Operations Center, Idaho: 186 Issues Flagged

Check equipment voltages, door schedules, and heat trace circuits in an operations and shop facility.

Anonymized review · Published 2026-11-09

Free check on up to 10 drawing pages. Enterprise and volume pricing

186Potential findings
Flagged
  1. 1High · Electrical / PlumbingWater heater voltage differs between electrical and plumbing schedules
  2. 2High · ArchitecturalOne door number is assigned to two different assemblies
  3. 3High · ElectricalHeat cable circuits are 2-pole on a 120/208V panel for 120V cables

Fig. 1 · Top findings, pinned on the set

Potential findings
186
Disciplines
7
Published examples
3
Critical or high examples shown
3

Checkers used on this project

Run the same check on your set →
Sheet 01·Case file

About this review

InspectMind ran an AI plan review on this municipal set and returned 186 potential findings across Electrical, Plumbing, Architectural, Mechanical, Landscape, Civil, Structural. The selected examples below show the document conflict, why it matters, and a suggested next step.

Project type
Municipal
Disciplines
Electrical, Plumbing, Architectural, Mechanical, Landscape, Civil, Structural
Potential findings
186
Published examples
3
Published
2026-11-09
Evidence status
Selected from open findings in the source review record

What this review documents

Check equipment voltages, door schedules, and heat trace circuits in an operations and shop facility.

The documented result is a set of review findings. This case study does not establish that corrections were completed or that savings were realized. The examples below were marked useful in the source review record; they have been paraphrased to remove identifying details.

Key findings

  1. 1

    Water heater voltage differs between electrical and plumbing schedules

    Electrical / Plumbing

    High

    The electrical schedule lists the main water heater at 208V three phase, while the plumbing schedule lists the same heater at 480V three phase.

    Next step: Confirm the water heater voltage and align both schedules and the circuit.

  2. 2

    One door number is assigned to two different assemblies

    Architectural

    High

    The door schedule lists the same shop door number twice, once as a 3-by-7-foot hollow metal door and once as a 14-by-14-foot overhead steel door.

    Next step: Assign unique door numbers and update the plans and hardware groups.

  3. 3

    Heat cable circuits are 2-pole on a 120/208V panel for 120V cables

    Electrical

    High

    A branch panel schedules the roof, gutter, and pipe heat cable circuits as 2-pole 20A loads, while the specification lists the heat cables at 120V.

    Next step: Change the heat cable circuits to single-pole 120V or specify 208V cable.

Issue categories

Cat. 01Electrical / Plumbing
Electrical / Plumbing findings in the selected review excerpts.
Cat. 02Architectural
Architectural findings in the selected review excerpts.
Cat. 03Electrical
Electrical findings in the selected review excerpts.

Review details and suggested questions

01
Water heater voltage differs between electrical and plumbing schedules

Electrical / Plumbing

High

Summary: The electrical schedule lists the main water heater at 208V three phase, while the plumbing schedule lists the same heater at 480V three phase.

Why it matters: Heaters are built for one voltage, and the mismatch surfaces at delivery.

Suggested next step: Confirm the water heater voltage and align both schedules and the circuit.

RFI draft: Confirm the water heater voltage and align both schedules and the circuit.

02
One door number is assigned to two different assemblies

Architectural

High

Summary: The door schedule lists the same shop door number twice, once as a 3-by-7-foot hollow metal door and once as a 14-by-14-foot overhead steel door.

Why it matters: Hardware, frames, and openings are ordered by door number, so duplicates cause wrong deliveries.

Suggested next step: Assign unique door numbers and update the plans and hardware groups.

RFI draft: Assign unique door numbers and update the plans and hardware groups.

03
Heat cable circuits are 2-pole on a 120/208V panel for 120V cables

Electrical

High

Summary: A branch panel schedules the roof, gutter, and pipe heat cable circuits as 2-pole 20A loads, while the specification lists the heat cables at 120V.

Why it matters: Feeding 120V heat cable with 208V can damage it and create a fire risk.

Suggested next step: Change the heat cable circuits to single-pole 120V or specify 208V cable.

RFI draft: Change the heat cable circuits to single-pole 120V or specify 208V cable.

Anonymized, paraphrased excerpts from a completed project review. These three examples were selected editorially from findings the source review record kept open (not dismissed or marked wrong); that selection is not independent validation. The project total excludes duplicate-group members, dismissed findings, wrong finds, and insufficient-reference findings. Only selected excerpts are published. Customer identity, project address, source identifiers, and private drawings are omitted. Corrections, permit outcomes, and financial savings have not been independently verified. A qualified professional should assess each finding against the complete project documents.