note 3, which correctly states compliance with the '2020 EDITION OF THE NATIONAL ELECTRICAL CODE AND THE 2023 8TH EDITION OF

Delegation of fire damper location design to contractor

Mechanical

Critical

The mechanical general notes explicitly instruct the contractor to provide fire dampers at rated wall penetrations "WEATHER IT IS SPECIFICALLY SHOWN ON THESE DRAWINGS OR NOT." This directly violates the building code, which mandates that the specific location and installation details for all fire, ceiling, and smoke dampers must be shown and properly identified on the plans by the designer.

Expansion tank isolated from water heater by check valve

Plumbing

Critical

Detail "EWH-1 WATER HEATER DETAIL" shows a "CHECK VALVE (TYP)" installed on the "COLD WATER SUPPLY" line between the "EXPANSION TANK PER MANUFACTURER'S RECOMMENDATION" and the "WATER HEATER". This arrangement blocks backflow from the water heater to the expansion tank.

Atmospheric vacuum breaker subjected to continuous pressure

Plumbing

Critical

Detail "EWH-1 WATER HEATER DETAIL" specifies a "VACUUM BREAKER WATTS NO. 288A OR EQUAL" on the main "COLD WATER SUPPLY" line. The system is subjected to continuous pressure and includes a "CHECK VALVE (TYP)" on the hot water return line that connects downstream of the vacuum breaker.

EWH-1 Water Heater Detail Shows Expansion Tank Upstream of Check Valve on Cold Water Supply

Plumbing

Critical

The EWH-1 Water Heater Detail shows the cold water supply line with the expansion tank positioned upstream of the check valve. The piping sequence depicted along the cold water supply line is: ball valve, union, expansion tank, check valve, then vacuum breaker entering the water heater. Per Section 607.3, the thermal expansion control device shall be connected at a point that is downstream of all check valves, pressure reducing valves and backflow preventers. With the expansion tank upstream of

Issue categories

Architectural
Plan review findings for Architectural discipline.
Civil
Plan review findings for Civil discipline.
Electrical
Plan review findings for Electrical discipline.
Fire Protection
Plan review findings for Fire Protection discipline.
Life Safety
Plan review findings for Life Safety discipline.
Mechanical
Plan review findings for Mechanical discipline.
Plumbing
Plan review findings for Plumbing discipline.
Structural
Plan review findings for Structural discipline.

More example findings

General Note 9 States Design Based on 2008 NEC, Contradicting Required 2020 NEC Compliance
Electrical
Critical

Summary: General Note 9 in Section 16010 explicitly states 'THE DESIGN IS BASED ON THE 2008 NATIONAL ELECTRIC CODE,' while General Note 3 in the same section requires 'INSTALLATION SHALL COMPLY WITH THE 2020 EDITION OF THE NATIONAL ELECTRICAL CODE AND THE 2023 8TH EDITION OF THE FLORIDA BUILDING CODE.' This is a direct contradiction in the construction documents regarding the applicable code edition. If the electrical design is truly based on the 2008 NEC, numerous requirements introduced or modified ove

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Cafe Island counter height of 3'-6" (42") exceeds 34" maximum for accessible dining surfaces
Architectural
Critical

Summary: The Cafe Island elevation (C3) explicitly dimensions the countertop height at 3'-6" (42 inches) from finished floor to top of counter. Section 902.3 requires the tops of dining surfaces and work surfaces to be 28 inches minimum and 34 inches maximum above the finish floor. A cafe island functions as a dining surface (the advisory to 902.1 states that dining surfaces include bars, tables, lunch counters, and booths). At 42 inches, this counter exceeds the 34-inch maximum by 8 inches. No lowere

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Large Classroom (01-023) fixed assembly seating layout does not include required wheelchair spaces
Architectural
Critical

Summary: The Large Classroom (01-023) is depicted with dense, theater-style fixed seating arranged in two main blocks separated by a central aisle with aisles along the outer edges. The seating blocks fill the room with no visible wheelchair space positions integrated into the layout. Per Section 221.2, wheelchair spaces are required in assembly areas with fixed seating, and per Section 221.1, companion seats and designated aisle seats must also be provided. The seating layout as drawn shows no designate

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Turning space in single restroom 01-044A is obstructed by the floor-mounted toilet
Architectural
Critical

Summary: The enlarged partition plan for single restroom 01-044A shows a dashed 60-inch circular turning space that overlaps the floor-mounted toilet (EQ-20). The building code requires a turning space to be clear of obstructions unless the element provides compliant knee and toe clearance. Because a floor-mounted toilet extends completely to the floor, it provides no knee or toe clearance, making the drawn turning space obstructed and non-compliant.

