Multifamily Phase 3: 393 755 Issues Found
A comprehensive plan review of a multifamily residential development uncovered 393 issues: including electrical emergency power conflicts, structural truss coordination, mechanical fire damper requirements, and architectural egress violations, before construction.
First $100 covered. Enterprise and volume pricing
- Potential findings
- 755
- Disciplines
- 5
- Codes referenced
- 5
- Critical or high examples shown
- 15
About this review
InspectMind ran an AI plan review on this project set and returned 755 potential findings across Electrical, Architectural, Mechanical, Structural, Plumbing. The selected examples below show the document conflict, why it matters, and a suggested next step.
- Disciplines
- Electrical, Architectural, Mechanical, Structural, Plumbing
- Potential findings
- 755
- Examples shown
- 15
Key findings
- Critical
Issue #842
Electrical · NFPA 101
Issue #842
- Critical
Issue #668
Architectural
Issue #668
- Critical
Issue #847
Electrical
Issue #847
- Critical
Issue #851
Electrical
Issue #851
- Critical
Issue #854
Electrical
Issue #854
- Critical
Issue #822
Fire Protection
Issue #822
- Critical
Issue #667
Architectural
Issue #667
- Critical
Issue #807
Mechanical
Issue #807
- Critical
Issue #815
Mechanical
Issue #815
- Critical
Issue #816
Fire Protection
Issue #816
Issue categories
- Electrical
- Electrical systems, panelboards, circuits, emergency power, and electrical code compliance
- Architectural
- Egress, accessibility, room layouts, building code compliance, and finish specifications
- Mechanical
- HVAC systems, ventilation, exhaust, refrigerant piping, and mechanical code compliance
- Structural
- Structural connections, load paths, foundation design, and structural code compliance
- Plumbing
- Plumbing fixtures, drainage, venting, water supply, and plumbing code compliance
Review details and suggested questions
Issue #842Electrical · NFPA 101
Critical
Electrical · NFPA 101
Summary: Issue #842
Why it matters: This issue could cause code violations and may prevent plan approval for Multifamily Residential projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #842
Issue #668Architectural
Critical
Architectural
Summary: Issue #668
Why it matters: This issue could cause code violations and may prevent plan approval for Multifamily Residential projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #668
Issue #847Electrical
Critical
Electrical
Summary: Issue #847
Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Multifamily Residential projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #847
Issue #851Electrical
Critical
Electrical
Summary: Issue #851
Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Multifamily Residential projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #851
Issue #854Electrical
Critical
Electrical
Summary: Issue #854
Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Multifamily Residential projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #854
Issue #822Fire Protection
Critical
Fire Protection
Summary: Issue #822
Why it matters: Failure to address this issue may result in construction delays and costly rework during Multifamily Residential construction.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #822
Issue #667Architectural
Critical
Architectural
Summary: Issue #667
Why it matters: This issue could cause code violations and may prevent plan approval for Multifamily Residential projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #667
Issue #807Mechanical
Critical
Mechanical
Summary: Issue #807
Why it matters: This coordination issue could lead to field conflicts and change orders in Multifamily Residential projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #807
Issue #815Mechanical
Critical
Mechanical
Summary: Issue #815
Why it matters: This issue could cause code violations and may prevent plan approval for Multifamily Residential projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #815
Issue #816Fire Protection
Critical
Fire Protection
Summary: Issue #816
Why it matters: Failure to address this issue may result in construction delays and costly rework during Multifamily Residential construction.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #816
Issue #855Electrical
Critical
Electrical
Summary: Issue #855
Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Multifamily Residential projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #855
Issue #812Mechanical
Critical
Mechanical
Summary: Issue #812
Why it matters: Failure to address this issue may result in construction delays and costly rework during Multifamily Residential construction.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #812
Issue #804Mechanical
Critical
Mechanical
Summary: Issue #804
Why it matters: This coordination issue could lead to field conflicts and change orders in Multifamily Residential projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #804
Issue #803Mechanical
Critical
Mechanical
Summary: Issue #803
Why it matters: Addressing this issue before construction prevents costly rework and ensures code compliance for Multifamily Residential projects.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #803
Issue #829Electrical
Critical
Electrical
Summary: Issue #829
Why it matters: Failure to address this issue may result in construction delays and costly rework during Multifamily Residential construction.
Suggested next step: Review drawings and specifications to resolve this conflict before construction begins.
RFI draft: Please clarify: Issue #829
This is an anonymized example. Findings shown are excerpts for illustration. Actual project details have been modified to protect client confidentiality.
Related case studies
Similar AI plan review results by project type and discipline.
- MultifamilyLarge Multifamily Plan Review: 757 Issues Found758 issues · Architectural, Civil
- MultifamilyOffice / Multifamily: 2,664 Issues Found2,664 issues · Structural, Architectural
- MultifamilyMultifamily Renovation: 838 Issues Found838 issues · Architectural, Civil
- MultifamilyCalifornia Coastal Multifamily: 628 Issues Found629 issues · Architectural, Civil
- MultifamilySenior Living Facility: 578 Issues Found in Pre-Permit Review578 issues · Architectural, Fire Protection
- MultifamilyMultifamily Residential Development: 419 Issues Including Critical Fire, Egress & Code Violations419 issues · Fire Protection, Structural