Career and Technical Center, West Virginia: 273 Issues Flagged

Check fire alarm sequences, elevator recall, and slab materials between drawings and specifications for a technical school.

Anonymized review · Published 2026-11-09

Free check on up to 10 drawing pages. Enterprise and volume pricing

273Potential findings
Flagged
  1. 1Critical · Electrical / Fire Protection / ArchitecturalArea smoke detectors do not release magnetically locked egress doors
  2. 2High · Electrical / Fire ProtectionElevator recall and shutdown inputs differ from the specification
  3. 3High · StructuralUnderslab vapor retarder callout uses a material the specification prohibits

Fig. 1 · Top findings, pinned on the set

Potential findings
273
Disciplines
7
Published examples
3
Critical or high examples shown
3

Checkers used on this project

Run the same check on your set →
Sheet 01·Case file

About this review

InspectMind ran an AI plan review on this education set and returned 273 potential findings across Electrical, Fire Protection, Architectural, Structural, Civil, Mechanical, Plumbing. The selected examples below show the document conflict, why it matters, and a suggested next step.

Project type
Education
Disciplines
Electrical, Fire Protection, Architectural, Structural, Civil, Mechanical, Plumbing
Potential findings
273
Published examples
3
Published
2026-11-09
Evidence status
Selected from open findings in the source review record

What this review documents

Check fire alarm sequences, elevator recall, and slab materials between drawings and specifications for a technical school.

The documented result is a set of review findings. This case study does not establish that corrections were completed or that savings were realized. The examples below were marked useful in the source review record; they have been paraphrased to remove identifying details.

Key findings

  1. 1

    Area smoke detectors do not release magnetically locked egress doors

    Electrical / Fire Protection / Architectural

    Critical

    The fire alarm matrix includes an output that releases magnetically locked egress doors, but the area smoke detector row leaves that output blank while still triggering alarm and evacuation.

    Next step: Mark the door release output for area smoke detectors and confirm the lock power supply interface.

  2. 2

    Elevator recall and shutdown inputs differ from the specification

    Electrical / Fire Protection

    High

    The matrix sends the elevator heat detector and sprinkler flow switch to recall and delayed power shutdown, and the riser puts a shaft heat detector on recall. The specification limits recall initiators to specific smoke detectors and ties heat detection to power shutdown.

    Next step: Align the matrix and riser with the specified recall and shutdown sequence.

  3. 3

    Underslab vapor retarder callout uses a material the specification prohibits

    Structural · ASTM E1745

    High

    The foundation plan calls for a 10-mil poly vapor retarder, while the specification requires an ASTM E1745 Class A retarder and prohibits single-ply polyethylene.

    Next step: Revise the foundation note to the specified Class A vapor retarder.

Issue categories

Cat. 01Electrical / Fire Protection / Architectural
Electrical / Fire Protection / Architectural findings in the selected review excerpts.
Cat. 02Electrical / Fire Protection
Electrical / Fire Protection findings in the selected review excerpts.
Cat. 03Structural
Structural findings in the selected review excerpts.

Review details and suggested questions

01
Area smoke detectors do not release magnetically locked egress doors

Electrical / Fire Protection / Architectural

Critical

Summary: The fire alarm matrix includes an output that releases magnetically locked egress doors, but the area smoke detector row leaves that output blank while still triggering alarm and evacuation.

Why it matters: Locked egress doors that do not release on alarm can trap occupants during an evacuation.

Suggested next step: Mark the door release output for area smoke detectors and confirm the lock power supply interface.

RFI draft: Mark the door release output for area smoke detectors and confirm the lock power supply interface.

02
Elevator recall and shutdown inputs differ from the specification

Electrical / Fire Protection

High

Summary: The matrix sends the elevator heat detector and sprinkler flow switch to recall and delayed power shutdown, and the riser puts a shaft heat detector on recall. The specification limits recall initiators to specific smoke detectors and ties heat detection to power shutdown.

Why it matters: Wrong recall programming can send cars to the wrong floor or cut power at the wrong time.

Suggested next step: Align the matrix and riser with the specified recall and shutdown sequence.

RFI draft: Align the matrix and riser with the specified recall and shutdown sequence.

03
Underslab vapor retarder callout uses a material the specification prohibits

Structural · ASTM E1745

High

Summary: The foundation plan calls for a 10-mil poly vapor retarder, while the specification requires an ASTM E1745 Class A retarder and prohibits single-ply polyethylene.

Why it matters: Slabs placed over the wrong retarder can cause flooring failures that show up after occupancy.

Suggested next step: Revise the foundation note to the specified Class A vapor retarder.

RFI draft: Revise the foundation note to the specified Class A vapor retarder.

Anonymized, paraphrased excerpts from a completed project review. These three examples were selected editorially from findings the source review record kept open (not dismissed or marked wrong); that selection is not independent validation. The project total excludes duplicate-group members, dismissed findings, wrong finds, and insufficient-reference findings. Only selected excerpts are published. Customer identity, project address, source identifiers, and private drawings are omitted. Corrections, permit outcomes, and financial savings have not been independently verified. A qualified professional should assess each finding against the complete project documents.