Residential Guest House: 16 Issues Found
An anonymized single-family guest house plan review uncovered 16 issues—structural conflicts, MEP coordination, and drawing consistency—before permit.
Enterprise & volume pricing
Key findings
Stair stringer quantity and size conflict across three sheets: (4) 1X12, (3) 2X14, and (3) 2X12
Structural
Three different stair stringer specifications are called out across the drawing set. The Upper Level Notes specify (4) 1X12 stringers; the East Elevation specifies (3) 2X14; the Floor Framing Notes specify (3) 2X12. Quantity and member size conflict.
ME1 gas dryer note conflicts with 'NO GAS' notes and dryer omitted from load calculations
Electrical
MPE Notes specify a gas dryer (STACK WASH 110 / DRY GAS). Same sheet states NO GAS APPLIANCES and NO GAS LINES. New Apartment Load Calculations list clothes dryer as quantity 0 with 0 VA.
Exterior stair stringer quantity and size conflict between A1.1 Upper Level notes and A2.1 East Elevation
Structural
Upper Level Notes specify exterior stair stringers as (4) 1X12; East Elevation specifies (3) 2X14 STRINGERS. Both describe the same exterior stair. Number and member size conflict.
Glulam beam width conflict: Garage plan 5.125" wide vs Floor Framing plan 5.25" wide
Structural
Garage Level Floor & Foundation Plan labels the continuous beam as 5.125" wide; Floor Framing plan calls out 5.25" wide for the same beam.
Roof sheathing thickness conflict on same sheet: R1 specifies 5/8" OSB, R5 specifies 1/2" OSB
Structural
Roof Framing Note R1 specifies 5/8" OSB; Note R5 specifies 1/2" OSB on the same sheet.
Roof truss pitch conflict: Note R4 specifies 5/12 but plan and building section show 3.5/12
Structural
Roof Framing Note R4 specifies 5/12 SCISSORS TRUSSES. Plan annotations and building section show 3.5/12 pitch.
CMU wall grouting requirement conflict: Wall Schedule all cells vs Plan Note selective grouting
Structural
Wall Schedule for WL-EXT1 specifies GROUT ALL CELLS; plan note specifies grouting at 4' OC. Conflicting requirements for garage-level CMU walls.
Exterior wall framing spacing conflicts (WL-EXT2: 24" OC vs Detail F1: 16" OC)
Structural
Wall schedule lists WL-EXT2 at 24" OC; Detail F1 specifies exterior stud wall at 16" OC.
Stair stringer size conflict: (3) 2X14 on East Elevation vs (3) 2X12 in Floor Framing Note
Structural
East Elevation specifies (3) 2X14 STRINGERS; Floor Framing Note 7 specifies (3) 2X12 STAIR STRINGER for the same stair.
Roof truss pitch specification conflict (section 3.5/12 vs framing note 5/12)
Architectural
Building Section specifies scissors trusses at 3.5/12 outer pitch. Framing plan note specifies 5/12. Elevations show 3.5/12.
Issue categories
Review details and suggested questions
Stair stringer quantity and size conflict across three sheets: (4) 1X12, (3) 2X14, and (3) 2X12StructuralCritical
Summary: Three different stair stringer specifications are called out across the drawing set. The Upper Level Notes specify (4) 1X12 stringers; the East Elevation specifies (3) 2X14; the Floor Framing Notes specify (3) 2X12. Quantity and member size conflict.
Why it matters: A plan checker will reject conflicting structural specifications. A 1X12 is a board (3/4" thick), while 2X14 and 2X12 are dimension lumber—these have vastly different structural capacity. Construction cannot proceed until a single specification is confirmed.
Suggested next step: Clarify the correct stair stringer quantity, size, and grade for the exterior stair. Provide a single consistent specification across all sheets.
RFI draft: Please clarify the correct stair stringer quantity and size. Revise all affected drawings to show a consistent specification.
ME1 gas dryer note conflicts with 'NO GAS' notes and dryer omitted from load calculationsElectricalCritical
Summary: MPE Notes specify a gas dryer (STACK WASH 110 / DRY GAS). Same sheet states NO GAS APPLIANCES and NO GAS LINES. New Apartment Load Calculations list clothes dryer as quantity 0 with 0 VA.
