188Potential findings
Flagged
  1. 1Critical · Architectural / StructuralGrab bars are scheduled to mount with drywall anchors
  2. 2Critical · Architectural / StructuralBuilding and its below-grade storm shelter carry different construction types
  3. 3Critical · Architectural / Life SafetyStair enclosures are drawn without exit access doors

Fig. 1 · Top findings, pinned on the set

Potential findings
188
Disciplines
7
Published examples
3
Critical or high examples shown
3

Checkers used on this project

Run the same check on your set →
Sheet 01·Case file

About this review

InspectMind ran an AI plan review on this multifamily set and returned 188 potential findings across Architectural, Structural, Civil, Mechanical, Plumbing, Electrical, Fire Protection. The selected examples below show the document conflict, why it matters, and a suggested next step.

Project type
Multifamily
Disciplines
Architectural, Structural, Civil, Mechanical, Plumbing, Electrical, Fire Protection
Potential findings
188
Published examples
3
Published
2026-11-09
Evidence status
Selected from open findings in the source review record

What this review documents

Check accessible unit details, construction types, and stair enclosure doors in an apartment building with a basement storm shelter.

The documented result is a set of review findings. This case study does not establish that corrections were completed or that savings were realized. The examples below were marked useful in the source review record; they have been paraphrased to remove identifying details.

Key findings

  1. 1

    Grab bars are scheduled to mount with drywall anchors

    Architectural / Structural · ICC A117.1 609.8

    Critical

    The accessory legend says all unit accessories mount into drywall with drywall anchors unless noted, and the same table lists the grab bars required at tubs and showers in accessible units.

    Next step: Require blocking or backing for all grab bars and revise the accessory legend.

  2. 2

    Building and its below-grade storm shelter carry different construction types

    Architectural / Structural · IBC 602.1

    Critical

    The code analysis classifies the building as Type VA but classifies the storm shelter beneath it as Type VB, even though a single building is classified as one construction type unless separated.

    Next step: Confirm one construction type for the building and shelter, or show the separation that allows two.

  3. 3

    Stair enclosures are drawn without exit access doors

    Architectural / Life Safety

    Critical

    Floor plans show continuous walls between corridors and several exit stair enclosures, with no door openings at some levels.

    Next step: Add rated exit access doors at each stair and level and update the door schedule.

Issue categories

Cat. 01Architectural / Structural
Architectural / Structural findings in the selected review excerpts.
Cat. 02Architectural / Life Safety
Architectural / Life Safety findings in the selected review excerpts.

Review details and suggested questions

01
Grab bars are scheduled to mount with drywall anchors

Architectural / Structural · ICC A117.1 609.8

Critical

Summary: The accessory legend says all unit accessories mount into drywall with drywall anchors unless noted, and the same table lists the grab bars required at tubs and showers in accessible units.

Why it matters: Grab bars must resist a 250-pound load, which drywall anchors cannot reliably carry.

Suggested next step: Require blocking or backing for all grab bars and revise the accessory legend.

RFI draft: Require blocking or backing for all grab bars and revise the accessory legend.

02
Building and its below-grade storm shelter carry different construction types

Architectural / Structural · IBC 602.1

Critical

Summary: The code analysis classifies the building as Type VA but classifies the storm shelter beneath it as Type VB, even though a single building is classified as one construction type unless separated.

Why it matters: Construction type drives ratings for the shelter ceiling and structure that support the building above.

Suggested next step: Confirm one construction type for the building and shelter, or show the separation that allows two.

RFI draft: Confirm one construction type for the building and shelter, or show the separation that allows two.

03
Stair enclosures are drawn without exit access doors

Architectural / Life Safety

Critical

Summary: Floor plans show continuous walls between corridors and several exit stair enclosures, with no door openings at some levels.

Why it matters: Occupants on those levels have no drawn path into the exit stairs.

Suggested next step: Add rated exit access doors at each stair and level and update the door schedule.

RFI draft: Add rated exit access doors at each stair and level and update the door schedule.

Anonymized, paraphrased excerpts from a completed project review. These three examples were selected editorially from findings the source review record kept open (not dismissed or marked wrong); that selection is not independent validation. The project total excludes duplicate-group members, dismissed findings, wrong finds, and insufficient-reference findings. Only selected excerpts are published. Customer identity, project address, source identifiers, and private drawings are omitted. Corrections, permit outcomes, and financial savings have not been independently verified. A qualified professional should assess each finding against the complete project documents.

Similar AI plan review results by project type and discipline.

Browse all case studies