InspectMind AI logo InspectMind

Multifamily Phase 3: 393 755 Issues Found

A comprehensive plan review of a multifamily residential development uncovered 393 issues: including electrical emergency power conflicts, structural truss coordination, mechanical fire damper requirements, and architectural egress violations, before construction.

First $100 covered. Enterprise and volume pricing

Potential findings
755
Disciplines
5
Codes referenced
5
Critical or high examples shown
15

About this review

InspectMind ran an AI plan review on this project set and returned 755 potential findings across Electrical, Architectural, Mechanical, Structural, Plumbing. The selected examples below show the document conflict, why it matters, and a suggested next step.

Disciplines
Electrical, Architectural, Mechanical, Structural, Plumbing
Potential findings
755
Examples shown
15

Key findings

  1. Issue #842

    Electrical · NFPA 101

    Critical

    Issue #842

  2. Issue #668

    Architectural

    Critical

    Issue #668

  3. Issue #847

    Electrical

    Critical

    Issue #847

  4. Issue #851

    Electrical

    Critical

    Issue #851

  5. Issue #854

    Electrical

    Critical

    Issue #854

  6. Issue #822

    Fire Protection

    Critical

    Issue #822

  7. Issue #667

    Architectural

    Critical

    Issue #667

  8. Issue #807

    Mechanical

    Critical

    Issue #807

  9. Issue #815

    Mechanical

    Critical

    Issue #815

  10. Issue #816

    Fire Protection

    Critical

    Issue #816

Issue categories

Electrical
Electrical systems, panelboards, circuits, emergency power, and electrical code compliance
Architectural
Egress, accessibility, room layouts, building code compliance, and finish specifications
Mechanical
HVAC systems, ventilation, exhaust, refrigerant piping, and mechanical code compliance
Structural
Structural connections, load paths, foundation design, and structural code compliance
Plumbing
Plumbing fixtures, drainage, venting, water supply, and plumbing code compliance

Review details and suggested questions

Issue #842

Electrical · NFPA 101

Critical

Summary: Issue #842

Why it matters: This issue could cause code violations and may prevent plan approval for Multifamily Residential projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #842

Issue #668

Architectural

Critical

Summary: Issue #668

Why it matters: This issue could cause code violations and may prevent plan approval for Multifamily Residential projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #668

Issue #847

Electrical

Critical

Summary: Issue #847

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Multifamily Residential projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #847

Issue #851

Electrical

Critical

Summary: Issue #851

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Multifamily Residential projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #851

Issue #854

Electrical

Critical

Summary: Issue #854

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Multifamily Residential projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #854

Issue #822

Fire Protection

Critical

Summary: Issue #822

Why it matters: Failure to address this issue may result in construction delays and costly rework during Multifamily Residential construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #822

Issue #667

Architectural

Critical

Summary: Issue #667

Why it matters: This issue could cause code violations and may prevent plan approval for Multifamily Residential projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #667

Issue #807

Mechanical

Critical

Summary: Issue #807

Why it matters: This coordination issue could lead to field conflicts and change orders in Multifamily Residential projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #807

Issue #815

Mechanical

Critical

Summary: Issue #815

Why it matters: This issue could cause code violations and may prevent plan approval for Multifamily Residential projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #815

Issue #816

Fire Protection

Critical

Summary: Issue #816

Why it matters: Failure to address this issue may result in construction delays and costly rework during Multifamily Residential construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #816

Issue #855

Electrical

Critical

Summary: Issue #855

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Multifamily Residential projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #855

Issue #812

Mechanical

Critical

Summary: Issue #812

Why it matters: Failure to address this issue may result in construction delays and costly rework during Multifamily Residential construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #812

Issue #804

Mechanical

Critical

Summary: Issue #804

Why it matters: This coordination issue could lead to field conflicts and change orders in Multifamily Residential projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #804

Issue #803

Mechanical

Critical

Summary: Issue #803

Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Multifamily Residential projects.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #803

Issue #829

Electrical

Critical

Summary: Issue #829

Why it matters: Failure to address this issue may result in construction delays and costly rework during Multifamily Residential construction.

Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.

RFI draft: Please clarify: Issue #829

This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.

Similar AI plan review results by project type and discipline.

Browse all case studies