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Corridor lighting control strategy allows complete shutoff, violating continuous means of egress illumination requirement
Electrical
Critical

Summary: General Note 5 on the lighting plan explicitly states that corridor lighting shall 'SHUT OFF AFTER A ADDITIONAL 20 MINUTES' of inactivity. Corridors serve as the means of egress for adjacent occupied rooms (offices, classrooms, conference rooms, etc.). Section 1008.2 of the Florida Building Code requires that 'The means of egress serving a room or space shall be illuminated at all times that the room or space is occupied.' Corridor occupancy sensors only detect motion within the corridor itself

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

General Note 9 references 2008 NEC as design basis, violating 2023 FBC requirement for NFPA 70 (2020 NEC)
Electrical
Critical

Summary: General Note 9 explicitly states 'THE DESIGN IS BASED ON THE 2008 NATIONAL ELECTRIC CODE.' The 2023 Florida Building Code, Section 2701.1, requires that electrical design comply with NFPA 70, which for the 2023 8th Edition FBC is the 2020 NEC. Referencing the 2008 NEC as the design basis is a direct code violation. This is further contradicted by the drawing's own General Note 3, which correctly states compliance with the '2020 EDITION OF THE NATIONAL ELECTRICAL CODE AND THE 2023 8TH EDITION OF

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Delegation of fire damper location design to contractor
Mechanical
Critical

Summary: The mechanical general notes explicitly instruct the contractor to provide fire dampers at rated wall penetrations "WEATHER IT IS SPECIFICALLY SHOWN ON THESE DRAWINGS OR NOT." This directly violates the building code, which mandates that the specific location and installation details for all fire, ceiling, and smoke dampers must be shown and properly identified on the plans by the designer.

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Expansion tank isolated from water heater by check valve
Plumbing
Critical

Summary: Detail "EWH-1 WATER HEATER DETAIL" shows a "CHECK VALVE (TYP)" installed on the "COLD WATER SUPPLY" line between the "EXPANSION TANK PER MANUFACTURER'S RECOMMENDATION" and the "WATER HEATER". This arrangement blocks backflow from the water heater to the expansion tank.

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Atmospheric vacuum breaker subjected to continuous pressure
Plumbing
Critical

Summary: Detail "EWH-1 WATER HEATER DETAIL" specifies a "VACUUM BREAKER WATTS NO. 288A OR EQUAL" on the main "COLD WATER SUPPLY" line. The system is subjected to continuous pressure and includes a "CHECK VALVE (TYP)" on the hot water return line that connects downstream of the vacuum breaker.

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

EWH-1 Water Heater Detail Shows Expansion Tank Upstream of Check Valve on Cold Water Supply
Plumbing
Critical

Summary: The EWH-1 Water Heater Detail shows the cold water supply line with the expansion tank positioned upstream of the check valve. The piping sequence depicted along the cold water supply line is: ball valve, union, expansion tank, check valve, then vacuum breaker entering the water heater. Per Section 607.3, the thermal expansion control device shall be connected at a point that is downstream of all check valves, pressure reducing valves and backflow preventers. With the expansion tank upstream of

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Improper Junction Box Cover Opening for Power Whip
Electrical
High

Summary: Key Note 10 instructs the contractor to "PROVIDE OPENING IN J-BOX COVER TO ALLOW MODULAR FURNITURE WHIP CONNECTION." A line-voltage modular furniture power whip requires a listed mechanical fitting (e.g., terminating at a knockout) to properly secure the cable to the enclosure. Providing an unfitted opening in the cover leaves the line-voltage whip unsecured and violates the requirement that junction box covers be suitable for the conditions of use and compatible with the box construction.

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

iPad Room Scheduler Centerline at 48" Places Upper Operable Touch Surface Above Maximum Reach Range
Architectural
High

Summary: The Typical Room Scheduler Mounting detail dimensions the iPad centerline at 4'-0" (48") above the finished floor. An iPad is a touchscreen device where the entire screen surface constitutes an operable part. With the centerline at 48", the upper half of the touchscreen extends above 48". Per Section 309.3, operable parts shall be placed within the reach ranges specified in Section 308. Per Section 308.2.1, the high forward reach shall be 48 inches maximum above the finish floor. Sin

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Monitor bracket protrusion note limits only bracket to 4", not total monitor assembly, per Section 307.2
Architectural
High

Summary: Details A3 (Communication Hub Display), A10 (Awards Wall TV and Cabinet), and A12 (Classroom TV Niche) each include a note limiting the monitor bracket to 4" past the drywall face. However, Section 307.2 limits the protrusion of the object itself — not just its mounting bracket — to 4" maximum for objects with leading edges between 27" and 80" above the finish floor. The notes restrict only the bracket protrusion, while the monitor mounted on the bracket adds additional depth (typica

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Detail F6 (BASE CABINET W/ ADA SINK) toe clearance depth at toe kick area does not demonstrate 17" minimum per Section 306.2.3
Architectural
High

Summary: Detail F6 shows an ADA sink configuration with an angled PLAM apron panel and fixed panels that permanently restrict the under-sink clearance space. At the toe kick area (below 9" CLR height), the drawing dimensions the horizontal toe kick depths as only '6" MIN' and '3"' — totaling approximately 9" of depth at the toe level from the face of the cabinet. In contrast, the three other ADA clearance details on the same sheet (F12, F9, and F3) all explicitly dimension the toe clearance d

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

Accessible Parking Spaces Missing Adjacent Access Aisles
Civil
High

Summary: The existing site plan identifies multiple parking spaces as handicap accessible without providing the required adjacent access aisles. In the southern parking lot, spaces designated 'H/C' are located contiguous to standard parking stalls ('N/C') and to each other without any hatched access aisles. Additionally, near the east entrance, two 'H/C' spaces are placed side-by-side without their own adjacent access aisles.

Why it matters: Addressing this issue before construction prevents costly rework and ensures code and coordination compliance.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify this issue with the design team.

This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.

Related case studies

Similar AI plan review results by project type and discipline. Browse all case studies

First $100 covered

Want this on your next set?

Start with the first $100 covered. See cited issues in hours, no call required.

  • Median 87 issues per project
  • 5+ issues or full refund
  • Results in hours

5+ issues or full refund · No demo required

View all case studies|See pricing