502Potential findings
Flagged
  1. 1Critical · Fire Protection / ArchitecturalCombustible concealed spaces above ceilings are not addressed for sprinklers
  2. 2Critical · ArchitecturalExit path runs through storage rooms
  3. 3Critical · StructuralHigh roof has no defined lateral load path

Fig. 1 · Top findings, pinned on the set

Potential findings
502
Disciplines
7
Published examples
3
Critical or high examples shown
3

Checkers used on this project

Run the same check on your set →
Sheet 01·Case file

About this review

InspectMind ran an AI plan review on this commercial set and returned 502 potential findings across Fire Protection, Architectural, Structural, Civil, Mechanical, Electrical, Plumbing. The selected examples below show the document conflict, why it matters, and a suggested next step.

Project type
Commercial
Disciplines
Fire Protection, Architectural, Structural, Civil, Mechanical, Electrical, Plumbing
Potential findings
502
Published examples
3
Published
2026-11-09
Evidence status
Selected from open findings in the source review record

What this review documents

Check sprinkler coverage in combustible concealed spaces, egress through storage, and lateral load paths in a CLT and glulam building.

The documented result is a set of review findings. This case study does not establish that corrections were completed or that savings were realized. The examples below were marked useful in the source review record; they have been paraphrased to remove identifying details.

Key findings

  1. 1

    Combustible concealed spaces above ceilings are not addressed for sprinklers

    Fire Protection / Architectural · NFPA 13

    Critical

    The building is Type VB with a CLT roof deck and glulam framing, and suspended ceilings below the deck form concealed spaces of combustible construction. The fire protection notes only call for heads in finished areas.

    Next step: Show sprinkler protection for the concealed spaces and soffits, or document the NFPA 13 exception used.

  2. 2

    Exit path runs through storage rooms

    Architectural · IBC 1016.2

    Critical

    The life safety plan assigns 73 occupants to an exit reached by passing through a work room and then a storage room classified as S-2.

    Next step: Reroute the egress path through a corridor or reclassify and protect the rooms involved.

  3. 3

    High roof has no defined lateral load path

    Structural

    Critical

    A CLT and glulam high roof over clerestory walls must deliver wind loads to the low roof diaphragm or to braced frames, but the set does not show how.

    Next step: Detail the high roof diaphragm connections and the collectors or frames that carry load to the low roof.

Issue categories

Cat. 01Fire Protection / Architectural
Fire Protection / Architectural findings in the selected review excerpts.
Cat. 02Architectural
Architectural findings in the selected review excerpts.
Cat. 03Structural
Structural findings in the selected review excerpts.

Review details and suggested questions

01
Combustible concealed spaces above ceilings are not addressed for sprinklers

Fire Protection / Architectural · NFPA 13

Critical

Summary: The building is Type VB with a CLT roof deck and glulam framing, and suspended ceilings below the deck form concealed spaces of combustible construction. The fire protection notes only call for heads in finished areas.

Why it matters: Unprotected combustible concealed spaces are a known fire spread path and a common plan review comment.

Suggested next step: Show sprinkler protection for the concealed spaces and soffits, or document the NFPA 13 exception used.

RFI draft: Show sprinkler protection for the concealed spaces and soffits, or document the NFPA 13 exception used.

02
Exit path runs through storage rooms

Architectural · IBC 1016.2

Critical

Summary: The life safety plan assigns 73 occupants to an exit reached by passing through a work room and then a storage room classified as S-2.

Why it matters: Egress through storage rooms is restricted because stored goods can block the path.

Suggested next step: Reroute the egress path through a corridor or reclassify and protect the rooms involved.

RFI draft: Reroute the egress path through a corridor or reclassify and protect the rooms involved.

03
High roof has no defined lateral load path

Structural

Critical

Summary: A CLT and glulam high roof over clerestory walls must deliver wind loads to the low roof diaphragm or to braced frames, but the set does not show how.

Why it matters: Without a defined load path, the clerestory walls and high roof are not documented to resist wind.

Suggested next step: Detail the high roof diaphragm connections and the collectors or frames that carry load to the low roof.

RFI draft: Detail the high roof diaphragm connections and the collectors or frames that carry load to the low roof.

Anonymized, paraphrased excerpts from a completed project review. These three examples were selected editorially from findings the source review record kept open (not dismissed or marked wrong); that selection is not independent validation. The project total excludes duplicate-group members, dismissed findings, wrong finds, and insufficient-reference findings. Only selected excerpts are published. Customer identity, project address, source identifiers, and private drawings are omitted. Corrections, permit outcomes, and financial savings have not been independently verified. A qualified professional should assess each finding against the complete project documents.