Why it matters: If a dryer is intended, electrical service/load calculations should account for it. Adding the dryer load could materially impact demand and panel/service sizing.
Suggested next step: Confirm whether a clothes dryer is intended and whether gas is permitted. Resolve conflict between DRY GAS and NO GAS notes. Update load calculations or revise notes.
RFI draft: Please confirm dryer intent and gas scope. Update ME1 load calculations to include dryer load or revise notes to reflect no dryer.
Exterior stair stringer quantity and size conflict between A1.1 Upper Level notes and A2.1 East ElevationStructuralCritical
Summary: Upper Level Notes specify exterior stair stringers as (4) 1X12; East Elevation specifies (3) 2X14 STRINGERS. Both describe the same exterior stair. Number and member size conflict.
Why it matters: This conflict impacts structural adequacy, material procurement, and code compliance. Using the wrong specification could result in an under-designed stair. The building department cannot verify structural adequacy until a single specification is provided.
Suggested next step: Clarify the exterior stair stringer specification. Confirm correct number and member size; revise all affected drawings.
RFI draft: Please clarify the exterior stair stringer specification and revise all drawings for consistency.
Glulam beam width conflict: Garage plan 5.125" wide vs Floor Framing plan 5.25" wideStructuralHigh
Summary: Garage Level Floor & Foundation Plan labels the continuous beam as 5.125" wide; Floor Framing plan calls out 5.25" wide for the same beam.
Why it matters: 5-1/8" is a standard manufactured glulam width; 5-1/4" is not. A plan checker will question the non-standard dimension and may reject until clarified.
Suggested next step: Confirm the correct glulam beam width. Standard manufactured widths are 3-1/8", 5-1/8", 6-3/4". Revise drawings for consistency.
RFI draft: Please confirm the correct glulam beam width and revise all references.
Roof sheathing thickness conflict on same sheet: R1 specifies 5/8" OSB, R5 specifies 1/2" OSBStructuralHigh
Summary: Roof Framing Note R1 specifies 5/8" OSB; Note R5 specifies 1/2" OSB on the same sheet.
Why it matters: Roof sheathing thickness affects structural span capacity, fastener schedules, and wind/seismic resistance. Conflicting notes prevent verification of compliance.
Suggested next step: Clarify the correct roof sheathing thickness. Confirm whether 5/8" OSB or 1/2" OSB with PSCL clips applies; update notes for consistency.
RFI draft: Please clarify roof sheathing thickness and align all notes.
Roof truss pitch conflict: Note R4 specifies 5/12 but plan and building section show 3.5/12StructuralHigh
Summary: Roof Framing Note R4 specifies 5/12 SCISSORS TRUSSES. Plan annotations and building section show 3.5/12 pitch.
Why it matters: A 5/12 pitch is significantly steeper than 3.5/12, resulting in different ridge height and truss geometry. Trusses manufactured to the wrong pitch will not match the building.
Suggested next step: Clarify the correct exterior roof pitch for the scissors trusses. Update Note R4 or plan annotations for consistency.
RFI draft: Please confirm correct roof pitch (3.5/12 or 5/12) and revise conflicting references.
CMU wall grouting requirement conflict: Wall Schedule all cells vs Plan Note selective groutingStructuralHigh
Summary: Wall Schedule for WL-EXT1 specifies GROUT ALL CELLS; plan note specifies grouting at 4' OC. Conflicting requirements for garage-level CMU walls.
Why it matters: Grouting all cells versus selective grouting represents a significant difference in wall structural capacity and rebar placement. Must be resolved for permit.
Suggested next step: Clarify whether garage-level CMU walls require full grouting or selective grouting at 48" OC. Revise schedule or plan notes.
RFI draft: Please clarify CMU grouting requirement and align Wall Schedule with plan notes.
Exterior wall framing spacing conflicts (WL-EXT2: 24" OC vs Detail F1: 16" OC)StructuralHigh
Summary: Wall schedule lists WL-EXT2 at 24" OC; Detail F1 specifies exterior stud wall at 16" OC.
Why it matters: Stud spacing affects structural design, shear/bracing assumptions, fastening, and insulation compliance. Conflict must be resolved before construction.
Suggested next step: Confirm the required exterior stud spacing for WL-EXT2. Revise either the wall schedule or Detail F1 for consistency.
