15Potential findings
Flagged
  1. 1Critical · ArchitecturalProposed bedroom has a door opening directly into the garage
  2. 2Critical · StructuralPlan shear forces are LRFD, but every schedule lists ASD capacities
  3. 3Critical · StructuralHoldown plates installed under an existing footing with no underpinning sequence

Fig. 1 · Top findings, pinned on the set

Potential findings
15
Disciplines
2
Codes referenced
4
Critical or high examples shown
15

Checkers used on this project

Run the same check on your set →
Sheet 01·Case file

About this review

InspectMind ran an AI plan review on this residential set and returned 15 potential findings across Structural, Architectural. The selected examples below show the document conflict, why it matters, and a suggested next step.

Project type
Residential
Disciplines
Structural, Architectural
Potential findings
15
Examples shown
15
Published
2026-11-20

Key findings

  1. 1

    Proposed bedroom has a door opening directly into the garage

    Architectural · IRC R302.5.1

    Critical

    The plan places a proposed bedroom next to the existing garage, with a door swing on the bedroom wall shared with the garage. The code prohibits openings from a private garage directly into a sleeping room.

  2. 2

    Plan shear forces are LRFD, but every schedule lists ASD capacities

    Structural · IBC 1604.2

    Critical

    Key Note 3 says the lateral shear forces on the plans are LRFD (1.0E). The Wood Shear Wall Schedule, Diaphragm Schedule, and Tie Strap Schedule all give capacities on an ASD basis.

  3. 3

    Holdown plates installed under an existing footing with no underpinning sequence

    Structural · IBC 1804.1

    Critical

    Details 1, 2, and 8 place a holdown bearing plate and nut below an existing footing and say to fill the excavated area below the footing. That requires digging out soil under the footing's bearing surface, and no shoring or underpinning sequence is shown.

Issue categories

Cat. 01Structural
Structural findings from the check.
Cat. 02Architectural
Architectural findings from the check.

Review details and suggested questions

01
Proposed bedroom has a door opening directly into the garage

Architectural · IRC R302.5.1

Critical

Summary: The plan places a proposed bedroom next to the existing garage, with a door swing on the bedroom wall shared with the garage. The code prohibits openings from a private garage directly into a sleeping room.

Why it matters: A direct garage-to-bedroom opening will be rejected at plan review and exposes sleeping occupants to garage fumes and fire.

Suggested next step: Revise the layout so the garage opens only into a non-sleeping space.

RFI draft: Please revise the bedroom and garage layout to remove the direct opening, provide access through a non-sleeping area, and coordinate protection for any remaining garage-to-dwelling openings.

02
Plan shear forces are LRFD, but every schedule lists ASD capacities

Structural · IBC 1604.2

Critical

Summary: Key Note 3 says the lateral shear forces on the plans are LRFD (1.0E). The Wood Shear Wall Schedule, Diaphragm Schedule, and Tie Strap Schedule all give capacities on an ASD basis.

Why it matters: Comparing strength-level forces to allowable capacities makes every lateral element check unreliable in one direction or the other.

Suggested next step: Put the plan forces and schedule capacities on one consistent design basis.

RFI draft: Please clarify the design method for the lateral system and make the plan shear forces and schedule capacities consistent, either all LRFD or all ASD.

03
Holdown plates installed under an existing footing with no underpinning sequence

Structural · IBC 1804.1

Critical

Summary: Details 1, 2, and 8 place a holdown bearing plate and nut below an existing footing and say to fill the excavated area below the footing. That requires digging out soil under the footing's bearing surface, and no shoring or underpinning sequence is shown.

Why it matters: Undermining an existing footing without protection can let it settle or fail during construction.

Suggested next step: Provide a sequenced underpinning or shoring procedure for the excavation under the existing footing.

RFI draft: Please provide an engineered, sequenced underpinning or shoring procedure for the excavation beneath the existing footing needed to install the holdown bearing plates.

