Multifamily with Storm Shelter, Kansas City Metro, KS: 188 Issues Flagged
Check accessible unit details, construction types, and stair enclosure doors in an apartment building with a basement storm shelter.
Anonymized review · Published 2026-11-09
Free check on up to 10 drawing pages. Enterprise and volume pricing
- 1Critical · Architectural / StructuralGrab bars are scheduled to mount with drywall anchors
- 2Critical · Architectural / StructuralBuilding and its below-grade storm shelter carry different construction types
- 3Critical · Architectural / Life SafetyStair enclosures are drawn without exit access doors
Fig. 1 · Top findings, pinned on the set
- Potential findings
- 188
- Disciplines
- 7
- Published examples
- 3
- Critical or high examples shown
- 3
About this review
InspectMind ran an AI plan review on this multifamily set and returned 188 potential findings across Architectural, Structural, Civil, Mechanical, Plumbing, Electrical, Fire Protection. The selected examples below show the document conflict, why it matters, and a suggested next step.
- Project type
- Multifamily
- Disciplines
- Architectural, Structural, Civil, Mechanical, Plumbing, Electrical, Fire Protection
- Potential findings
- 188
- Published examples
- 3
- Published
- 2026-11-09
- Evidence status
- Selected from open findings in the source review record
What this review documents
Check accessible unit details, construction types, and stair enclosure doors in an apartment building with a basement storm shelter.
The documented result is a set of review findings. This case study does not establish that corrections were completed or that savings were realized. The examples below were marked useful in the source review record; they have been paraphrased to remove identifying details.
Key findings
- 1Critical
Grab bars are scheduled to mount with drywall anchors
Architectural / Structural · ICC A117.1 609.8
The accessory legend says all unit accessories mount into drywall with drywall anchors unless noted, and the same table lists the grab bars required at tubs and showers in accessible units.
Next step: Require blocking or backing for all grab bars and revise the accessory legend.
- 2Critical
Building and its below-grade storm shelter carry different construction types
Architectural / Structural · IBC 602.1
The code analysis classifies the building as Type VA but classifies the storm shelter beneath it as Type VB, even though a single building is classified as one construction type unless separated.
Next step: Confirm one construction type for the building and shelter, or show the separation that allows two.
- 3Critical
Stair enclosures are drawn without exit access doors
Architectural / Life Safety
Floor plans show continuous walls between corridors and several exit stair enclosures, with no door openings at some levels.
Next step: Add rated exit access doors at each stair and level and update the door schedule.
Issue categories
- Cat. 01Architectural / Structural
- Architectural / Structural findings in the selected review excerpts.
- Cat. 02Architectural / Life Safety
- Architectural / Life Safety findings in the selected review excerpts.
Review details and suggested questions
01Grab bars are scheduled to mount with drywall anchorsArchitectural / Structural · ICC A117.1 609.8
Critical
Architectural / Structural · ICC A117.1 609.8
Summary: The accessory legend says all unit accessories mount into drywall with drywall anchors unless noted, and the same table lists the grab bars required at tubs and showers in accessible units.
Why it matters: Grab bars must resist a 250-pound load, which drywall anchors cannot reliably carry.
Suggested next step: Require blocking or backing for all grab bars and revise the accessory legend.
RFI draft: Require blocking or backing for all grab bars and revise the accessory legend.
02Building and its below-grade storm shelter carry different construction typesArchitectural / Structural · IBC 602.1
Critical
Architectural / Structural · IBC 602.1
Summary: The code analysis classifies the building as Type VA but classifies the storm shelter beneath it as Type VB, even though a single building is classified as one construction type unless separated.
Why it matters: Construction type drives ratings for the shelter ceiling and structure that support the building above.
Suggested next step: Confirm one construction type for the building and shelter, or show the separation that allows two.
RFI draft: Confirm one construction type for the building and shelter, or show the separation that allows two.
03Stair enclosures are drawn without exit access doorsArchitectural / Life Safety
Critical
Architectural / Life Safety
Summary: Floor plans show continuous walls between corridors and several exit stair enclosures, with no door openings at some levels.
Why it matters: Occupants on those levels have no drawn path into the exit stairs.
Suggested next step: Add rated exit access doors at each stair and level and update the door schedule.
RFI draft: Add rated exit access doors at each stair and level and update the door schedule.
Anonymized, paraphrased excerpts from a completed project review. These three examples were selected editorially from findings the source review record kept open (not dismissed or marked wrong); that selection is not independent validation. The project total excludes duplicate-group members, dismissed findings, wrong finds, and insufficient-reference findings. Only selected excerpts are published. Customer identity, project address, source identifiers, and private drawings are omitted. Corrections, permit outcomes, and financial savings have not been independently verified. A qualified professional should assess each finding against the complete project documents.
Related case studies
Similar AI plan review results by project type and discipline.
- MultifamilyMultifamily Residential: 167 Issues Including Critical Mechanical, Fire Protection & Coordination Violations167issues · Fire Protection, Structural
- MultifamilyMultifamily Buildings, Central Massachusetts: 1,006 Issues Flagged1,006issues · Architectural, Structural
- MultifamilySenior Living Facility: 578 Issues Found in Pre-Permit Review578issues · Architectural, Fire Protection
- MultifamilyMultifamily Residential Development: 419 Issues Including Critical Fire, Egress & Code Violations419issues · Fire Protection, Structural
- MultifamilyMultifamily Residential: 363 Issues Including Critical Life Safety & Code Compliance Violations363issues · Architectural, Electrical
- CommercialRetail Store Build-Out: 220 Issues Including Critical Egress, Fire Protection & Code Violations220issues · Fire Protection, Structural