RFI draft: Please confirm exterior stud spacing and align wall schedule with detail.
Stair stringer size conflict: (3) 2X14 on East Elevation vs (3) 2X12 in Floor Framing NoteStructuralHigh
Summary: East Elevation specifies (3) 2X14 STRINGERS; Floor Framing Note 7 specifies (3) 2X12 STAIR STRINGER for the same stair.
Why it matters: A 2X14 stringer provides significantly greater capacity than a 2X12. This discrepancy affects structural adequacy and must be resolved for permit.
Suggested next step: Confirm the correct stair stringer size—(3) 2X14 or (3) 2X12—and revise all affected drawings.
RFI draft: Please confirm stair stringer size and revise drawings for consistency.
Roof truss pitch specification conflict (section 3.5/12 vs framing note 5/12)ArchitecturalHigh
Summary: Building Section specifies scissors trusses at 3.5/12 outer pitch. Framing plan note specifies 5/12. Elevations show 3.5/12.
Why it matters: If trusses are manufactured to 5/12 they will not match the 3.5/12 roof profile shown on elevations and section.
Suggested next step: Confirm the correct roof pitch for the scissors trusses. Revise framing note or section to match.
RFI draft: Please confirm roof pitch and align framing notes with section and elevations.
Exterior column material and support conflict (16x16 CMU vs wood columns)ArchitecturalHigh
Summary: Exterior Elevations identify support columns as 16"x16" CMU. Another sheet specifies wood columns. Direct contradiction in material and structural design.
Why it matters: Fundamental conflict in material and structural design. CMU columns require different foundations and connections than wood. Must be resolved for permit.
Suggested next step: Clarify exterior column construction. Confirm whether 16"x16" CMU or wood columns; revise all sheets for consistency.
RFI draft: Please clarify exterior column construction and align all drawings.
Slab slope requirement conflicts (.5"/12" vs 1/4" per 12")StructuralMedium
Summary: Foundation notes require slab to slope away from building at .5"/12"; lower level plan notes require 1/4" per 12".
Why it matters: Conflicting slope requirements can cause grading/drainage disputes and inspection issues.
Suggested next step: Confirm the correct slab slope away from the building. Revise notes so a single slope requirement is shown.
RFI draft: Please confirm slab slope and align foundation and plan notes.
Guard/railing height inconsistent (42' AFF in notes vs 42" in section)ArchitecturalMedium
Summary: Upper level notes and elevation state railing height as 42' AFF; building section calls out 42" H'RAIL. Likely inches vs feet notation error.
Why it matters: Conflicting guard/rail height callouts can trigger plan review comments and field rework.
Suggested next step: Confirm the intended guard/railing height (inches vs feet). Correct all occurrences for consistency.
RFI draft: Please confirm guard/railing height and correct notation across all sheets.
Garage window tag on plan (WT.01) does not match window schedule mark (W1.01)ArchitecturalMedium
Summary: Garage plan labels a window as WT.01; window schedule lists the mark as W1.01.
Why it matters: Mismatched window mark can lead to ordering/installing the wrong unit and causes plan review comments.
Suggested next step: Confirm whether the intended window mark is W1.01 or WT.01. Update plan tag and/or schedule so they match.
RFI draft: Please align window tag on plan with window schedule mark.
Roof sheathing thickness conflict: 1/2" OSB on elevations vs 5/8" OSB in Roof Framing NoteStructuralMedium
Summary: Exterior Elevations specify roof sheathing as 1/2" OSB W/ PSCL CLIPS; Roof Framing Note specifies 5/8" OSB.
Why it matters: Roof sheathing thickness affects structural capacity of the roof diaphragm and allowable rafter/truss spacing.
Suggested next step: Confirm the correct roof sheathing thickness—1/2" OSB with PSCL clips or 5/8" OSB. Revise drawings for consistency.
RFI draft: Please confirm roof sheathing thickness and align elevations with framing notes.
This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.
Related case studies
Similar AI plan review results by project type and discipline. Browse all case studies
Want this on your next set?
Start with the first $100 covered. See cited issues in hours, no call required.
- Evidence-linked findings
- 5+ issues or full refund
- Results in hours
5+ issues or full refund · No demo required