04
Load path to the foundation is left for the contractor to verify during demolition

Structural

Critical

Summary: Notes on the plans say framing could not be verified on the site visit and must be verified during demo, that no bearing lines were found in the crawlspace, and that porch framing is not determined. New framing such as a beam under a bearing wall above has no confirmed support below.

Why it matters: Without a designed load path to the foundation, bearing walls and beams may land on nothing that can carry them.

Suggested next step: Verify crawlspace bearing conditions by exploratory demolition and complete the load path design before permit.

RFI draft: Please perform exploratory demolition to verify the existing crawlspace bearing conditions, provide an engineered continuous load path to the foundation for all bearing walls, and remove the preliminary site-visit notes from the construction set.

05
Main roof diaphragms specified as D1 (180 plf) where calcs show 308 and 389 plf

Structural

High

Summary: The lateral calcs give roof diaphragm unit shears of 308 plf on the left roof and 389 plf on the right roof. The roof framing plan calls out diaphragm D1 for both, and the Diaphragm Schedule rates D1 at only 180 plf. Even D4 is rated at only 320 plf.

Why it matters: The roof sheathing and nailing as scheduled cannot transfer the calculated seismic or wind shear.

Suggested next step: Upgrade the main roof diaphragms to a configuration rated for at least 389 plf.

RFI draft: Please revise the main roof diaphragm designation to a type that resists the 389 plf maximum demand, noting that D4 provides only 320 plf.

06
Shear wall SW3 scheduled at 1,100 plf, but calcs show 1,273 plf on that wall

Structural

High

Summary: The calculation package states the maximum shear transferred by wall S10, an SW3 wall, is 1,273 plf. The Wood Shear Wall Schedule gives SW3 a capacity of 1,100 plf.

Why it matters: If the demand is ASD level, the scheduled wall is under capacity.

Suggested next step: Confirm the basis of the 1,273 plf demand and upgrade SW3 if it exceeds the schedule.

RFI draft: Please confirm whether the 1,273 plf shear on S10 (SW3) is an LRFD or ASD value. If ASD, revise the SW3 sheathing and fastening to exceed 1,273 plf.

07
Floor diaphragm field nailing is 12 in. on the schedule and 10 in. in the wood notes

Structural

High

Summary: Structural Wood Note 8.B requires field nailing at 10 in. o.c. for 3/4 in. floor sheathing. The S201 Diaphragm Schedule lists 12 in. o.c. field nailing for the 3/4 in. floor diaphragms D2 and D4.

Why it matters: Crews following the schedule would install fewer nails than the notes require.

Suggested next step: Make the Diaphragm Schedule and Wood Note 8.B agree on field nailing spacing.

RFI draft: Please confirm the field nailing spacing for the 3/4 in. floor diaphragm and revise the S201 Diaphragm Schedule to 10 in. o.c. if Wood Note 8.B governs.

08
Roof diaphragm schedule calls for 8d nails where the wood notes require 10d

Structural

High

Summary: The Diaphragm Schedule specifies 8d nails for the 5/8 in. roof sheathing diaphragms D1 and D3. The Structural Wood Notes require 10d nails for 5/8 in. roof sheathing.

Why it matters: Smaller nails lower the diaphragm capacity below what the notes assume.

Suggested next step: Confirm the roof diaphragm nail size and correct the schedule or the notes.

RFI draft: Please confirm the correct nail size for roof diaphragms D1 and D3; the schedule shows 8d while the wood notes require 10d for 5/8 in. roof sheathing.

09
Retaining wall concrete specified at 2,500 psi, below the 3,000 psi minimum for R-3

Structural · IBC 1904.1

High

Summary: The concrete strength table lists 2,500 psi for the concrete retaining wall. For Group R-3, foundation walls and other vertical concrete exposed to weather must be at least 3,000 psi.

Why it matters: The specified mix does not meet the code minimum for weather-exposed vertical concrete.

