Operations Center, Idaho: 186 Issues Flagged
Check equipment voltages, door schedules, and heat trace circuits in an operations and shop facility.
Anonymized review · Published 2026-11-09
Free check on up to 10 drawing pages. Enterprise and volume pricing
- 1High · Electrical / PlumbingWater heater voltage differs between electrical and plumbing schedules
- 2High · ArchitecturalOne door number is assigned to two different assemblies
- 3High · ElectricalHeat cable circuits are 2-pole on a 120/208V panel for 120V cables
Fig. 1 · Top findings, pinned on the set
- Potential findings
- 186
- Disciplines
- 7
- Published examples
- 3
- Critical or high examples shown
- 3
About this review
InspectMind ran an AI plan review on this municipal set and returned 186 potential findings across Electrical, Plumbing, Architectural, Mechanical, Landscape, Civil, Structural. The selected examples below show the document conflict, why it matters, and a suggested next step.
- Project type
- Municipal
- Disciplines
- Electrical, Plumbing, Architectural, Mechanical, Landscape, Civil, Structural
- Potential findings
- 186
- Published examples
- 3
- Published
- 2026-11-09
- Evidence status
- Selected from open findings in the source review record
What this review documents
Check equipment voltages, door schedules, and heat trace circuits in an operations and shop facility.
The documented result is a set of review findings. This case study does not establish that corrections were completed or that savings were realized. The examples below were marked useful in the source review record; they have been paraphrased to remove identifying details.
Key findings
- 1High
Water heater voltage differs between electrical and plumbing schedules
Electrical / Plumbing
The electrical schedule lists the main water heater at 208V three phase, while the plumbing schedule lists the same heater at 480V three phase.
Next step: Confirm the water heater voltage and align both schedules and the circuit.
- 2High
One door number is assigned to two different assemblies
Architectural
The door schedule lists the same shop door number twice, once as a 3-by-7-foot hollow metal door and once as a 14-by-14-foot overhead steel door.
Next step: Assign unique door numbers and update the plans and hardware groups.
- 3High
Heat cable circuits are 2-pole on a 120/208V panel for 120V cables
Electrical
A branch panel schedules the roof, gutter, and pipe heat cable circuits as 2-pole 20A loads, while the specification lists the heat cables at 120V.
Next step: Change the heat cable circuits to single-pole 120V or specify 208V cable.
Issue categories
- Cat. 01Electrical / Plumbing
- Electrical / Plumbing findings in the selected review excerpts.
- Cat. 02Architectural
- Architectural findings in the selected review excerpts.
- Cat. 03Electrical
- Electrical findings in the selected review excerpts.
Review details and suggested questions
01Water heater voltage differs between electrical and plumbing schedulesElectrical / Plumbing
High
Electrical / Plumbing
Summary: The electrical schedule lists the main water heater at 208V three phase, while the plumbing schedule lists the same heater at 480V three phase.
Why it matters: Heaters are built for one voltage, and the mismatch surfaces at delivery.
Suggested next step: Confirm the water heater voltage and align both schedules and the circuit.
RFI draft: Confirm the water heater voltage and align both schedules and the circuit.
02One door number is assigned to two different assembliesArchitectural
High
Architectural
Summary: The door schedule lists the same shop door number twice, once as a 3-by-7-foot hollow metal door and once as a 14-by-14-foot overhead steel door.
Why it matters: Hardware, frames, and openings are ordered by door number, so duplicates cause wrong deliveries.
Suggested next step: Assign unique door numbers and update the plans and hardware groups.
RFI draft: Assign unique door numbers and update the plans and hardware groups.
03Heat cable circuits are 2-pole on a 120/208V panel for 120V cablesElectrical
High
Electrical
Summary: A branch panel schedules the roof, gutter, and pipe heat cable circuits as 2-pole 20A loads, while the specification lists the heat cables at 120V.
Why it matters: Feeding 120V heat cable with 208V can damage it and create a fire risk.
Suggested next step: Change the heat cable circuits to single-pole 120V or specify 208V cable.
RFI draft: Change the heat cable circuits to single-pole 120V or specify 208V cable.
Anonymized, paraphrased excerpts from a completed project review. These three examples were selected editorially from findings the source review record kept open (not dismissed or marked wrong); that selection is not independent validation. The project total excludes duplicate-group members, dismissed findings, wrong finds, and insufficient-reference findings. Only selected excerpts are published. Customer identity, project address, source identifiers, and private drawings are omitted. Corrections, permit outcomes, and financial savings have not been independently verified. A qualified professional should assess each finding against the complete project documents.
Related case studies
Similar AI plan review results by project type and discipline.
- MunicipalMunicipal Aquatics Center: 407 Issues Found407issues · Architectural, Civil
- MEP CommercialPlan Review: 224 Issues Found224issues · Architectural, Civil
- MEP CommercialSelect-Service Hotel: 209 Issues Found209issues · Architectural, Civil
- MEP CommercialOntario Site Plan Review: 280 Issues Found280issues · Architectural, Civil
- MEP CommercialPlan Review: 263 Issues Found263issues · Architectural, Civil
- CommercialAutomotive Showroom Remodel: 137 Issues Found137issues · Architectural, Civil