AI-powered plan checking for construction drawings and specs: code compliance, cross-discipline coordination, and constructability review. Miami projects checked against FBC 2023 (8th Ed), FBC HVHZ provisions. Same-day results with evidence for every finding.
Upload your Miami project drawings, select applicable codes, and get a same-day report with every potential violation referenced to the specific code section and drawing location. You can also upload custom code PDFs: local amendments, agency-specific standards, or project-specific requirements.
InspectMind checks your drawings against FBC 2023 (8th Ed) requirements and flags violations with code references.
InspectMind checks your drawings against FBC HVHZ provisions requirements and flags violations with code references.
Florida projects must meet the Florida Building Code (FBC), which is among the strictest in the nation for wind resistance. Miami-Dade and Broward County are in the High-Velocity Hurricane Zone (HVHZ), requiring additional testing and documentation for building envelope components. InspectMind checks your Miami drawings against FBC wind provisions, flood zone requirements, and all applicable state amendments.
InspectMind handles all project types, from high-rise to luxury residential. Upload architectural,structural,civil, andMEP drawings together for cross-discipline coordination review.
Upload your Miami project PDFs: architectural, structural, civil, MEP. Any format, any size.
Choose FBC 2023 (8th Ed), and any custom codes. Add your own code PDFs.
Same-day report with every issue referenced to code section and drawing location. Export to Excel.
AI structural plan check for beams, columns, foundations, and connections. Catch coordination and code issues before permit or the field.
AI MEP coordination review for mechanical, electrical, and plumbing systems. Catch clashes and spec conflicts before construction.
AI fire and life safety review against NFPA, IBC Chapter 9, and local fire codes. Catch egress, fire rating, and sprinkler issues.
Pre-permit plan review catches the same issues building departments catch: code violations, egress, ADA, fire, so you fix them first.
AI civil drawing review for grading, erosion control, SWPPP, and utility plans. Catch issues before you submit to the city.
AI code compliance check against IBC, state-specific codes, and local amendments. Catch violations before plan check.