Suggested next step: Raise the retaining wall and other weather-exposed vertical concrete to 3,000 psi.

RFI draft: Please update the concrete strength schedule to require at least 3,000 psi for the retaining wall and any other foundation walls or vertical surfaces exposed to weather.

10
Footing depth allows 18 in. minimum, but the retaining calc needs 24 in.

Structural

High

Summary: The retaining wall calculation requires a base depth (Df) of 2.00 ft for passive pressure and stability against sliding and overturning. The foundation details allow 18 in. minimum from finish grade to bottom of footing (frost depth).

Why it matters: A footing built to the 18 in. minimum would be shallower than the depth the stability check relies on.

Suggested next step: Require a 24 in. minimum footing depth where the retaining calc governs.

RFI draft: Please confirm the minimum stem wall footing depth and revise the details to 24 in. where the retaining wall calculation requires Df = 2.00 ft.

11
Foundation plan shows a 14 x 10 in. footing; calcs design a 16 x 12 in. footing

Structural

High

Summary: The foundation plan gives a typical footing of 14 in. wide by 10 in. deep under the 8 in. stem wall. The structural calculations use an inverted tee section with a 16 in. wide by 12 in. thick footing.

Why it matters: A footing built to the plan would be narrower and thinner than the one that was designed.

Suggested next step: Confirm the footing dimensions and update the plan to match the calculations.

RFI draft: Please confirm the stem wall footing size (14 x 10 in. on the plan vs. 16 x 12 in. in the calcs) and update the drawings to match.

12
Two lap splice tables at f′c = 2,500 psi give different Class B lengths

Structural

High

Summary: The S300 Detail 9 splice schedule lists Class B lap lengths at 2,500 psi such as #4 = 41/31 in. and #8 = 101/78 in. (top/other). The S100 lap splice table for the same bars, grade, and strength gives #4 = 37/29 in. and #8 = 93/72 in.

Why it matters: Two conflicting tables leave the field to pick a splice length, and the shorter one may not be what was designed.

Suggested next step: Reconcile the two tables into one set of Class B splice lengths.

RFI draft: Please confirm which Class B lap splice values govern at f′c = 2,500 psi (S300 Detail 9 or the S100 table) and revise the drawings so only one consistent set is shown.

13
Slab-on-grade is 4 in. on the foundation plan and 6 in. in the S301 details

Structural

High

Summary: The foundation plan specifies a 4 in. concrete slab-on-grade. Several typical connection details on S301 show the slab as 6 in. thick.

Why it matters: The slab thickness affects excavation, concrete quantity, and the connection details that depend on it.

Suggested next step: Confirm the slab thickness and correct the plan or the details.

RFI draft: Please confirm whether the slab-on-grade is 4 in. as on the foundation plan or 6 in. as shown in the S301 details.

14
CPT44Z post bases specified for 4x6 and 4x8 posts

Structural

High

Summary: The framing plan calls for CPT44Z post base connectors at new 4x6 and 4x8 DF#1 posts. The CPT44Z is sized for a nominal 4x4 post.

Why it matters: A 4x4 connector will not fit or properly support a larger post.

Suggested next step: Specify post bases sized for each post, such as CPT46Z and CPT48Z.

RFI draft: Please revise the post base connectors to match the post sizes shown, for example CPT46Z at 4x6 posts and CPT48Z at 4x8 posts.

15
Anchor rods specified as ASTM D1554 instead of ASTM F1554

Structural

High

Summary: The steel materials table specifies anchor rods as ASTM D1554, Grade 36/55. There is no ASTM D1554 anchor rod standard; structural anchor rods are specified under ASTM F1554.

Why it matters: An invalid material standard can stall submittals and leave the anchor rod material undefined.

Suggested next step: Correct the anchor rod designation to ASTM F1554.

RFI draft: Please confirm anchor rods are to conform to ASTM F1554 (Grade 36/55) and correct the structural notes from ASTM D1554.